Application of BIM-based PMIS Considering Construction Life-Cycle (건설 생애주기를 고려한 BIM 기반의 PMIS 활용)

  • Moon, Sung-Woo;Kwon, Ki-Nam;Kim, Sang-Do;Jung, Joon-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.654-657
    • /
    • 2008
  • Recently, construction projects have become bigger and complicated and the construction business scale has enlarged. Therefore a project cost size is increasing. The historical data can be easily saved by advanced technologies of IT industries. Utilizing those make us to be able to manage construction project more effectively. These days, PMIS (Project Management Information System) has supplied widely at construction companies for integrating cooperation system of Web environment. and it is being used. However the most PMIS is limited at construction phase. Actually it isn't applied to a construction project Life-Cycle(planning, design, construction and maintenance). To control manage a construction project Life-Cycle effectively, BPMS (BIM-based PMIS Modeling) should be considered. This paper suggests the ways for applying BPMS.

  • PDF

Usability Improvement of BIM for Construction Projects Using Active BIM Functions (능동형 BIM 체계에 의한 토목 및 건축분야 BIM 활용성 개선 연구)

  • Kang, Leen-Seok;Moon, Hyun-Seok;Kim, Hyeon-Seung;Kwak, Joong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.74-83
    • /
    • 2013
  • Most current BIM systems are focused on the visual information of work status in the design and construction stages. In a passive BIM system, 3D CAD tool can visualize the interference elements of design drawings, however, it cannot suggest a solution to solve the interference status. And 4D CAD tool in the construction stage can simulate the appearance of each activity by construction schedule, however, it cannot suggest an optimized schedule plan considering specified schedule condition of the project. Recently, many organizations need BIM solutions that can improve the work status beyond the level of simple visual information from BIM system. Active BIM system can provide the solutions to the project manager. This study suggests active BIM functions for the solutions and attempts to develop a 4D CAD engine to validate the usability of the functions.

A Preliminary Study of the evaluating and improving WLCM for construction project based on BIM (BIM기반 프로젝트의 WLCM (Whole Life-Cycle Management) 적용모델 개발을 위한 기초연구)

  • Lee, Geun-Ho;Lim, Hyoung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.13-14
    • /
    • 2011
  • The main purpose of this research is to propose standardization of construction components design with BIM and to develop WLCM Framework and Application System for supply chain management on interaction of stakeholders based on proposed standard component. To accomplish main purpose of this research, we planned three years period, in first year, we will develop model for building lifecycle based on BIM, and this model can give the chance of collaboration with stakeholders of building project. In second year, we will develop WLCM system with model, and to improve performance of application model/system. This study can contribute on reduction of whole lifecycle cost, with preventing omission of factors on cost reduction possibility, develop concurrent engineering framework for construction stakeholders with proposed BIM.

  • PDF

Management of Design and Construction Information of Building Structures Based on IFC (IFC기반 건축물 골조설계 및 시공정보 유통)

  • Park, Chan-Ho;Kim, Chee-Kyeong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.533-536
    • /
    • 2010
  • 현재 우리나라 건설 사업에는 BIM의 관심과 사용이 급증하고 있다. BIM의 현주소는 실무에 적용하기 어려운 단점이 많고 IFC를 이용한 정보호환에 어려움이 많다. 결과적으로 Architectural BIM Tool에서 모델링한 프로젝트를 Structural BIM Tool에서 다시 모델링을 하고 MEP단계에서도 다시 한 번 더 BIM 모델링을 하는 반복 작업과 반복 작업으로 인한 인력손실과 프로그램간의 유통과 호환에 문제가 많은 것이 현 실정이다. 이에 본 연구는 타 분야와의 정보 공유를 설계단계에 따라 상세 수준별로 분류하여 설계/설비 분야와 정보를 공유하고 물리적 모델과 해석적 모델의 상이로 인하여 현 정보 교류에 많은 문제점이 있어 두 모델간의 정보변환을 위한 알고리즘을 개발하고 구현하였다.

  • PDF

A Development of 3D Computer-Aided Design(CAD) Add-on Program for a Quantity Take-off through the User Needs Analysis (사용자 요구 사항 분석에 따른 물량산출 연동 프로그램 개발)

  • Kim, Seong-Ah;Lee, Jea-Jun;Shin, Tea-Hong;Chin, Sang-Yoon;Kim, Yea-Sang;Choi, Cheol-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.297-300
    • /
    • 2008
  • Since the Three Dimensional Computer Aided Design(3D CAD) appeared in 1990s, Building Information Modeling(BIM) has got the great issue in the construction project nowadays. BIM is the process of managing and generating building information during life cycle of a construction project. And information can be moved to 3D modeling flexibly in BIM. As a result, a field of estimating has also been doing researches in the calculation of the amount of building materials from 3D modeling. And the Construction Cost Estimating Software which is generally used over the world has been trying to be applied to the Construction project in Korea. But, when we consider the productivity, it is less efficient than the existing way in Korea which use the 2D Drawings when they take off the Quantity. Also, there are lots of difference how to estimate the construction cost. between Korea and the others. Because it is a bit hard to apply the software used in the other countries to the construction project in Korea, people couldn't use it well in the construction project actually. In this study, for developing the appropriate construction cost estimating software rooted in 3D in Korea, we suggest 3D CAD Add-on Program for a Quantity Take-off which can move quantitative information to 3D CAD.

  • PDF

Application of Blockchain Technology to Verify Reliability of Life Cycle BIM Model for Civil Engineering Project (블록체인기술을 활용한 토목공사 생애주기 BIM 모델의 신뢰성 확보 방안)

  • Lee, Jaehee;Moon, Hyounseok;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.116-124
    • /
    • 2021
  • As the utilization of the BIM model increases in the design and construction stages of a construction project, the utilization of BIM in the maintenance stage can also increase. In the maintenance stage, BIM objects created in the design and construction stages that have already been completed are used. Therefore, it is necessary to verify the reliability of whether the used BIM object is a certified model created in the design stage. In particular, the reliability of the BIM model becomes more important in a project such as railway facilities composed of various construction activities with civil engineering, architecture, electricity, signal, and track work. This study proposes a methodology of using blockchain technology as a way to secure the reliability of the BIM model used in the maintenance phase, and constructs the block structure and detailed process for applying the blockchain technology to BIM. In addition, by applying this process to the BIM model of an actual facility to generate a block, it was confirmed that the blockchain technology can be used as a tool to secure the reliability of the BIM model.

Implementation of Quantity Estimation Database based on Efficiency Analysis of Quantity Information about BIM(Building Information Modeling) of Reinforced Concrete Structure through the Case Study (사례연구를 통한 RC구조 BIM에서의 물량정보 효율성 분석기반 물량산출 데이터베이스 구축)

  • Cho, Young-Sang;Bae, Jun-Seo;Kim, Yu-Ri
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.513-516
    • /
    • 2009
  • 본 논문에서는 사례연구를 통하여 RC구조 BIM에서의 물량정보 획득의 효율성을 분석하고 이를 기반으로 BIM 프로세스 환경에서의 철근 및 콘크리트 물량산출을 위한 데이터베이스를 구축하여 현장 시공단계에서의 공정 및 물량관리의 협업단계를 가능하도록 하는 철근 Sorting 시스템에 대한 연구를 목적으로 한다. 기존의 건설, 건축분야에서의 정보는 기호적 언어와 2차원 기반의 도면 정보체계를 통해 표현되었지만, BIM 기술을 통해 건물의 실제 형상과 정보를 가지는 3차원 기반의 정보체계로의 변화와 함께 컴퓨터 데이터베이스 내에서 프로젝트에 포함된 모든 정보를 저장하고, 다양한 형태로 필요에 따라 정보를 표현할 수 있게 변화하고 있다. 견적 및 시공을 위한 RC구조설계단계에서의 배근 모델은 협업을 위한 객체 정보의 획득 및 추출이 중요하지만 현재 상용되고 있는 BIM도구에서는 현재까지 미흡한 체계를 이루고 있다. 본 논문에서는 구조설계를 기반으로 배근된 BIM 구조모델 사례를 통하여 기존 BIM도구에서의 물량 정보획득 효율성 분석을 기반으로 객체들의 데이터베이스 구축을 통한 철근 Sorting 시스템 구축 연구를 통하여 협업단계에서의 체계적 물량정보 관리를 가능하도록 하였다.

  • PDF

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

BIM based Construction Project Case Analysis for Facility Life Cycle Management from the Perspective of the Client (발주처 관점의 시설물 생애주기 관리를 위한 BIM 기반 건설 프로젝트 사례 분석)

  • Ham, Nam-Hyuk;Kim, Woong-Gi;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.10 no.3
    • /
    • pp.12-21
    • /
    • 2020
  • From the perspective of the client, the value of information for use in facility management is very low at the point of use. This is because the facility owner, who is a non-professional, cannot accurately request necessary information from the perspective of long-term facility life cycle management. The purpose of this study is to define the information necessary for facility management and to analyze the project operation method to procur this information to the client using BIM. To this end, this study analyzed the role of client and contractor, project delivery process, standards, and submissions in the BIM-based procurement area through USACE Air Force Hospital project case analysis. As a result of the analysis, if the client, who is the subject of facility operation, defines in advance the type and input method of necessary information in the operation stage, the client can receive the BIM optimized for operation from the contractor. The results of this study can be used to establish standards for receiving information necessary for establishment of procurement process and facility management of public institutions considering BIM introduction.