• Title/Summary/Keyword: Automation in Construction

Search Result 556, Processing Time 0.026 seconds

Preliminary Study on Elemental Factors and Performance Requirements for Robotic Layout System (먹매김 시공 자동화 로봇 요소기술 및 요구성능 도출 기초 연구)

  • Kim, Chowon;Park, Gyu Seon;Ji, Hyunsuh;Kim, Taehoon;Lim, Hyunsu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.257-258
    • /
    • 2021
  • Construction robotics is rapidly forming a market in conjunction with the development of sensing and artificial intelligence technologies. The layout work for accurately constructing the shape and dimensions of the building frame requires high accuracy and precision, and is one of the high demands for productivity and quality improvement through construction automation. Thus, as a preliminary study, we derived the elemental factors and performance requirements for developing an automated layout robot. In addition, alternatives on driving and marking units were investigated based on literature review and practioner's interview. The result of this study will be used as a basic data for the layout robot design.

  • PDF

Toward the Future of Mechanized Construction Introduction and Future Prospects of Mechanized Constructions Using Digital Information

  • Makoto Kayashima;Yuusuke Noguchi
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.2
    • /
    • pp.87-102
    • /
    • 2022
  • In Japan, the population progresses to the extreme aging society and it is entering the phase of the population decrease while the population increase is continuing in the world. The construction market is expected to shrink accordingly, however the situation of labor shortage is expected to continue at a faster rate, because the aging of construction workers is progressing and new younger labor force cannot be secured. In order to supplement the labor shortage, it is required to progress mechanization, automation, labor saving, and efficiency improvement by utilizing the information well in each stage in a series of flow of planning, design, construction, operation, and disassembly in one building. The measures to maintain and expand the construction market by the new efficiency improvement techniques which enhance the utilization degree of building information are required. Currently, the elemental technologies which utilized BIM (Building Information Modeling) are accumulated by advancing digitization in each phase. DX (Digital transformation) in the construction industry can be achieved by the technology maturing and having a series of continuities. It is anticipated that this will evolve to a new method which is unprecedented. Present status of BIM and mechanized constructions in Taisei Construction are introduced, and future prospect is described.

Enhancement of BIM Modeling Automation Algorithm for Linear-Based Tunnel Infrastructure and Development of BIM Modeling Automation System (선형기반 터널 인프라 구조물의 BIM 모델링 자동화 알고리즘 개선 및 BIM 모델링 자동화 시스템 개발)

  • Kim, Yun-Ok;Kim, Ji-Young; Kim, Tae-Min;Moon, So-Yeong
    • Journal of KIBIM
    • /
    • v.13 no.3
    • /
    • pp.1-11
    • /
    • 2023
  • In order to use BIM as a tool for improving the productivity and quality of products in the construction industry, a BIM model must be created from the design stage first. Infrastructure structures such as bridges and tunnels are mainly created based on three-dimensional alignment in the generation of BIM models. Especially, generation of BIM models based on three-dimensional linearity has high task difficulty and algorithms for automating BIM modeling for railway infra structures have been suggested in previous studies. This study improved the BIM modeling automation algorithm of railway infrastructures and developed a system based on the algorithm so that it can be easily used by ordinary users. The system was built as an add-in system of Autodesk's Revit. As an improvement first, it is possible to arrange different libraries for each pattern, enabling various uses. In addition, it can be created models of several members with a single process and the system can automatically places structures that are added periodically, such as Rock Bolt and Fore Polling. Finally, 3D length information and volume for each pattern are automatically calculated for more accurate 3D-based volume calculation. This study contributes to increasing user accessibility by building a BIM modeling automation algorithm into a system. The system is expected to improve the efficiency of BIM modeling creation of linear-based infra structures, including railway infrastructure.

A Study of the Using Application Program Interface (API) for Improving Productivity in Construction Engineering (건설 엔지니어링 생산성 향상을 위한 Application Program Interface(API) 활용방안에 대한 연구)

  • Park, Gi-Back;Jung, Young-Ho;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.3 no.3
    • /
    • pp.29-38
    • /
    • 2013
  • Domestic construction industry is larger in size, and its shape is more complex. As a result, collaboration and information management tasks are difficult to manage in a way that conventional 2D-based exchange of information. BIM technology was introduced as a solution for this. But BIM only provides a very limited set of features such as Constructability review, clash detection in reality. and duplication of work and a lot of iterations occurs in BIM process. Thus, it takes quite a lot time to work. We studied how to improve the work efficiency by connecting API to business processes. Using the API in the integration process by automating repetitive tasks, reduce a significant amount of work time Using API (Automation, Optimization, Interoperability, Analysis) can solve the task problem that does not solved by the basic features, If we make good use of the combined API will be improved productivity.

Development of an Automated Layout Robot for Building Structures (건축물 골조공사 먹매김 시공자동화 로봇 프로토타입 개발)

  • Park, Gyuseon;Kim, Taehoon;Lim, Hyunsu;Oh, Jhonghyun;Cho, Kyuman
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.6
    • /
    • pp.689-700
    • /
    • 2022
  • Layout work for building structures requires high precision to construct structural elements in the correct location. However, the accuracy and precision of the layout position are affected by the worker's skill, and productivity can be reduced when there is information loss and error. To solve this problem, it is necessary to automate the overall layout operation and introduce information technology, and layout process automation using construction robots can be an effective means of doing this. This study develops a prototype of an automated layout robot for building structures and evaluates its basic performance. The developed robot is largely composed of driving, marking, sensing, and control units, and is designed to enable various driving methods, and movement and rotation of the marking unit in consideration of the environment on structural work. The driving and marking performance experiments showed satisfactory performance in terms of driving distance error and marking quality, while the need for improvement in terms of some driving methods and marking precision was confirmed. Based on the results of this study, we intend to continuously improve the robot's performance and establish an automation system for overall layout work process.

Automation of M.E.P Design Using Large Language Models (대형 언어 모델을 활용한 설비설계의 자동화)

  • Park, Kyung Kyu;Lee, Seung-Been;Seo, Min Jo;Kim, Si Uk;Choi, Won Jun;Kim, Chee Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.237-238
    • /
    • 2023
  • Urbanization and the increase in building scale have amplified the complexity of M.E.P design. Traditional design methods face limitations when considering intricate pathways and variables, leading to an emergent need for research in automated design. Initial algorithmic approaches encountered challenges in addressing complex architectural structures and the diversity of M.E.P types. However, with the launch of OpenAI's ChatGPT-3.5 beta version in 2022, new opportunities in the automated design sector were unlocked. ChatGPT, based on the Large Language Model (LLM), has the capability to deeply comprehend the logical structures and meanings within training data. This study analyzed the potential application and latent value of LLMs in M.E.P design. Ultimately, the implementation of LLM in M.E.P design will make genuine automated design feasible, which is anticipated to drive advancements across designs in the construction sector.

  • PDF

Real-Time Construction Resource Monitoring using RFID/USN Inter-working System (RFID/USN 연동 시스템을 활용한 건설자원 실시간 모니터링 시스템)

  • Ryu, Jeoung-Pil;Kim, Hyoung-Kwan;Kim, Chang-Yoon;Kim, Chang-Wan;Han, Seung-Heon;Kim, Moon-Kyum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.90-94
    • /
    • 2007
  • Location tracking automation of resources in construction industry is one of the most important procedures to improve construction project performance and reduce the period of construction. Recently, location tracking technologies have proven to be effective in tracking construction materials and equipment in real time through the instrumentality of RFID (Radio Frequency Identification). By using wireless communication and inter-working system between RFID and USN, it is possible that construction engineers receive the location information of construction resources without additional efforts that move the RFID reader to read tags periodically. In the inter-working system, RFID reader delivers the acquired materials information to sensor node which is connected by serial interface. Then sensor node transmits the received data to the data aggregation terminal that is a sink node. The data aggregation terminal can transmit collected data to construction manager who is out of construction site using infrastructure such as CDMA(Code Division Multiple Access) network. The combination model of the two system and field test scenarios are presented in this paper.

  • PDF

Development of an Optimal Trajectory Planning Algorithm for an Automated Pavement Crack Sealer

  • Yoo, Hyun-Seok;Kim, Young-Suk
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.35-44
    • /
    • 2012
  • In the last two decades, several tele-operated and machine-vision-assisted systems have been developed in the construction and maintenance area, such as pavement crack sealing, sewer pipe rehabilitation, and excavation. In developing such tele-operated and machine-vision-assisted systems, trajectory plans are very important tasks for the optimal motions of robots whether their environments are structured or unstructured. This paper presents an optimal trajectory planning algorithm used for a machine-vision-assisted automatic pavement crack sealing system. In this paper, the performance of the proposed optimal trajectory planning algorithm is compared with the greedy trajectory plans, which are used in the previously developed pavement crack sealing systems. The comparison is based on the computational cost vs. the overall gains in crack sealing efficiency. Finally, it is concluded that the proposed algorithm plays an important role in the productivity improvement of the developed automatic pavement crack sealing system.

A Multi-agent based Cooperation System for an Intelligent Earthwork (지능형 토공을 위한 멀티에이전트 기반 협업시스템)

  • Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.5
    • /
    • pp.1609-1623
    • /
    • 2014
  • A number of studies have been conducted recently regarding the development of automation systems for the construction sector. Much of this attention has focused on earthwork because it is highly dependent on construction machines and is regarded as being basic for the construction of buildings and civil works. For example, technologies are being developed in order to enable earthwork planning based on construction site models that are constructed by automatic systems and to enable construction equipment to perform the work based on the plan and the environment. There are many problems that need to be solved in order to enable the use of automatic earthwork systems in construction sites. For example, technologies are needed for enabling collaborations between similar and different kinds of construction equipment. This study aims to develop a construction system that imitates collaborative systems and decision-making methods that are used by humans. The proposed system relies on the multi-agent concept from the field of artificial intelligence. In order to develop a multi-agent-based system, configurations and functions are proposed for the agents and a framework for collaboration and arbitration between agents is presented. Furthermore, methods are introduced for preventing duplicate work and minimizing interference effects during the collaboration process. Methods are also presented for performing advance planning for the excavators and compactors that are involved in the construction. The current study suggests a theoretical framework and evaluates the results using virtual simulations. However, in the future, an empirical study will be conducted in order to apply these concepts to actual construction sites through the development of a physical system.

The Needs for Training Manpower and the Change in Construction Environment by Equipment Based BIM Design (설비분야 BIM 설계에 따른 건축환경 변화와 인재양성의 필요성)

  • Kim, Jong-Hwan
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.14 no.4
    • /
    • pp.157-165
    • /
    • 2011
  • The study figures out the alternatives of training BIM design experts which is the biggest obstacle in training manpower of professional BIM designer, the largest problem when the plant introduce BIM design about the change in Construction Environment by Equipment Based BIM Design in reality of design followed by equipment based BIM design, education institution plan. BIM is the system which is built to make these information be used easier and technique which enables design construction and maintenance in 3-dimensional virtual space by designing buildings in 3-dimensional space, and by data-basing the generated information of every life-cycle information. As the essential contents of the study, educational institutions with the public authority should invest the opening of educational programs, recruit of experts and development of textbooks from a long-term perspective. And also, the role of public institution is important above all for the development of construction industry.