International conference on construction engineering and project management
/
2013.01a
/
pp.426-432
/
2013
The construction industry consists of various and massive architectural information as an architectural process includes a variety of design stages with cooperation of many disciplines. Particularly, architectural information is generated and managed through the life cycle of a building, from conceptual design stage to the construction and maintenance. A Building Information Model (BIM) serves as a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle from inception onward. BIM technology accomplished quantitative development being utilized in various disciplines. However, it is necessary to develop environment and requirement for qualitative improvement of BIM based project. Particularly, requirement is very important for architectural design evaluations. The purpose of this study is to develop and apply of quality control requirement for improving the quality of architectural design in open BIM environments. To achieve this purpose, the authors have investigated case study for open BIM data quality control (software, guideline and application case) and classified quality control targets according to physical/logical quality and data quality. In addition, the authors have defined open BIM based quality control process and developed quality control requirements. Finally, the authors have developed rule based quality check system using requirements for efficient quality control based on open BIM.
Korean Journal of Construction Engineering and Management
/
v.14
no.1
/
pp.133-143
/
2013
BIM can be utilized variously in construction management(CM) in the respect that it helps to manage comprehensively the construction information and make reliable decisions, but the adoption of BIM is insufficient in the CM area. The purpose of this study is to develop work process models and their guides in order to utilize BIM effectively in CM work at construction stage. This study defined BIM functions as 'BIM converting design', 'Model review', 'Data extraction', 'Automatic estimate', '4D simulation', 'Drawing creation', 'Engineering sector linkage analysis' through literature search, and generated CM works applicable to BIM by analyzing the CM work and process. This study developed BIM-based CM work process models by reconstructing the existing work process in connection with BIM function through an analysis on the relationship between BIM function and CM work, and reconstructing the role of each project participants. In order to improve the usefulness of the developed models, guides that described the BIM works of project participants were prepared through interviews and case studies. To validate the utilization of the models, a comparative analysis on the BIM process of precedent studies was also made and a survey was conducted on experts. This study can contribute to increasing the utilization of BIM in the CM area and can be helpful for CM companies to develop an in-house BIM guide. In the future, it will be necessary to make an assessment on the models from a business perspective through case applications and constantly update BIM-based CM work process model in consideration of the expansion of CM work due to the application of BIM.
Kwangho So;Bohwan Oh;Yongjik Lee;Hyungeun Lee;Taehun Ha
International conference on construction engineering and project management
/
2011.02a
/
pp.12-16
/
2011
Building Information Modeling (BIM) is being widely spread in AEC industry worldwide and also in South Korea. Although the creation of digital model is better to be started at design stage, it can also improve the productivity of construction by simulating the actual construction process and environment. This paper presents application of BIM-based simulations related with design changes to transfer floors in 58-storey reinforced concrete office building. Transfer floor is not only a structurally important part of the building but also a challenging part of the actual construction in terms of sequence and period due to the complexity of the work. Preconstruction of rebar, mechanical, and plumbing is performed to review the construction drawings and to perform clash detection. Each item of application is evaluated for its effectiveness on actual construction and for the development potential.
Kim, Ji-Yun;Lee, Da-Un;Song, A-Reum;Yun, Seok-Heon
Journal of the Korea Institute of Building Construction
/
v.14
no.5
/
pp.497-503
/
2014
In order to facilitate the application of BIM technologies in construction projects, a lot of developed countries such as Singapore and the United States are developing a technology development road-map of BIM. In order to develop it, current status of BIM technology in domestic projects must be analyzed in advance. In this study, the element technologies of BIM was identified and the current status and the importance priorities of them were analyzed and evaluated. The result shows that the level of technology developments is behind that of other advanced countries in most of the elements. In technology importance analysis, the BIM based preliminary planning technology and the standards for BIM service contracts are ranked in the high position and their developments are also delayed in Korea. The results of this analysis could show the direction of BIM technology development and also be used for developing the technology roadmap of BIM.
Journal of the Korea Institute of Building Construction
/
v.18
no.2
/
pp.169-176
/
2018
The purpose of this study is to analyze the effects of applying BIM to the construction phase on preventing rework. Previous studies have presented the contribution of BIM in various ways, but a more practical and reliable analysis methodology are required. In this study, a BIM effect analysis methodology was proposed after collecting requirements on BIM effect analysis from field professionals. In the case study, the rework prevention effect was analyzed based on the proposed methodology. As a result, it was found that BIM application produced the rework prevention effect of approximately KRW 370,519,593. In addition, a consultation with field professionals on the suitability of the proposed methodology and effect analysis results were revealed that the results were sufficiently reliable. The results of this study can be used as efficient basic materials for research on BIM performance measurement in the future.
Kim, Jin-Kwang;Yoo, Moo-Young;Ham, Nam-Hyuk;Kim, Jae-Jun;Choi, Chang-Shik
Journal of KIBIM
/
v.8
no.2
/
pp.41-50
/
2018
The current study focused on the utilization of building information modeling (BIM) data in steel-frame structures, which help to reduce project durations because they employ prefabricated structural members that are assembled on-site. In addition, a business process model was proposed using BIM data collected during the preconstruction, structural steel fabrication, and on-site construction phases of an actual steel-frame project. The ultimate expectation is that BIM data support at each phase, as well as the increased understanding among project participants, will result in an increase in project management productivity. The results from the current study are summarized as follows: To implement a BIM capable of application to steel-frame projects and data utilization, existing theories were studied to develop the construction project steps, both generally into the preconstruction (A1), steel fabrication (A2), and on-site construction phases, (A3) and specifically into 19 BIM-applicable phases. Based on the derived BIM-applicable phases, the model elements of the BIM object were identified, and the shortcomings of existing steel-frame projects were ameliorated, resulting in an improved data flow model. Moreover, for the proposed BIM data flow to progress efficiently, the BIM specialist needs to be well-acquainted with the phase-specific three-dimensional (3D) model output, and the infrastructure to construct an error-free 3D model must be provided. Based on the actual construction example, the BIM data utilized steel-frame projects - via production reports, clash checks, two-dimensional (2D) drawings, four-dimensional (4D) simulations, and 3D scanning - to make cooperation and communication among participants easier.
Recently, mandatory BIM design has been enforced in the civil engineering field, focusing on public projects, and inducement measures to actively participate in BIM by participating subjects are required. The BIM ordering documents must reflect the characteristics of the BIM project, current construction standards and laws, and environmental conditions of domestic participants. In this study, we analyze the ordering documents used in domestic and overseas civil engineering BIM projects to determine whether they meet the purpose of BIM. In the future, items that consider the existing heterogeneous data linkage and compatibility, the connectivity with the current construction guidelines and laws, the cost of the designer and the input personnel are prepared for the part that does not meet the BIM purpose. Furthermore, the written order documents are verified through interviews with experts who have experience in BIM projects. Through the results of this study, I would like to propose a consultation system strategy to prepare and present items according to the purpose and type of project by client.
Journal of the Korea Institute of Building Construction
/
v.22
no.4
/
pp.347-358
/
2022
In order to satisfy the extraction and use of information such as estimates and processes required in the design and construction stages of BIM, which is an expectation of overall construction operation for the design and construction stage of domestic buildings, it is insufficient to supply and apply mobile technologies or terminals. In this paper, standardization of BIM-based processes from the design stage to the construction stage is proposed as an efficient construction system method through mobile-based simulation and test-bed case analysis review. The current status and potential of BIM application were identified through theoretical review of BIM and case studies at home and abroad. In addition, the overall flow of the project and the direction of effective process construction were investigated through each process by 3D, 4D, and 5D execution stage and the role of each collaborator. 4D building process BIM simulation system using mobile was implemented by applying a visualization engine that simulates process information, object information connection module, and related object information. Therefore, it was possible to minimize the possibility of re-construction of the BIM design and construction process model through the visualization of 2D drawings based on the 3D model of the building and the review of errors and interferences in the drawings. In addition, in the implementation of simulation for each process of the construction process through mobile devices, it was possible to support construction progress and process management according to the optimal option selected by the user.
Cho, Sun Il;Lim, Jae Hyoung;Lim, Soo Bong;Yun, Hee Cheon
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.38
no.2
/
pp.131-140
/
2020
Recently the importance of BIM (Building Information Modeling) that enables 3D location-based design and construction work is being highlighted around the world. In Korea, the road map has been established to settle the design based on BIM using drone survey results by 2025. As the first step, BIM would be applied to road construction projects worth more than 50 billion Korean Won from 2020. On the other hand, drone survey regulation has been enacted and the data for drone survey cost were also included on Standard of construction estimate in 2020. However, more careful improvement is required to reflect drone survey results in BIM design and construction. Currently, Engineering instructions and Standard of construction estimate specifies that earthwork volume must be calculated by cross section method only. So it is required to add the method of DEM (Digital Elevation Model) based volume calculation on these regulations to realize BIM application. In order for that, this study verified the method of DEM based earthwork volume calculation. To get an accurate DEM for accurate volume computation, drone survey was carried out according to the drone survey regulation and then could get an accurate DEM data which have errors less than 3cm in X, Y and 6.8cm in H. As each DEM cell has 3D coordinate component, the volume of each cell can be calculated by obtaining the height of area of the cell then total volume is calculated by multiplying total number of cells by volume of each cell for the construction area. Verification for the new calculation method compare with existing method was carried out. The difference between DEM based volume by drone survey and cross section based volume by traditional survey was less than 1.33% and it can be seen that new DEM method will be able to be applied to BIM design and construction instead of cross section method.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.