• Title/Summary/Keyword: BIM(Building Information Modeling) Project

Search Result 292, Processing Time 0.032 seconds

3D BIM Modeling of Temporary Structure for Earthwork using Parametric Technique (파라메트릭 기술을 이용한 토공용 임시 구조물의 3D BIM 모델링)

  • Tanoli, Waqas Arshad;Raza, Hassnain;Lee, Seung-Soo;Park, Sang-Il;Seo, Jong-won
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.1-9
    • /
    • 2018
  • Nowadays Building Information Modeling (BIM) is a significant source of sharing project information in the construction industry. This method of sharing the information enhances the project understanding among stakeholders. Modeling of information using BIM is becoming an essential part of many construction projects around the globe. Despite rapid adoption of BIM in construction industry still, some sectors of the industry like earthwork have not yet reaped its full benefits. BIM has brought a paradigm shift through identification and integration of the roles and responsibilities of project participants on a single platform. BIM is a 3D model-based process which provides the insight into the efficient project planning and design. The 3D modeling can also be used significantly for the design of temporary structures in an earthwork project. This paper presents the quantity take-off methodology and parametric modeling technique for creating the temporary structures using 3D BIM process. A case study is conducted to implement the proposed temporary structure family design on a real site project. The study presented is beneficial for the earthwork project stakeholders to extract the relevant information using 3D BIM models in a project. It provides an opportunity to calculate the quantity of material required for a project accurately.

Comparison Analysis of BIM Level in the Domestic and Overseas BIM Projects - Focused on BIM Journals and Award Winning Projects - (국내·외 BIM 적용 프로젝트의 BIM 적용수준 비교분석 - BIM 저널 및 Awards 수상작 사례를 중심으로 -)

  • Koh, Sung-Hoon;Ham, Nam-Hyuk;Lee, Joo-Sung;Yoon, Su-Won;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.7 no.2
    • /
    • pp.25-35
    • /
    • 2017
  • Building information modeling (BIM) can improve to communicate with project participants by early construction involvement (ECI) from the beginning of the project. Therefore, they can minimize design changes and improve design quality and construction. However, because there is insufficient research on the scope and application level of BIM according to project delivery system and project characteristics, construction companies have efficiently not been using the BIM. Therefore, this study intends to conduct basic research as a basis for confirming appropriate BIM application and level according to project delivery system and project characteristics. To do this, we investigated the project delivery system and project characteristics of domestic and foreign projects that have successfully applied BIM, and compare and analyze them based on BIM application and BIM level framework derived from theory reviews and experts. Therefore, this study can be used as a basis for strategically establishing the scope and level of BIM according to project delivery system and project characteristics through the result of this study.

Key Technologies for Building Information Modeling (BIM) (건축물 수명주기 관리를 위한 핵심기술들)

  • Lee, Ghang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.145-149
    • /
    • 2006
  • Building Information Modeling (BIM) is the process of integrating and re-using information generated and used throughout the lifecycle of a building. BIM may not be very different from other management methods in that it aims to minimize the economic loss and maximize the profit by designing, building, and maintaining a building better, faster, yet cheaper. The major difference between BIM and other methods is that BIM approaches the goal from a system point of view whereas other methods generally approaches the goal from a business management point of view. Since a project cannot succeed without considering both systematic and managerial aspects of a project, the line has been blurred these days. This paper explores a historical background of BIM and discusses the key technologies for successful implementation of BIM.

  • PDF

Derivation of BIM Project Properties Through an Analysis of On-Line BIM Project Cases (온라인 BIM(Building Information Modeling) 사례 분석을 통한 BIM 프로젝트 속성정보 도출)

  • Lee, Kyungha;Uhm, Miyoung;Lee, Hwayeon;Lee, Ghang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.194-195
    • /
    • 2015
  • When starting a new project, generally similar existing projet are searched. As Building Modeling Information(BIM) has short history and experience, the dependence on similar project is high. Small and medium sized design companies are depending on website search tool for information of BIM project besides companies maintaining the Database(DB) from lots of project experience. However, the information level and contents provided by websites differ drastically from each other which makes it difficult to utilize the information and apply cases. Furthermore, the different classification system of the sites makes the situation even worse. Therefore, we collected and analyzed over 100 BIM cases from 18 global websites, to develop a system for BIM case application. Result showed that over 90% of our subject pool provided basic information including the construction type, characteristics of the client (public/ private), location of the project, and detailed information such as primary usage. Moreover, the reasons for applying BIM where to solve problems of geometric design, building system like MEP and construction. Furthermore, there was a contrast between cases conducted only within Korea and cases conducted with other countries. While there was almost always helpful information regarding the administrative steps for Korean BIM cases, there was close to no information for projects carried out outside of Korea. These results could contribute to verifying the trend of information provision of the websites for BIM projects data, and this is believed to be helpful for developing an application system for BIM cases which have an organized information provision system and level as well as for bench marking.

  • PDF

A Study on The Possibility of BIM(Building Information Modeling) Application of Construction Management (건설사업관리의 BIM(Building Information Modeling) 적용 가능성에 관한 연구)

  • Shim, Jin-Kyu;Yi, Hye-In;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.2
    • /
    • pp.49-60
    • /
    • 2010
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But the each role of participants is individually changed to step in construction process stage and moreover it has complicated, entangled interests. The Construction Management was inducted for the effective management and operation of construction project. The Key of the Construction Management success depends on the cooperative relationship relation to major participants. The domestic construction system is difficult with many trial and errors for the frequent plan change. As the building are more bigger and complicated, Building Information Modeling is demanded design and maintenance. This evaluation was done by the trust on the system as well as Construction Management. And then it applies the BIM it analyzes the example of construcrion project.

The Application of using BIM(Building Information Modeling) for a Mega-Complex Building Construction - Focused on using for L-Project - (초고층 대형복합 건축공사에 있어 BIM 활용에 관한 고찰 - 해운대 L-Project 적용 성과를 중심으로 -)

  • Park, Hee-Do
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.42-43
    • /
    • 2020
  • Recently as construction projects have been complicated, it has been wearing thin to draw on their personal experiences for management. Although the advance of IT, using the technology for construction is insufficient in contrast to other industries. BIM has been steadily used in construction projects, but it is not easy to find the case of successful use. This research considers ways in which BIM technology can be applied to useful management on a construction site and derives a method of application of using BIM for a Mega-complex Building Project especially.

  • PDF

Apartment house project cost schedule for integrated management BIM-based BoQ application plan (공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안)

  • Zheng, Lianyi;Kim, Woong-Gi;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.11 no.2
    • /
    • pp.1-16
    • /
    • 2021
  • Since entering the 21st century, the construction industry has developed faster and faster, and more and more technologies have been applied in the construction industry. BIM technology (Building Information Modeling) was born in this environment. The application of BIM technology can greatly improve the efficiency of cost management and help achieve the goal of cost management. But through BIM to realize project cost management, there is still no good solution. In order to solve this problem, this paper puts forward the concept of WBS structure applied to construction projects by studying the BoQ (Bill of Quantities) list based on BIM, and proposes the numbering method of the structure. The WBS (Work Breakdown Structure) structure proposed in this paper divides more than 5000 cost objects into 133 projects according to the type of work and project schedule. This structure helps to realize the application of BIM in project cost management. Although this article has studied more than 5000 data of three projects, it does not think that it can cover all cost objects in the existing construction industry. The purpose of this article is to propose a solution for cost and Process Control using BIM-based BoQ data.

A Study about BIM Execution Plan for Specialty Contractors at Construction Phase - focused on Specialty Contractors in Reinforced Concrete Works - (시공단계에 참여하는 전문건설업체를 위한 시공 BIM 수행계획 구축 - 철근콘크리트 업체를 중심으로 -)

  • Lee, Joo-Sung;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.5 no.3
    • /
    • pp.19-32
    • /
    • 2015
  • For decades, the productivity issue has been a primary concern for the all stake-holders who participate in domestic construction industry. Especially, between a whole life cycle of building, the construction phase's productivity problem makes or break the entire project. In this respect, the general construction company, who accept the order and construct the building(so called General Contractor), should consider various strategies, such as schedule management, cost management, quality management, inner-crew management, etc., for the productivity improvement., and almost of these management methods have been studied for a long time. But, the researches and studies about the specialty contractor, who construct the building directly in construction site were not sufficiently complete yet. This research begins as an idea which tries to apply the BIM(Building Information Modeling) into the tasks of Specialty contractors for their productivity improvement. And for the effective application of construction BIM to specialty contractors, establish of the BIM project execution plan for them, not the fragmentary adoption of BIM. Therefore, in this paper, we develop the BIM project execution plan for the reinforced concrete companies who conduct the framework construction which located on CP(Critical Path) Especially, we model the "Construction BIM Use List for the RC Work", "BIM Application Master Process" and "BIM Application Detailed Process", and general contractor who use these BIM uses list and process models can manage various specialty contractors about schedule, cost, earned value, quality, safety and environment management systematically.

Cost Management System for Mechanical, Electrical, and Plumbing(MEP) Coordination Using Building Information Modeling(BIM) - A Case Study (BIM 기반 MEP 설계 조율 프로세스 분석을 통한 비용 관리 시스템 개발 사례 연구)

  • Won, Jongsung;Ham, Sungil;Jang, Sejun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.2
    • /
    • pp.195-205
    • /
    • 2022
  • This paper aims to propose a cost-based mechanical, electrical, and plumbing(MEP) coordination process using building information modeling(BIM). The proposed process can help project participants eliminate identified clashes between the MEP elements, analyze trends relating to MEP costs during the coordination process, and share their findings. MEP quantity-related information extracted through BIM was integrated with the cost database and schedule information. To check the applicability of the proposed process, it was applied to a construction project in South Korea. Through the application of the proposed process, MEP-related cost was reduced.

A STUDY ON BIM-BASED 5D SIMULATION IN WEB ENVIRONMENT

  • Jae-Bok Lim;Jae-Hong Ahn;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.169-172
    • /
    • 2013
  • Building Information Modeling (BIM) is an effective decision-making platform that helps to save project cost and enhance quality of construction. By generating and linking a wide variety of objects data, BIM can be effectively utilized, and it should be ensured that object properties maintain consistency throughout the project period of design, estimates, construction, maintenance and repair. This study examined how to utilize BIM data in a construction project, by linking cost and schedule data in web environment, to better utilize the information and maintain consistency of the BIM information. To do so, the model integrated WBS data and CBS data, linked them with BIM model to realize 5D simulation in web environment. As a result, cost and schedule data could be simultaneously acquired, and object properties-cost, schedule, location-as well. These are expected to contribute to developing a BIM-based automatic data-processing system in web environment.

  • PDF