• Title/Summary/Keyword: Automation in Construction

Search Result 556, Processing Time 0.034 seconds

Development of 3D Underground Utilities Processing and Partial Update Automation Technology - Focused on 3D Underground Geospatial Map - (3차원 지하시설물 가공 및 부분갱신 자동화 기술개발 - 지하공간통합지도 중심으로 -)

  • LEE, Min-Kyu;CHOI, Sung-Sik;JEON, Heung-Soo;KIM, Sung-Su
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.23 no.4
    • /
    • pp.1-15
    • /
    • 2020
  • As cities expand and underground utilities construction projects increase, there is an urgent need for a technology capable of analyzing the underground utilities network in 3D. Since 2015, 3D Underground Geospatial Map project, that has been integrating 15 types of underground information such as underground utilities, underground structures, and ground information, is in progress in S. Korea. However, the construction of 3D underground facilities is currently based on manual work and the logic for building a 3D model is very complicated. And it takes a lot of time and cost to process millions of large amounts of data per local governments. By presenting a framework on the processing and partial updating of the 3D underground utilities model, this paper aims to establish a plan to quickly build a 3D underground utility model at a minimum cost. The underground utilities processing and partial update automation technologies developed in this study are expected to be immediately applied to the 3D Underground Geospatial Map project.

Automatic Pipeline Welding System with Self-Diagnostic Function and Laser Vision Sensor

  • Kim, Yong-Baek;Moon, Hyeong-Soon;Kim, Jong-Cheol;Kim, Jong-Jun;Choo, Jeong-Bog
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.1137-1140
    • /
    • 2005
  • Automatic welding has been used frequently on pipeline projects. The productivity and reliability are most essential features of the automatic welding system. The mechanized GMAW process is the most widely used welding process and the carriage and band system is most effective welding system for pipeline laying. This application-oriented paper introduces new automatic welding equipment for pipeline construction. It is based on cutting-edge design and practical welding physics to minimize downtime. This paper also describes the control system which was designed and implemented for new automatic welding equipment. The system has the self diagnostic function which facilitates maintenance and repairs, and also has the network function via which the welding task data can be transmitted and the welding process data can be monitored. The laser vision sensor was designed for narrow welding groove in order to implement higher accuracy of seam tracking and fully automatic operation.

  • PDF

Automatic Measurement of Construction Equipment Efficiency Using a 11-Axis Composite Sensor (11축 복합센서를 통한 건설기계 효율성 측정 자동화 방안)

  • Kwon, Jae-bum;Cho, Dae-gu;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.59-60
    • /
    • 2012
  • A large-scale construction project relies much on the efficiency of construction equipment. Therefore, efficient and accurate measurement on the productivity of construction equipment is one of important task in the construction industry. Based on the motivation, this paper proposes a 11-axis composite sensor for an automatic measurement of construction equipment. A 11-axis composite sensor is composed of a gyroscope, geomagnetic and accelerometer sensor for the purpose of real-time motion captures of construction equipment. It is expected that the proposed system can save considerable time, effort and cost of measuring a efficiency of construction equipment.

  • PDF

A Study on the Effectiveness of the 4th Industrial Technology Application for School Building Construction Work (학교건물 시공을 위한 4차 산업기술 적용의 효과성에 대한 연구)

  • Min, Kyung-Suk
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.19 no.4
    • /
    • pp.78-87
    • /
    • 2020
  • This study proposed the basic data that contributes to inducing an effective construction plan through the application of the 4th industrial technology to construct a school building that can guarantee the five goals of construction management: cost, process, quality, safety, and environmental management. To this end, 3D printing, drones, robot automation, and augmented reality technologies that are highly usable in construction sites were identified for construction workers. As part of this, related literature and research data were investigated. The selected 4th industrial technology was investigated and analyzed on how it was used for cost, process, quality, safety, and environmental management in a detailed school construction process. As a result of the analysis, significant results were found for the application plan of the 4th industrial technology in school construction for cost, process, quality, safety, and environmental management.

Analysis of key technology for the development of environmentally-friendly intelligent housing component system (친환경 지능형 건축 Component system 개발을 위한 요소기술 분석)

  • Kim, Jung-Yong;Ahn, Byung-Ju;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.844-847
    • /
    • 2007
  • As the interest of environment is increasing all over the world, the effort to protect environment in many industries is also being made. In the case of Construction, the effort keeps being made in effect as well. Therefore, this paper suggests the environmental-friendly smart component system which contains multiple performances such as Environmental-friendly, high-durability, variability, renovation and comfort and could be the basic factor of future building. As the enquired performances for the development of environmentally-friendly intelligent component system are grasped, the key technology to be embodied are analyzed. In the result of the analysis, SI(Skeleton & Infill) housing and Home automation are deduced as the key technology. Furthermore, it look through concept and development tendency of the main factors. Finally environmental-friendly smart component system is suggested with conversing the factors deduced.

  • PDF

Development of Automatic Construction System for Steel Frames of High-Rise Buildings (로보틱 크레인 기반 고층건물 구조체 시공 자동화 시스템 개발)

  • Doh, Nak-Ju;Park, Gwi-Tae;Kang, Kyung-In;Im, Myo-Teak;Hong, Dae-Hui;Park, Shin-Suk;Lee, Seoung-Kyou
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.84-89
    • /
    • 2007
  • In this paper, we introduce a new technique for automatic construction of steel frames in high-rise buildings. Basically, we combine advanced robotic technologies to building construction techniques. Four main topics will be developed such as: 1) Planning and synthesis of automatic construction system, 2) Development of construction factory system with climbing oil-pressured robot, 3) Core techniques for automatic assembly for steel frames, and 4) Intelligent resource management system. We expect that this new technique will increase the construction efficiency and will alleviate the manpower shortage problem in the aging society.

  • PDF

Classifying Management Tasks to Improve PC Construction Management System (PC공사 관리체계 개선을 위한 주요 관리업무 분류)

  • Mun, Seong-Hwan;Kim, Taehoon;Cho, Kyuman
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.177-178
    • /
    • 2020
  • In the construction industry, expectations for the Precast Concrete(PC) construction method are rising due to demands for high quality and productivity and social and environmental issues. However, although technical problems that occurred in the early stages of technology introduction have been solved, research related to proper construction management for PC construction methods has been relatively neglected and the advantages of PC construction methods have not been fully utilized. In this study, each group involved in PC works was surveyed to identify important management tasks affecting productivity of PC works to improve PC contruction management system. Based on factor analysis, 22 tasks were calssified into 5 management groups. The results of this study will be used to present a framework for the application of automation and information technology to improve the productivity of PC works.

  • PDF

Emergency Scenarios of Rail-mounted Window Cleaning System (유리창 외부 부착형 청소장치의 비상상황 시나리오 도출)

  • Kim, Kyoon-Tai;Jun, Young-Hum
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.244-245
    • /
    • 2019
  • Recently, a variety of window cleaning devices have been developed. There are, however, few cases of anticipated problems and countermeasures that may arise after these devices are installed. Therefore, in this study, the emergency condition was derived and the emergency scenario was derived for the rail-mounted cleaning device. Emergency scenarios and countermeasures derived from this study will be used for continuous improvement and supplementation of cleaning devices through prototyping and testing.

  • PDF

AUTOMATING SUPERVISORY MANPOWER ALLOCATION FOR CONSTRUCTION SITES

  • Jieh-Haur Chen;Li-Ren Yang;W. H. Chen;C. K. Chang
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.239-248
    • /
    • 2007
  • In the highly competitive construction industry, a slight inaccuracy of estimation can easily cause the loss of a project. Erroneous experience-based cost estimates or allocations of on-site supervisory manpower often offset the profit gained from the project and may jeopardize the management processes. To counter these types of problems, we develop a model using mathematical analysis and case-based reasoning to automate the allocation of on-site supervisory manpower and estimate construction site costs. The method is founded upon laborious data collection processes and analysis by matching statistical assumptions, and is applicable to construction projects. In the modeling the costs and allocation of on-site supervisory manpower are quantified for both owners and contractors before initiating or bidding on the projects. The findings confirm that the degree of variation of the model predictions has an accuracy rate at 88.47%. Single-site construction projects can be accurately predicted and the assignment of supervisory manpower feasibly automated.

  • PDF

SYSTEM ARCHITECTURE FOR INTEGRATION OF CONSTRUCTION E-BUSINESS SOLUTIONS: A MODEL FOR ENTERPRISE RESOURCE PLANNING AND PROJECT MANAGEMENT SYSTEM

  • Boong-yeol Ryoo;Irtishad U. Ahmad;Juan Zheng
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.497-502
    • /
    • 2005
  • Needs of automation and computerization in the construction industry has been recognized but the implementation of e-business solutions with project management systems has not been fully explored. In order to cope with different management practices in home office and project sites, integration of two popular systems, Enterprise Resource Planning (ERP) and Project Management System (PMS) is essential. The objective of this study is to find ways to functionally and systematically integrate ERP and PMS. With the integration of ERP and PMS, a project will be managed much more efficiently and effectively. It is expected that this study will benefit system integrators and help them to understand construction management processes and integrate the solutions with minimized programming work.

  • PDF