• Title/Summary/Keyword: BIM기반 공정관리

Search Result 29, Processing Time 0.204 seconds

A Framework Integrating Cost and Schedule based on BIM using IFC (IFC활용 BIM기반 공정/원가 통합관리 프레임워크)

  • Lee, Jin-Gang;Lee, Hyun-Soo;Park, Moonseo;Jung, Minhyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.53-64
    • /
    • 2013
  • In building construction project, there are numerous information or data parts across many different software applications and professional specialists. BIM (Building Information Modeling), as a medium for managing information generated during construction project, it is intended to enhance the effectiveness of construction management and reap a lot of advantages such as, automatic quantity takeoff, error-free estimation, 4D(3D+Time), 5D(4D+Cost) simulation. Nevertheless, the overall and practical effectiveness of BIM utilization is difficult to justify at this stage. While helpful, there are some limitation when BIM applied to construction management due to the differences of data processing process between BIM and work in the field, limitations of information generated from BIM object and interoperability problem among BIM application. Therefore, this paper propose a framework integrating BIM with cost-schedule information using IFC. And we construct the system prototype based on the framework and performed case study to examine the framework. The proposed framework provides the information basis for BIM based cost-schedule integration. ultimately, the framework increase the utilization of BIM and work efficiency of construction industry by supporting an understanding of information.

A Study on the Development of Construction Progress Management system based on BIM (BIM 기반의 건설공사 진척관리 시스템 개발을 위한 기초연구)

  • Shin, Yoon-Kyung;Kim, Sun-Hyo;Park, Sung-Han;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.525-528
    • /
    • 2010
  • 본 논문은 BIM기반 건설공사 진척관리 시스템의 개발 방향을 제안하는 것이다. 이를 위해 일차적으로 기존 4D 진척관리프로그램인 Synchro 4D와 Navisworks를 분석을 하여 문제점을 도출했다. 이를 극복하고자 국내실정에 맞는 방안 및 공정과 3D객체 연계의 효과적 방안을 제안하였고 예상공정과 실제공정의 시각적 비교 기능 및 통합건설정보관리 기능 추가를 제시하여 이 프로그램의 본 목적인 효율성 증진을 위해 향상된 진척관리 방식을 제안하고자 하였다.

  • PDF

Construction Process Analysis of Han-Ok for BIM Based Modern Han-Ok Construction Simulation (BIM 기반의 현대식 한옥 시공시뮬레이션 구현을 위한 한옥 공정분석 연구)

  • Yun, Seok-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.3-10
    • /
    • 2011
  • Currently, technologies for industrialization and dissemination for Han-Ok are developed actively. Also BIM technologies are actively developed. However, it is difficult to find the research and study cases for construction method and process for Han-Ok. BIM is the technology for managing information with element as a unit for building design, construction and management, and it is closely related to Han-Ok using assembling method for building construction. We analyzed the basic construction processes for IK-Gong and MinDoRi house, typical types of Han-Ok. Also we developed the Work Breakdown Structure of construction process for Han-Ok and suggested the method for construction simulation using BIM. Simple BIM model of Han-Ok which is Ik-Gong type is used for case study. It was possible to link automatically between 3D elements objects and construction activities about 95% in the case study. More studies of construction method for various type of Han-Ok and rules for link between elements and construction activities are required for Industrialization and dissemination of Han-Ok.

A Study on the Improvement through Analysis with Present Condition of Progress Management for Construction Project (공사 진척관리 현황분석을 통한 진척관리 개선방안에 관한 연구)

  • Park, Won-Ho;Sim, Jae-Kwang;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.3
    • /
    • pp.137-144
    • /
    • 2010
  • As mega-sized and complex building construction projects are on the rise, the importance of project scheduling and control is being highlighted. Project scheduling and control techniques are not yet widely used in Korea, but interest in these has progressively been increasing. Until now, most research projects have mainly focused on scheduling issues, but project progress management is of equal importance. In this research, the current state of project progress management in Korea is analyzed, and ways for improvement are suggested. We begin by analyzing previous research and practical studies in this field, and then survey experts about the current state of project progress management. This study suggests the Building Information Modeling (BIM)base project progress management method for quantitative and qualitative project progress analysis. Currently, BIM is applied to design, construction and maintenance for construction projects. BIM can also contribute to improving accuracy and understanding of the current project situation.

A Study on the Construction Management Method based on BIM for Civil Engineering Project (토목시설물에 대한 BIM기반 공사관리 기법 연구)

  • Kim, Sung-Hoon;Lee, Sang-Ho;Nam, Sang-Hyeok;Sun, Oh-Young
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.24 no.4
    • /
    • pp.463-469
    • /
    • 2011
  • BIM(Building Information Modeling) technologies should be applied for the construction life cycle to maximize its efficiency, but the utilization for the construction phase has been significantly lower than that for the planning and design phase. Recently, some of BIM techniques such as 3D design review, 4D schedule management and so on are being introduced for efficient managing to the big national construction projects. In this study, the utilization plans of BIM are presented for the construction phase of civil engineering facilities. The methods of utilization of BIM are discussed for each type of construction, and the techniques applied to the Seoul Subway Lot No. 919 are analyzed for checking the applicability and usability. In particular, a web construction management system based on BIM can help field engineers, headquarters and contractors to use BIM more effectively, and it can be extended to maintenance phase for more efficiencies.

A Study on the Development of a Construction Field Management Model based on BIM (BIM기반 건설현장 관리모델 개발에 관한 연구)

  • Jun, Young-Woong;Lee, Myoung-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.127-135
    • /
    • 2010
  • As the amount of construction information used in the growing construction field increases, the importance of efficient construction field management has been growing. Accordingly, this study aims to identifythe application situation and possibility of BIM through theoretical examinations and domestic & overseas case studies of BIM, and attempts to suggest an approach to the formulation of an efficient construction field management model through the implementation of phase-oriented and cooperation entity-oriented analysis in the construction field. In the future, the conclusions of this study should be used to formulate an actual construction field management model and apply it in the field.

A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle

  • Lee, Jae-Hong;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.12
    • /
    • pp.1-15
    • /
    • 2020
  • In this paper, we propose a novel method for converting the existing 2D processes in the design and construction phase of civil engineering, to the future BIM-based processes. First, we compare and analyze the actual application processes of the outputs of the existing 2D method and the outputs of the 3D BIM method, for the whole process of BIM design of earthworks and road structures and integrated utilization of quantity, process(4D) and construction cost(5D), in view of life-cycle. The proposed method acquire the outputs of the design phase integrating IFC international common standard file information and CBS/OBS/WBS standard classification scheme information, and acquire the outputs of the construction stage by using an integrated utilization module for quantity, process(4D) and construction cost(5D). Ultimately, we intend to commercialize the step by step technologies for BIM design and construction in civil engineering by using the proposed method.

Implementation of Quantity Estimation Database based on Efficiency Analysis of Quantity Information about BIM(Building Information Modeling) of Reinforced Concrete Structure through the Case Study (사례연구를 통한 RC구조 BIM에서의 물량정보 효율성 분석기반 물량산출 데이터베이스 구축)

  • Cho, Young-Sang;Bae, Jun-Seo;Kim, Yu-Ri
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.513-516
    • /
    • 2009
  • 본 논문에서는 사례연구를 통하여 RC구조 BIM에서의 물량정보 획득의 효율성을 분석하고 이를 기반으로 BIM 프로세스 환경에서의 철근 및 콘크리트 물량산출을 위한 데이터베이스를 구축하여 현장 시공단계에서의 공정 및 물량관리의 협업단계를 가능하도록 하는 철근 Sorting 시스템에 대한 연구를 목적으로 한다. 기존의 건설, 건축분야에서의 정보는 기호적 언어와 2차원 기반의 도면 정보체계를 통해 표현되었지만, BIM 기술을 통해 건물의 실제 형상과 정보를 가지는 3차원 기반의 정보체계로의 변화와 함께 컴퓨터 데이터베이스 내에서 프로젝트에 포함된 모든 정보를 저장하고, 다양한 형태로 필요에 따라 정보를 표현할 수 있게 변화하고 있다. 견적 및 시공을 위한 RC구조설계단계에서의 배근 모델은 협업을 위한 객체 정보의 획득 및 추출이 중요하지만 현재 상용되고 있는 BIM도구에서는 현재까지 미흡한 체계를 이루고 있다. 본 논문에서는 구조설계를 기반으로 배근된 BIM 구조모델 사례를 통하여 기존 BIM도구에서의 물량 정보획득 효율성 분석을 기반으로 객체들의 데이터베이스 구축을 통한 철근 Sorting 시스템 구축 연구를 통하여 협업단계에서의 체계적 물량정보 관리를 가능하도록 하였다.

  • PDF

The Simulation Function Analysis for BIM based construction planning (BIM기반 시공계획의 시뮬레이션 기능 분석 연구)

  • Jun, Ki-Hyun;Kim, Chang-Seob;Yun, Seok-Heon
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.95-98
    • /
    • 2011
  • 건설공사 프로젝트는 사전 기획 단계, 설계, 계약, 시공, 운영 및 유지관리 등 각 단계의 다양한 참여 주체에 의해 프로젝트가 진행되고 각 분야 간의 원활한 의사소통을 통한 협력 작업으로 일을 진행한다. 그러나 각 단계별 참여주체간의 협업이 어렵고 정보교류가 원활하지 못한 문제점들이 있다. 또한 건설공정은 현장여건의 변화와 불확실성으로 인해 예측이 어렵고, 보다 신뢰성이 있는 계획의 부재로 인하여 각종 세부 공정들 간의 간섭을 유발하고 계획된 일정을 준수하기 어려워 불필요한 비용의 낭비와 공사기간의 증가를 야기한다. 이러한 낭비요인을 최소화하고 건축 프로젝트를 진행하는데 있어서 효율성을 높이기 위해서는 시공계획 단계의 신뢰성을 높여야 한다. 따라서 시공전의 계획 단계에서부터 4D 시뮬레이션을 통하여 이러한 문제점들을 파악하고 개선하는 것이 중요하다. 본 연구에서는 BIM기반의 시뮬레이션 프로그램의 기능분석을 통하여 효율적인 적용과 발전과정을 알아보고자 한다.

  • PDF