• Title/Summary/Keyword: BIM Use

Search Result 294, Processing Time 0.024 seconds

Development of Parametric BIM Libraries for Civil Structures using National 2D Standard Drawings (국가 표준도를 이용한 토목 구조물 BIM 파라메트릭 라이브러리 구축에 관한 연구)

  • Kim, Cheong-Woon;Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.128-138
    • /
    • 2014
  • Development of infrastructure component libraries is a critical requirement for the accelerated adoption of BIM in the civil engineering sector. Libraries reduce the time for BIM model creation, allows accurate quantity take offs, and shared use of standard models in a project. However, such libraries are currently in very short supply in the domestic infrastructure domain. This research introduces library components for retaining walls and box culverts generated from 2D standard drawings made publicly available by MOLIT. Commercial BIM software was used to create the concrete geometry and rebar, and dimensional/volumetric parameters were defined to maximize the reuse and generality of the libraries. Use of the these libraries in a project context demonstrates that they allow accurate and quick quantity take offs, and easier management of geometric information through the use of a single library as to numerous 2D drawings. It also demonstrates the easy modification of the geometries of the components if and when they need to changed. However, the application also showed that some of the rebar components (stirrups and length wise rebars) do not get properly updated when concrete geometries are changed, demonstrating the limits of current software applications. The research provides evidence of the many advantages of using BIM libraries in the civil engineering, thus providing the incentive for further development of standard libraries and promoting the use of BIM in infrastructure projects.

Effectiveness Analysis of BIM-based Architectural Facility Management Scenario (BIM 기반 건축 시설물 유지관리 시나리오 효과 분석)

  • Kang, Tae-Wook;Kim, Ji-Eun;Choi, Hyun-Sang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.11
    • /
    • pp.10-19
    • /
    • 2016
  • Recently, according to a public order with BIM regulations, various technologies of facility management (FM) have been studied to use BIM data effectively. The technology for BIM-based FM, such as BIM data standard, BIM modeling, BIM server, and BIM-GIS platform, reverse engineering based on 3D image scans is developing constantly. On the other hand, there has been little research on the range of FM based on BIM, the role of actors by management works, the difference, and difference in effects between original FM and BIM-based FM. This study examined the scenario of architectural FM based on BIM and confirmed the effect. For this, after analyzing the research trends, the range of FM applications and the role of actors by management works were defined, and the effectiveness analysis of a BIM-based architectural FM scenario was deduced.

Impact Analysis of BIM Spread on Mechanical Design Process Based on Consciousness Survey among Japanese Mechanical Engineers

  • Hiyama, Kyosuke;Diao, Yunting;Kato, Shisuke;Koganei, Makoto
    • International Journal of High-Rise Buildings
    • /
    • v.2 no.2
    • /
    • pp.97-104
    • /
    • 2013
  • Recently, the demand for Building Information Modeling (BIM) construction drawings and specifications has increased rapidly. Many countries have also started to implement BIM. The BIM implementation can change the design flow of buildings including high-rise buildings. Against this background, many companies are focusing on the development of BIM software. BIM involves a three-dimensional CAD program that can examine the placement of ductwork and machinery. It significantly increases the efficiency of a mechanical design through data unification using standard Industry Foundation Classes (IFC). In addition, BIM functions as a database to simplify the use of simulation technology for designing air-conditioning systems. To further develop BIM, it is important to know the expectations of mechanical engineers who will become frequent users of BIM in the future. A survey was conducted among Japanese mechanical engineers using a questionnaire to analyze the expectations of mechanical design using BIM. The results show that many respondents strongly recognize BIM as a three-dimensional CAD program. However they also expect that BIM can help the optimization of their design works and enhance design functionality by running simulations utilizing BIM.

A Basic Study on the Development of the BIM Service Level Assessment Process (BIM 서비스 수준 평가 프로세스 개발을 위한 기초연구)

  • An, Ji-Won;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.1
    • /
    • pp.87-93
    • /
    • 2019
  • In recent years, BIM services have been used in many construction projects. However, they are raising the question that there are many differences between what was initially proposed and what was actually done. In the IT sector, a method called as SLA is used to perform an assessment of the services delivered to the IT service project. In this respect, this study intends to introduce this method into building construction projects to use BIM in order to propose evaluation criteria and the evaluation process for SLA-based BIM service. The BIM service assessment process and criteria presented are judged to help introduce consistent and systematic BIM services in construction projects.

Integrated Architectural Engineering Design Process Using BIM Tools (BIM 도구 활용을 통한 건축공학설계의 프로세스)

  • Kang, Da-Young;Shin, Kyoo-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.175-178
    • /
    • 2010
  • Public institutions and owners have been introduced to use Building Information Modeling (BIM) tools. Learning BIM becomes an important factor in design process of undergrad program. The purpose of this study is to demonstrate an integrated architectural engineering design process using BIM tools. BIM education programs are analyzed to compare the level of detail in BIM education. An architectural engineering design class needs to involve BIM to introduce integrated process. An architectural engineering design process needs be based on understanding design, building structure, construction and building services. 3D Modeling helps understanding a building structure and checking environment-friendly element analysis. As a result of this research, new process of design education is proposed under four issues.

  • PDF

A Study on the Current Guideline Trends and Strategic Directions for Developing Open BIM Guideline (개방형 BIM 지침 개발에 관한 국외의 지침 분석 및 전략적 방향에 관한 연구)

  • Seo, Jong-Cheol;Kim, In-Han
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.58-66
    • /
    • 2009
  • Recently, the BIM paradigm in domestic and foreign countries has been recognized as a momentum that can enhance productivity, efficiency, and collaboration of work in the construction industry. In this aspect, some countries have driven the development of BIM guideline to introduce and apply the Open BIM which is IFC-based BIM. Whereas, introduction and application of the BIM in Korea has been tried partly by several government agencies, public companies, design and construction companies. To promote the proliferation in the BIM use, therefore, the guideline needs to be developed first of all than anything else. In this context, this study addresses the trends of the BIM guidelines of foreign countries and strategic directions necessary for developing the Open BIM guideline.

BIM data mapping based on M-BDL for BIM-BEMS connection (BIM-BEMS 연계를 위한 M-BDL 기반 BIM 데이터 맵핑)

  • Kang, Tae-Wook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.9
    • /
    • pp.348-354
    • /
    • 2018
  • This study proposes MF (Model Filter)-based M-BDL (MF-based BIM Data Linkage), which is a model filter-based data mapping method for BIM (Building Information Modeling)-BEMS linkage. Recently, BEMS (Building Energy Management System) is actively utilizing 3D spatial information. This allows the user to intuitively manage the facility energy linked to spatial information. To use BIM data in energy management systems, it is essential to link BEMS with BIM data only in terms of the user requirements. On the other hand, if the BIM is a rich dataset and is linked as it is, the user will need to manage the unnecessary information. By mapping only the data required for BEMS in heavy BIM data through M-BDL, the BIM data can be lightened and the amount of data required for maintenance can be reduced. This technology proposes a mapping method that can link the BIM data with the filtered BIM data.

A Study on BIM-based Facility Management System Architecture Development considering the heterogeneous solution data integration (BIM과 이기종 솔류션 데이터 통합을 고려한 시설물관리 시스템 아키텍처 개발에 관한 연구)

  • Kang, Tae Wook;Choi, Hyun Sang
    • Spatial Information Research
    • /
    • v.21 no.4
    • /
    • pp.25-34
    • /
    • 2013
  • The purpose of this study is to develop an efficient BIM-based FM(Facility Management) system architecture to integrate the heterogeneous solution data related to FM. The heterogeneous solution data can be an FM system, asset management system, or facility sensor database systems, as well as files created by a modeler. In this study, we define the consideration for the external heterogeneous data integration related to BIM-based FM and propose the methodology. To implement it, trends in related studies were reviewed and general use cases of BIM-based FM were derived to develop the architecture for the integration between BIM and the heterogeneous solution data. The component architecture was designed to implement the use cases, and the schema was developed for the prototype by using the proposed architecture.

A Study on the Evaluation Items of BIM Process Maturity Measurement Model (BIM 프로세스 성숙도 측정 모델의 평가항목에 대한 연구)

  • Lee, Jae-sung;Ock, Jong-ho
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.3
    • /
    • pp.281-295
    • /
    • 2016
  • Lately, the management of domestic BIM performance is quite lacking, as the evaluation and management data from successful cases of BIM implementation both on projects and in companies, and related effects (time, cost and other physical gains) are not well kept for future use in BIM development. In order to overcome the above obstacles, a systematic approach to evaluating BIM adoption with focus on particular elements like BIM implementation environment and processes, and the physical factors yielded by BIM, is necessary. In this study, objective and detailed assessment indicators and weights that are appropriate for the domestic situation were derived through research for purposes of developing a web-based BIM maturity measurement program that is tailor-made for the Korean construction atmosphere. Through a company's self-maturity measurement, excellent quality of BIM deliverables and output can be achieved and managed. Furthermore, the domestic BIM capacity can gradually increase since design firms' BIM capability can be judged during procurement basing on measurement indicators.

Research of Application and Facilitation of BIM on Military Facilities (국방 군사시설의 BIM적용 및 활성화 방안 연구)

  • Gong, Keum-Rok
    • Journal of KIBIM
    • /
    • v.7 no.4
    • /
    • pp.1-7
    • /
    • 2017
  • Since its beginning the military has continued updating its equipments and facilities by modernizing and expanding them. However, with rapidly growing technologies and business management skills, the time for military facilities' evolvement seems unavoidable. The Defense Installations Agency (DIA) has come to a conclusion that application of BIM is necessary. Since its decision, the DIA has been researching the use of BIM and developing guidelines for its application. Nevertheless, the speed of instructions and practical implementation of its model have been behind its plan due to various reasons. To overcome its limitations, the DIA has come up with three-step-solution: basic experience, budgeting, and expansion. Due to numerous number of projects of BIM, it is almost impractical to implement all of them concurrently. The methodological approach of the research employs the Delphi survey method to quantitatively analyze qualitative information drawn from experts' opinions. By applying the Delphi survey method, the first round of the survey drew lists of constraints, BIM application scenarios as well as BIM promotion measures. Afterwards, at the second round of the survey, criticality of each item collected at the 1st round was analyzed to reach a conclusion. Finally, constraints against BIM application were analyzed, and BIM application scenarios and promotion measures for the BIM were introduced.