Existing Building Approval Submission Process Improvement Effect Analysis thru Utilization of BIM

  • 발행 : 2015.10.11

초록

Advanced countries have mandated applying BIM in construction projects. Also, Public Procurement Service has planned to mandate applying BIM to all construction project that ordered in PPS from 2016 in KOREA. However, now Seumter that is building administration system is not supported BIM based construction license BIM information from Seumter. Thus, despite the applicant is preparing a BIM model, they do not take advantage of BIM information in Seumter. In previous studies. We developed a BIM based building approval submission system. In this study, we verified the system that developed in previous research. As a result, requirement information input time reduction in Seumter system showed high satisfaction. But there was as low usability because building approval submission system cannot support some information for building approval in seumter. If the system will do utilization and management with the building approval system, the applicant can be using BIM base design document information and saving the time that takes at building approval submission. Study about the system improvement is required for application to building approval system.

키워드

과제정보

This research was supported by a grant(15AUDP-C067809-01) from Architecture & Urban Development Research Program funded by Ministry of Land, Infrastructure and Transport of Korean government.