• 제목/요약/키워드: BIM Application

검색결과 322건 처리시간 0.029초

BIM Awareness Assessment among Hydropower Professionals in Nepal

  • Bhattarai, Sushmit Sharma;Kisi, Krishna P.
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1154-1161
    • /
    • 2022
  • Building Information Modelling (BIM) has evolved into a comprehensive, collaborative method in construction project delivery. Most industrialized and developed countries have made BIM mandatory in the government and public projects, whereas developing countries are embracing and catching up BIM technologies to improve their professional's abilities and reduce claims in the construction projects. However, BIM awareness and professional's competence have become critical in implementing BIM in infrastructure projects in Nepal, particularly hydropower projects. The objectives of this study are to find the BIM awareness among hydropower professionals in Nepal and assess their response. The study used a questionnaire survey to assess the awareness. The results showed that only few professionals (12 percentage in this study) are aware of BIM and its application in Hydropower infrastructures. Majority of the respondents (more than 50%) were interested in BIM trainings and believed BIM implementation in future projects. The study indicated that lack of BIM training and lack of BIM awareness were the top factors affecting BIM implementation in hydropower projects in Nepal. The findings showed that about 66 percent of the respondents who used BIM in their projects mainly used during construction phase. More than 80 percent believed that BIM should be mandated for the hydropower projects in Nepal. The findings presented in this study could promote awareness among different professionals, organization, and construction team and encourage BIM implementation in Hydropower projects. The findings could raise awareness of BIM in Nepal's infrastructure sectors and its invaluable benefits in construction.

  • PDF

모듈러주택 품질관리를 위한 BIM 적용 방안 (BIM Application Method for the Quality Management of Modular Houses)

  • 이동건;김진원;손정락
    • 토지주택연구
    • /
    • 제10권2호
    • /
    • pp.59-67
    • /
    • 2019
  • The recent paradigm shift in the construction industry has led to a growing demand for industrial construction. In particular, interest in modular housing, one of the areas of industrialization architecture, is soaring. Modular housing is a construction method for completing a building by transporting factory-built modules to the site and assembling them. However, modular housing in Korea has various problems such as errors in design books, lack of factory drawings, and lack of on-site construction plans. BIM is a tool for accumulating, producing and managing various information through 3D models and is a solution to solve various problems of modular housing. In this study, problems of modular housing and BIM utilization of modular housing were presented as ways to ensure the quality of modular housing. Therefore, this study analyzed the problems that are occurring in the construction process of modular housing. And, to address the problem of modular housing, BIM utilization measures were proposed for each modular process step. However, the application of BIM in domestic modular project is currently being carried out in pilot research project. Because of this, the BIM utilize method for modular housing is limited based on the BIM use for general projects and the examples for some modular pilot projects.

BIM 적용을 위한 공간정보의 정확도 기반 활용성 평가 (Accuracy-based Evaluation of the Utilization of Spatial Information for BIM Application)

  • 김두표
    • 한국산업융합학회 논문집
    • /
    • 제26권4_2호
    • /
    • pp.669-678
    • /
    • 2023
  • Recently, spatial information has been applied to various fields and its usability is increasing day by day. In particular, in the field of civil engineering and construction, BIM based on spatial information is being applied to all construction industries and related research has been conducted. BIM is a technology that utilizes spatial information from the design phase and aids in the construction and maintenance of buildings, including the management of their attributes. However, to apply BIM technology to existing buildings, it takes a lot of time and money to produce models based on design drawings along with current surveying. In this study, quantitative and qualitative analysis was conducted to determine the applicability of the acquired data and the applicability of BIM by generating data and analyzing the accuracy using UAV images and ground lidar, which are representative spatial information acquisition methods. Quantitative analysis revealed that TLS (Terrestrial Laser Scanner) showed reliable accuracy in both planar and elevation measurements, whereas unmanned aerial images exhibited lower accuracy in elevation measurements, resulting in reduced reliability. Qualitative analysis indicated that neither TLS nor unmanned aerial images alone provided perfect completeness. However, the combination of both spatial information sources, tailored to specific needs, resulted in the most comprehensive completeness. Therefore, it is concluded that the appropriate utilization of spatial information acquired through unmanned aerial images and TLS holds the potential for application in the fields of BIM and reverse engineering.

철도인프라 BIM기반 공사 발주를 위한 평가기준 제안 연구 - 기존 발주사업 적용 사례를 통해 - (A Proposal Research of Assessment Standards for Ordering BIM-based Projects in Railway Infrastructure - Case Study on Application of Existing Projects -)

  • 손서연;이근일;정지현;문우형
    • 한국BIM학회 논문집
    • /
    • 제11권4호
    • /
    • pp.10-19
    • /
    • 2021
  • In the evaluation for ordering BIM-based projects (Design Build) of Korean National Railway, criteria of BIM-based smart construction technology are assessed. Unlike the existing assessment criteria, performance resources and detailed assessment guidelines have been added by this research. The purpose of this study is to propose qualification assessment standards according to specific guidelines when evaluating on the phase of bidding for BIM-based projects. In the study, an improved evaluation standard (draft) was arranged based on two consultation meetings and surveys of related companies, applied to existing projects with the companies that won the bid, and validated. As more specific and added criteria compared to the existing standards, it could reduce the difficulty of evaluation for BIM capability and lay the foundation for railway BIM-based project management.

4D CAD시스템의 기능분석 및 선형시설물 적용을 위한 기능 개선 방안 (Functional Analysis of 4D CAD System and Improvement of Function for Applying Linear Construction Project)

  • 김현승;강인석
    • 한국산학기술학회논문지
    • /
    • 제19권9호
    • /
    • pp.269-278
    • /
    • 2018
  • 국내 BIM기술은 건축공사를 중심으로 적용되고 있으나, 최근 정부에서 인프라시설물 BIM적용 의무화를 검토하고 있으므로 토목공사까지 급속히 확대 적용될 것으로 예상된다. 인프라시설물은 광범위한 수평적 공간에서 공정이 진행되므로 BIM기술의 적용은 설계단계의 간섭관리보다는 시공단계의 공정관리 등 사업관리 전반에서 더욱 활용성을 갖게 된다. 4D CAD시스템은 시공단계의 공정관리에 적용되는 대표적인 BIM기술이나 실무적으로 활용할 수 있는 기능의 부족으로 실제 프로젝트에 적용되는 사례는 제한적이다. 본 연구에서는 상용화된 대표적인 4종류의 4D CAD시스템의 기능을 비교분석하여 프로젝트 특성별 선택 기준을 제공하고 실무적 활용성을 갖기 위해 개선되어야 할 기능을 분석하였다. 기능 분석결과로서 시스템별 장단점을 제시하였으며 시스템별 특성 분석으로 사용자의 활용 편리성을 제시하였다. 또한 토목시설물에 적용 가능한 기능 개선을 위하여 선형 4D시뮬레이션 방법론을 개발하여 인프라 시설물의 시공단계 BIM으로 활용성을 높일 수 있는 방안을 제시하였다. 철도 및 도로시설 공사에서 토공, 교량, 터널 등의 대부분 공정들은 수평적 공간에서 거리 축에 따라 작업이 진행된다. 따라서 단순히 기존 Gantt chart 방식의 4D 표현방법보다는 거리 축에 따라 공정이 표현되는 선형 4D 시뮬레이션 방법이 보다 실무적으로 도움이 될 수 있다.

개방형 BIM 기반 라이브러리의 IFD 활용을 위한 기초연구 (A Study on Usage of IFD of Open BIM-Based Library)

  • 조동완;김인한;서종철;김종헌
    • 한국CDE학회논문집
    • /
    • 제16권2호
    • /
    • pp.137-145
    • /
    • 2011
  • A variety of BIM libraries are required to apply BIM(Building Information Modeling) software and generate BIM data. However, enterprises are establishing their own libraries using BIM tools, the drawbacks are that these libraries are not open to other users, or they just can be used in some software packages. If IFC(Industry Foundation Classes), the standard format of open BIM, can be applied, the BIM library can be applied in all the BIM software packages. Although the enterprises can collaborate using IFC standard, it is difficult to represent all the property information of the construction materials by IFC. IFD(International Framework for Dictionaries) is used to solve these problems and add the property information of the construction materials easily. Therefore, Open RIM-based library needs to be developed using IFD. In this research, the development and application of BIM library and IFD in domestic and foreign countries were investigated and analyzed, and Open BIM-based IFD scenario was proposed for using, and finally by applying an IFD method, the IFD data was added within an IFC model. Consequently, Open BIM-based library can be extended with rich, formal, and semantic descriptions and enhance data interoperability among BIM software packages adopting Open BIM standard format, by applying the IFD.

실시설계단계 BIM 기반 도면 작업 효율 향상을 위한 도면화 템플릿 개발 (Developing a Drawing Template for BIM software to Improve BIM-based Drawing Work Efficiency in the Construction Document Phase)

  • 김이제;김인채;진상윤
    • 한국BIM학회 논문집
    • /
    • 제10권4호
    • /
    • pp.98-109
    • /
    • 2020
  • Based on the prior research which developed the consistency review checklist of the BIM model and 2D drawing through the drawing analysis of the construction documents phase, the apparent limits of the existing template and the template development items were derived. As well, the BIM-based drawing templates of the construction documentation phase were developed and verified using ArchiCAD BIM software. The developed template was then applied to the actual project model in the construction documents phase, and, as a result, 50% of existing work elements could be utilized as templates. This is an increase of more than 30% over the existing template utilization elements, and it is analyzed to be effective in practical application and utilization. Based on the results of this study, if the BIM model construction criteria matching the drawing's utilization purpose are presented, while at the same time the BIM data interlocking and drawing template development studies are conducted, the utilization of BIM data can be maximized and additional drawing work can be minimized to increase the percentage of template utilization elements. In addition, it is believed that this can employed to address functional and institutional problems of BIM-based drawing and make a contribution to the activation of BIM.

상수도시설물의 유지관리를 위한 BIM모델 개발 및 BIM 데이터 관리방안 (Development of BIM models and management of BIM data for waterworks maintenance)

  • 박재현;이현동;곽필재
    • 상하수도학회지
    • /
    • 제28권6호
    • /
    • pp.669-679
    • /
    • 2014
  • 3D-based BIM(Building Information Modeling) technologies can be utilized effectively as a means of systematic management of facility information for safety assurance and effective maintenance of waterworks facilities. In this study, BIM models of water treatment facilities that can be used as basic data for BIM-based maintenance of waterworks facilities were developed. Information exchange and generality of the developed BIM models were evaluated by conducting interoperability analysis of IFC(Industry Foundation Classes) conversion models. In addition, the application of COBie(Construction Operations Building information exchange) was recommended as an effective countermeasure to deal with technical limitation regarding exchange and utilization of facilities-related information through current IFC models. The results of this study can contribute to the development of BIM-based maintenance system for waterworks facilities.

BIM-GIS Interoperability for Highway Traffic Information Sharing

  • Hu, Xiaoqiang;Bao, Jieyi;Jiang, Yi;Li, Shuo
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1051-1058
    • /
    • 2022
  • Information sharing is the main purpose of realizing interoperability between the application domains of Geographic Information System (GIS) and Building Information Modeling (BIM). This paper presents and describes the workflow of BIM-GIS interoperability for highway traffic information sharing. An innovative and automatic Dynamo process was presented to transfer the shapes and attributes of the shapefile from GIS to BIM. On the basis of the transformed BIM model, the detailed traffic data was added and expressed in the form of families and sheets to expand traffic information. Then, the shapes of the model were swept as solid geometries in the BIM environment applying Dynamo. The expanded BIM model was transferred back to the GIS system using the Industry Foundation Classes (IFC) scheme. The mutual communication between BIM and GIS was achieved based on Dynamo and IFC. This paper provides a convenient and feasible way to realize BIM-GIS interoperability for highway traffic information sharing according to the characteristics of highways in terms of graphic expression and model creation.

  • PDF

Existing Building Approval Submission Process Improvement Effect Analysis thru Utilization of BIM

  • Yeo, Chang-Jae;Yu, Jung-ho
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.664-664
    • /
    • 2015
  • Advanced countries have mandated applying BIM in construction projects. Also, Public Procurement Service has planned to mandate applying BIM to all construction project that ordered in PPS from 2016 in KOREA. However, now Seumter that is building administration system is not supported BIM based construction license BIM information from Seumter. Thus, despite the applicant is preparing a BIM model, they do not take advantage of BIM information in Seumter. In previous studies. We developed a BIM based building approval submission system. In this study, we verified the system that developed in previous research. As a result, requirement information input time reduction in Seumter system showed high satisfaction. But there was as low usability because building approval submission system cannot support some information for building approval in seumter. If the system will do utilization and management with the building approval system, the applicant can be using BIM base design document information and saving the time that takes at building approval submission. Study about the system improvement is required for application to building approval system.

  • PDF