• 제목/요약/키워드: Automation in Construction

검색결과 556건 처리시간 0.03초

VRML기반 실시간 RFID+4D 진도관리 시스템 개발 (VRML based Realtime RFID+4D Progress Management System Development)

  • 박재현;윤수원;최철호;진상윤
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 2부
    • /
    • pp.99-102
    • /
    • 2010
  • Today's construction is higher and more complex. So types and amounts of needed materials for construction project are increasing and those are occurred problems in construction site such as insufficient working space, confusion of materials handling order and working circulation. Because of those problems, research of progress management system using RFID+4D has been studied, but it is impossible to manage progress and material statement in real-time. So this study analyzed problems of current research and suggested VRML based RFID+4D Progress Management System. This Study focused on system basic concept and interface is designed for system development. This research is still progressing, so it has to do more development and research. However, it could be expected construction management efficiency and automation of management tasks.

  • PDF

국내 공동주택 모듈러 적용 활성화에 관한 연구 (The Study on the Activation of Domestic Co-Housing Module Application)

  • 김충희;심운준;안용선
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.141-142
    • /
    • 2013
  • The modular construction method have improved quality, reduction of defects, such as the reduction of air, a number of advantages. It is utilized composite, larger, in skyscraper building already abroad. The domestic, various studies have been conducted on technical matters taller, automation of production, such as process control, but is still inadequate circumstances. Therefore, in this study, is the purpose that you have presented activation measures to investigate and analyze the case of co-housing with a modular construction system of outside, and to make the co-housing of modular construction system of domestic.

  • PDF

지능형 굴삭시스템 개발;연구단 소개 (Development of Intelligent Excavating System;Introduction of research center)

  • 서종원;박창우;장달식
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.197-204
    • /
    • 2007
  • 현재 건설산업 현장에서 나타나는 숙련공 부족 현상, 고령화 문제, 안전상의 문제로 인한 노무 생산성 저하, 임금 상승으로 인한 채산성 악화, 품직 확보의 어려움 및 시공기술 경쟁력의 약화는 국내 건설산업이 해결해야 할 필수적인 당면과제이다. 한편 위험${\cdot}$유해한 작업환경에서 운용되는 토공장비나 매립지에서의 다짐 및 복토공사, 지뢰 및 폭탄 등에 의한 폭발의 위험이 있는 장소에서의 토공작업, 극한지 공사와 같은 환경에서의 공사수요도 점차 늘어가고 있다. 이와 같은 상황에서 토공의 생산성, 품질 및 안전도를 확보하기 위해서는 지능화된 자동화 장비를 이용하여 효율적으로 작업을 수행할 수 있도록 해야 할 필요가 있다. 따라서 본 연구에서는 지능형 굴삭시스템의 개발을 통하여 작업현장의 안전성을 제고하고 품질, 생산성 및 채산성을 향상시키고 선진외국에 비해 보다 진보되고도 경제성 확보가 가능한 건설 자동화 기술의 구현과 기술개발을 통해 국내 건설산업에 있어 새로운 Market Sector의 창출하고자 한다.

  • PDF

Scan-to-BIM 자동화 기술을 활용한 건축물 단위의 BIM 모델 생성 - 강원소방학교 BIM 모델링 실증을 중심으로 - (BIM Model Generation at Building Level using Automated Scan-to-BIM Process - Focused on Demonstration of BIM Modeling for Gangwon Fire Service Academy -)

  • 박준우;김재홍;김소현;이지민;최창순;정광복;이재욱
    • 한국BIM학회 논문집
    • /
    • 제11권4호
    • /
    • pp.53-62
    • /
    • 2021
  • The successful implementation of Scan-to-BIM automation depends on the entire process from scanning of buildings, including indoor facilities and furniture, to generating BIM models. However, the conventional Scan-to-BIM process requires a lot of time, manpower, and cost for the manual generation of BIM models including indoor objects. To solve this problem, this study applied a Scan-to-BIM automation process using a deep learning model and parametric algorithm to an existing building, Kangwon Fire Service Academy. To improve the accuracy of the BIM model, after object data was extracted from the scan data, the data was corrected according to actual object-specific conditions. As a result, the accuracy of the BIM model created by the proposed Scan-to-BIM automation process was 91% compared to the actual area of the construction drawings. In addition, it was confirmed that the BIM objects were automatically generated for 10 object classes.

Workload and Productivity during Work from Home (WFH) for the Construction Workforce

  • Wu, Hongyue;Chen, Yunfeng
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.492-499
    • /
    • 2022
  • A large number of employees shifted to Work from home (WFH) due to the COVID-19 pandemic, including the construction workforce. The changes in workload and productivity due to WFH impact the work performance and economic outputs of companies. However, there are mixed results about the impacts of WFH on workload and productivity. In particular, limited studies focused on specific types of work of different occupations in the construction workforce. This study aims to explore the impacts of WFH on workload and productivity considering different types of work for the construction workforce in the U.S. After identifying three main occupations and five types of work, an online survey (N = 69) was distributed. Descriptive analysis showed that participants had less workload (0.82 hours/week) and lower productivity (9.69%) during WFH. Three occupations had varied changes due to the different types of work. Analysis of Variance (ANOVA) indicated that there was no significant difference in workload, while productivity was decreased during WFH. In particular, the productivity of project-related work and communication and documentation decreased significantly. Overall, participants finished 2.85% less workload per week during WFH. The findings provide an insight into WFH in the construction workforce, which improves future remote or hybrid work arrangements in the construction industry.

  • PDF

AUTOMATED HAZARD IDENTIFICATION FRAMEWORK FOR THE PROACTIVE CONSIDERATION OF CONSTRUCTION SAFETY

  • JunHyuk Kwon;Byungil Kim;SangHyun Lee;Hyoungkwan Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.60-65
    • /
    • 2013
  • Introducing the concept of construction safety in the design/engineering phase can improve the efficiency and effectiveness of safety management on construction sites. In this sense, further improvements for safety can be made in the design/engineering phase through the development of (1) an automated hazard identification process that is little dependent on user knowledge, (2) an automated construction schedule generation to accommodate varying hazard information over time, and (3) a visual representation of the results that is easy to understand. In this paper, we formulate an automated hazard identification framework for construction safety by extracting hazard information from related regulations to eliminate human interventions, and by utilizing a visualization technique in order to enhance users' understanding on hazard information. First, the hazard information is automatically extracted from textual safety and health regulations (i.e., Occupational Safety Health Administration (OSHA) Standards) by using natural language processing (NLP) techniques without users' interpretations. Next, scheduling and sequencing of the construction activities are automatically generated with regard to the 3D building model. Then, the extracted hazard information is integrated into the geometry data of construction elements in the industry foundation class (IFC) building model using a conformity-checking algorithm within the open source 3D computer graphics software. Preliminary results demonstrate that this approach is advantageous in that it can be used in the design/engineering phases of construction without the manual interpretation of safety experts, facilitating the designers' and engineers' proactive consideration for improving safety management.

  • PDF

A Construction Supply Chain Management Process with RFID/WSN-based Logistics Equipment

  • Shin, Tae-Hong;Yoon, Su-Won;Chin, Sangyoon
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권4호
    • /
    • pp.11-19
    • /
    • 2012
  • Construction supply chain management (CSCM) has become one of the critical factors that determine the success of a construction project as it becomes increasingly complicated and mega-sized. Particularly for high-rise or mega-sized building construction, just-in-time supply chain management is required due to lack of storage space and effective logistics for construction components and materials at a construction site. Despite the fact that research and development of radio frequency identification (RFID) and wireless sensor network (WSN) technology have been performed, construction project managers still need to carry mobile devices and check material and component flow at each stage of the supply chain process. This research proposes that the equipment used in the construction supply chain process, such as movers, trailers, gates, and hoists, can become main actors in the supply chain process using RFID and WSN technologies. And the proposed equipment and process focused on a solution to the redundancy identification problem, which has been observed in operations that use RFID/WSN-based processes for construction logistics. This paper also presents issues identified through verification and validation of the research results and proposes further studies.

정보통신 기술을 이용한 건설기계 관리시스템 (Construction Equipment Management System Using Information and Communication Technologies)

  • 김성근;서종원;이준복;김영석
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.535-538
    • /
    • 2006
  • 2005년 건설기계의 등록대수가 32만대를 넘어서고 있다. 건설은 점차적으로 가계화되면서 인력감축, 생산성 및 품질의 향상을 가져왔다. 그리나 건설기계라는 관점에서 건설기계의 효과적인 작업 및 관리, 가동성 향상과 사회간접자본 시설물의 안전향상, 그리고 민원감소를 위하여 해결해야 할 문제들이 있다. 현재 건설업을 위한 정보통신기술의 실현성이 가속화되고 있다. 본 논문에서는 주어진 문제를 해결하기 위하여 정보통신기술을 적용한 건설기계 관리시스템을 제안하고자 한다. 건설기계 관리시스템의 개발은 더 낳은 건설기계의 작업과 관리가 가능할 것으로 사료된다.

  • PDF

Design and Application of Self-Lifting & Slewing Multi-Cranes Platform

  • Kun Zhang;Kaiqiang Wang;Bo Chen;Qing Sun;Hui Yang;Xin Ba;Jinming Zhao
    • 국제초고층학회논문집
    • /
    • 제11권2호
    • /
    • pp.103-114
    • /
    • 2022
  • Tower crane is of great importance in the construction of high rise buildings. A self-lifting & slewing multi-cranes platform (referred to as crane slewing platform) was developed to optimize the configuration of tower cranes, as well as solve the problems of cooperative operation conflict between multiple cranes and other construction equipment and their respective climbing and occupying of construction period. The design and test of the slewing platform was introduced. By applying the slewing platform in the construction of Chengdu Greenland Center super high rise building project, some key technologies such as the configuration of cranes, the installation, construction and lifting of the slewing platform are implemented and validated. Up to now, the slewing platform has been safely lifted up 98 times in Chengdu Greenland Center project construction, and achieved good social and economic benefits.

건설 업체의 브랜드아파트 마케팅 전략 방안 (A Marketing Strategy for Brandapartment of Construction Companies)

  • 이상범;조영준;임남기
    • 한국건축시공학회지
    • /
    • 제4권3호
    • /
    • pp.153-159
    • /
    • 2004
  • The brand value of apartment which affects not only sale percent and profit but also the worth of real estate is raised as an important point of sale competition in the apartment market. But now the market is occupied by a few construction companies, which have well recognized brand. So it's difficult for a construction company without brand to enter the apartment market because of consumer's ignorance. domestic construction companies are spending lots of money and effort to advertise their characteristic brandapartment based on classified consumer's desire and offer consumers what they want. Therefor, This study investigated the factors of recently characteristic brandapartment focusing on design, environment, materials, home automation and surveyed residents preference of a brand by P.O.E methods. Based on such results of survey, this study suggest the basically reference information on characteristic strategy of an brandapartment.