• Title/Summary/Keyword: BIM모델

Search Result 407, Processing Time 0.031 seconds

The study related to the meta data for the attribute mapping from IFC to CityGML (IFC에서 CityGML로 속성 맵핑을 위한 메타 데이터에 관한 연구)

  • Kang, Tae Wook;Choi, Hyun Sang;Hwang, Jung Rae;Hong, Chang Hee
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.30 no.6_1
    • /
    • pp.559-565
    • /
    • 2012
  • The purpose of the present study is to suggest the meta data of the attribute mapping for interoperability from IFC to CityGML. For this, we analyzed the interoperability issue including the neutral information model structure such as IFC, CityGML. To solve the interoperability problem between IFC and CityGML model which is the neutral GIS format, We proposed the meta data including the mapping rule. The meta data is consists of the connection information between BIM and GIS model, the mapping rule based on the perspective of the use-case, the operator and the attribute. By using this, XML to represent the meta data is defined and the information mapping system is developed.

Development Method of BIM Data Modeling Guide for Facility Management : Focusing on Building Mechanical System (시설물 유지관리를 위한 BIM 데이터 입력기준 개발방안 : 건축 기계설비를 중심으로)

  • Won, Ji-Sun;Cho, Geun-Ha;Ju, Ki-Beom
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.25 no.4
    • /
    • pp.216-224
    • /
    • 2013
  • Facility data is created throughout the design and construction phase. But the most facility managers bear significant costs that arise from the lack of interoperability with facility lifecycle. This paper is concerned with the way to collect facility data using BIM technology. The aim of this paper is to suggest BIM data modeling guide for the facility management using the information that need to be delivered from design and construction phase to operation and management phase. The BIM data modeling guide focus on the properties of mechanical equipment. It is to be hoped that this study will contribute to collect facility data from as-built BIM data and to build facility management system database without difficulty.

BIM Application in Design Phase for Civil Engineering Project (토목공사의 설계단계 BIM적용에 대한 연구)

  • Kang, Leen-Seok;Kim, Seol-Gi;Moon, Jin-Seok;Ann, Jae-Gyu
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.666-669
    • /
    • 2008
  • Recently, the application of building information model (BIM) is evaluated as one of important issues in construction market through the analyzed results in successful case studies. This study suggests an integrated information management model based on BIM through the problem analysis in existing information model for design phase. The application of suggested model is verified by a case study of bridge project. Those automatic and integrated information models for design phase can be used for an effective information management model through project life cycle.

  • PDF

BIM Model Quality Improvement by Case Study Analysis (품질검증 사례 분석을 통한 BIM모델 품질개선 방안)

  • Kwon, O-Cheol;Cho, Joo-Won;Jo, Chan-Won
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.3
    • /
    • pp.164-174
    • /
    • 2012
  • The recent introduction of BIM technology has raised the interest on the BIM quality assurance and management more than ever. This study aims to consider the ways of BIM quality improvement by analyzing the most frequent issues rising from multiple BIM projects. For this purpose, the 12 test models from BIM education program hosted by buildingSMART Korea are investigated based on the requirements in the public BIM guidelines. All the BIM issues generated are categorized by the criteria applied and analyzed for each kind of building element. The results showed that more than half of the issued at least could be cleared out by improving modeling habits and technical guides.

Development of BIM models and management of BIM data for waterworks maintenance (상수도시설물의 유지관리를 위한 BIM모델 개발 및 BIM 데이터 관리방안)

  • Park, Jaehyun;Lee, Hyundong;Kwak, Pilljae
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.28 no.6
    • /
    • pp.669-679
    • /
    • 2014
  • 3D-based BIM(Building Information Modeling) technologies can be utilized effectively as a means of systematic management of facility information for safety assurance and effective maintenance of waterworks facilities. In this study, BIM models of water treatment facilities that can be used as basic data for BIM-based maintenance of waterworks facilities were developed. Information exchange and generality of the developed BIM models were evaluated by conducting interoperability analysis of IFC(Industry Foundation Classes) conversion models. In addition, the application of COBie(Construction Operations Building information exchange) was recommended as an effective countermeasure to deal with technical limitation regarding exchange and utilization of facilities-related information through current IFC models. The results of this study can contribute to the development of BIM-based maintenance system for waterworks facilities.

A Basic Study on the Extension of Design Information to Improve Interoperability in BIM-based Collaborative Design Process (BIM 기반 협업에서의 상호운용성 향상을 위한 설계정보의 확장방안에 대한 기초적 연구)

  • Jung, Jae-Hwan;Kim, Jim-Man;Kim, Sung-Ah
    • Journal of KIBIM
    • /
    • v.5 no.1
    • /
    • pp.25-34
    • /
    • 2015
  • In the initial step of BIM based architectural design process, workloads are increased and the decision making process becomes more complex than those of the conventional design process. Technologies regarding distribution, exchange, classification, verification of BIM data are fundamental elements of construct environment for information sharing based on BIM. Interoperability of BIM model data is another issue to integrate BIM model. To improve interoperability in BIM-based collaboration, a model for utilizing formal&unformal design informations is suggested. Futhermore, Prototyping the model and practical test is conducted for advancement of data exchange making design data richen.

Automated Digital Engineering Modeling of Prefabricated Bridges with Parameterized Straight Alignments (직선교량에 대한 디지털엔지니어링 모델의 선형연동 프로그램 개발)

  • Choi, Jae-Woong;Kang, Jeon-Yong;Kim, Hyun-Min
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.40-49
    • /
    • 2020
  • This report describes the development of a program that can be linked to an alignment and extracts related information using a prefab structured digital engineering model. The subject bridge was set as a straight alignment, the Superstructure type as Precast girder and the Substructure type as Precast pier and Cast-in-situ Abutment. We identified the variables required to create a digital engineering model and reviewed them to create the digital engineering model by entering them as numerical values in the program. In addition, it is configured so that the variables linked to the alignment can be entered numerically. The quantity takeoff can be calculated when the design is complete. The purpose of the program development presented in this report is to enable the designers to select the optimal alternative by designing a bridge that best fits their current situation, extracting the relevant information and then by providing it to the manufacturer and construction company.

Definition of requirements for creating BIM models for the development of SCAN to BIM guidelines (SCAN to BIM 지침 개발을 위한 BIM 기반 조달프로세스와 모델의 요구사항)

  • Kim, Do-Young
    • Journal of KIBIM
    • /
    • v.11 no.1
    • /
    • pp.11-20
    • /
    • 2021
  • In the domestic construction field, BIM and 3D scanning technology are combined to perform reverse engineering. It is necessary to develop guidelines or processes for domestic situations through 3D scenario investigation and reverse engineering projects using BIM. Using the case of actual construction service that performed reverse engineering, we analyze the areas that need to be reinforced compared to the existing advanced cases when creating guidelines. It is recommended to encourage the convergence between 3D scanning and BIM, and to define the requirements and levels of the BIM model in the procedure.

BIM Model Generation at Building Level using Automated Scan-to-BIM Process - Focused on Demonstration of BIM Modeling for Gangwon Fire Service Academy - (Scan-to-BIM 자동화 기술을 활용한 건축물 단위의 BIM 모델 생성 - 강원소방학교 BIM 모델링 실증을 중심으로 -)

  • Park, Jun-Woo;Kim, Jae-Hong;Kim, So-Hyun;Lee, Ji-Min;Choi, Chang-Soon;Jeong, Kwang-Bok;Lee, Jae-Wook
    • Journal of KIBIM
    • /
    • v.11 no.4
    • /
    • pp.53-62
    • /
    • 2021
  • The successful implementation of Scan-to-BIM automation depends on the entire process from scanning of buildings, including indoor facilities and furniture, to generating BIM models. However, the conventional Scan-to-BIM process requires a lot of time, manpower, and cost for the manual generation of BIM models including indoor objects. To solve this problem, this study applied a Scan-to-BIM automation process using a deep learning model and parametric algorithm to an existing building, Kangwon Fire Service Academy. To improve the accuracy of the BIM model, after object data was extracted from the scan data, the data was corrected according to actual object-specific conditions. As a result, the accuracy of the BIM model created by the proposed Scan-to-BIM automation process was 91% compared to the actual area of the construction drawings. In addition, it was confirmed that the BIM objects were automatically generated for 10 object classes.

A Study on the Using of BIM Data and Template for Construction Progress Management (건설공정관리를 위한 BIM데이터와 템플릿 활용 방안)

  • Oh, Kun-Soo;Park, So-Hyun;Song, Jung-Woo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.8
    • /
    • pp.157-163
    • /
    • 2016
  • BIM is currently applied in some domestic construction firms, but it is not being actively utilized due to changes in working environments and qualms about new studies. In order to utilize a BIM model in the design phase, process information is needed during construction, but the input system and utilization method of the process information's state are not complete. Therefore, we propose a BIM template for construction progress management that can show basic BIM information as the construction progresses in an easy and convenient way. This method will facilitate the adoption of BIM and enhance the productivity of construction companies. To this end, we designed a progress explorer for step-by-step progress and work schedules, and we generated three-dimensional views and a progress list by applying unit information (primary units, part units, and detail units) of the work breakdown structure (WBS) to the parameters. To use the BIM template, work progress information is input to the BIM modeling objects through Dynamo. We also used Dynamo for quick and easy calculation of the quantity of materials needed for construction work. To test the BIM template, we applied it to an actual project and evaluated its visibility and a progress list. The results showed that the proposed BIM template facilitates progress management of a project and can thus facilitate the adoption of BIM and improve the productivity of construction companies.