• Title/Summary/Keyword: Automation in Construction

Search Result 556, Processing Time 0.03 seconds

A Case Study of Post-Occupancy Evaluation of Home Automation System by Digital Home Residents - Focused on H Highrise Apartment - (디지털 홈 거주자의 홈오토메이션 시스템에 대한 거주 후 평가 사례 연구 - H 초고층 아파트 거주자를 중심으로 -)

  • Kwon, Oh-Jung
    • Journal of the Korean housing association
    • /
    • v.19 no.1
    • /
    • pp.17-27
    • /
    • 2008
  • Recently, newly built apartments in Korea are provided various home automation (HA) systems based on information technology(IT) for residents' safer, healthier and more convenient living. However, the residents in these digital apartments are often not able to use the home automation systems effectively because of lack of their IT knowledge, attitude, or education. However, there are few researches have been done to find out the HA systems' real problems with regard to residents' aspects who use those systems everyday. The purpose of this study was to find out residents' current uses, satisfaction level and existing problems of HA systems by residents' POE. The findings of this study will give useful information to digital home construction companies to provide user-friendly digital home services for increasing users' satisfaction. One distinctive apartment equipped with home automation systems located in Seoul was selected for in-depth personal interview. The researcher developed a survey instrument and collected the data from 58 residents in January, 2007 who had been living there for more than a year. The results of the study found that critical problems were existed in several systems and they caused a lot of dissatisfaction from the residents. Also, some residents do not use several systems although they need to use them due to the burden of maintenance fee. Further detail findings and suggestions of this study were discussed.

A Study on the Standardization of Operation System for Road Tunnels (터널운영시스템 표준화 연구)

  • Kim, Tae-Hyung;Kim, Jin;Keum, Jae-Sung;Tae, Jae-Ho;Kim, Sun-Hong;Hong, Dae-Hie
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.75-79
    • /
    • 2008
  • Since tunnel construction order was placed one by one, various sensors and actuators installed at the RTU and higher level system in each tunnel maintenance office had their own protocols depending on construction company. The TGMS testbed established on the extended region of Yong-dong Highway, for example, did not have consistent protocol between each automation levels and management levels without considering the functions and/or roles of each level. The management sever in each tunnel was simply networked to the TGMS server. Therefore, it is impossible to implement a new control algorithm as well as to integrate each other since each tunnel was constructed by different company. So, if the construction company is out of business, there is no way to maintain the corresponding tunnel effectively. In order to solve this problem, all the necessary standard protocols was established between automation level and management levels. These interface standards provide the clear classification between individual tunnel system and tunnel management system. So, even if construction company is different, its effect is minimized, so that it is expected to successfully establish PC based TGMS.

  • PDF

Grand M Hotel interior renovation (포항 Grand M Hotel, 리노베이션 계획안)

  • Kim, Hye-Ja
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2006.05a
    • /
    • pp.97-98
    • /
    • 2006
  • This study proposes a method of generating steel house shop drawing in an automated design method, reducing construction manpower and period. With one hour fire-resistant approval code, reflecting work ability and efficiency, steel-framed house market is expected to extend from one or two story house to multi-purpose facilities up to four story height. More models have been constructed in this system than the first appearance of fire-resistant approval in Korea in 1997 Also, cost estimation of components such as frame walls, roof trusses and floors is obtained with shop drawings. Also, the lack of suppliers of steel framed house shop drawing and unstandardized drawing method get constructors have difficulty in understanding its design. In steel framed house industry, shop drawings are essential part in building and constructing framework and they have major effects on construction deadlines and expenses. By exploring method of shop drawing automation, this study aims to optimize work flow with a standardized drawing method. The proposed system can be applied to manufacturing automation in domestic industry of factory-built panelizing method in the near future.

  • PDF

Construction of In-process Monitoring System using $C^{++}$ and Neural network ($C^{++}$과 신경망을 이용한 In-process 감시 시스템의 구축)

  • 조종래;정윤교
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2002.10a
    • /
    • pp.95-98
    • /
    • 2002
  • Monitoring of the cutting trouble is necessarily required to do Factory Automation and Intelligent manufacturing system. Therefore, we constructed a monitoring system using neural network in order to monitor of the cutting trouble. From obtained result, it is shown that the cutting trouble can be monitored effectively by neural network

  • PDF

A Study on the Influential Factors on Decision Making of Frame Construction Scheduling For Automated Construction (건설자동화를 위한 철골 공사 계획의 의사결정 영향요인에 관한 연구)

  • Choi, Jeong-Phil;Kim, Kyung-Hwan;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.209-212
    • /
    • 2009
  • During the last few decades, several companies and research laboratories have developed construction robots in an effort to improve productivity, quality, and reduce construction time and safety concerns. Recently, domestic construction industry is also interested in developing the construction robots. However, the studies on the research and development process is impossible in real field. A existing research's object is the development of the research on the assumption that construction's environment is a fixed form, But real construction's environment is very dynamic and atypical. So it is very difficult that we apply construction automation and robots. In order to solve this problem, this study deduce influential factors on decision making of frame construction scheduling for automated construction.

  • PDF

Development of Task Planning System for Intelligent Excavating System Applying Heuristics (휴리스틱스(Heuristics)를 활용한 지능형 굴삭 시스템의 Task Planning System 개발)

  • Lee, Seung-Soo;Kim, Jeong-Hwan;Kang, Sang-Hyeok;Seo, Jong-Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6D
    • /
    • pp.859-869
    • /
    • 2008
  • These days, almost every industry's production line has become automatic and this phenomenon brought a lot of benefits such as increase in productivity and economical effect, assurance in industrial safety, better quality and compatibility. However, unlike industrial production line, in construction industry, automation has number of barriers like uncertainty incidents and intellectual judgment to make ability to make solution out of it. Therefore construction industry is still demanding use of construction machine through labor. Due to this matter operational labor in construction industry is aging and fading. To solve these problem, in developed nations like Europe, US or Japan are keep researching for the automation in construction and road pavement, strengthening and some other simple operations have been worked through automation but in civil engineering site, automation research is still low despite of its importance in constructional site. For automating civil engineering operation, effective operational plan have to be set by analyzing ground information acquainted. If skillful worker apply heuristics, trial & error can be reduced with increased safety and the effective work plan can be established. Hence, this research will introduce Intellectual Task Planning System for Intelligent Excavating System's effective work plan and heuristics applied in each steps.

Knowledge Support and Automation of Paneled Building Envelopes for Complex Buildings using Script Programming

  • Park, Jungdae;Im, Jinkyu
    • International Journal of High-Rise Buildings
    • /
    • v.4 no.1
    • /
    • pp.85-90
    • /
    • 2015
  • Advances in the technology of computational design are giving architects and engineers the opportunity to analyze buildings with complex geometries. This study explores the optimization and automation process using the parametric design method, and uses digital tools to achieve surface representation and panelization for curved shaped office buildings. In this paper, we propose parametric algorithms of dimensional and geometric constraints using the Knowledge-ware scripts embedded in Gehry Technologies' Digital Project. The knowledge-based design methods proposed in this study can be used to systemize the knowledge possessed by experts in the form of data. Such knowledge is required to promote collaboration between designers and engineers in the process of CAD/CAE/CAM. The aim of this study is to integrate the process into design, which establishes an integrated process. This integration enables two-way feedback between design and construction data by combining the methods used in designing, engineering, and construction.

Large Point Cloud-based Pipe Shape Reverse Engineering Automation Method (대용량 포인트 클라우드 기반 파이프 형상 역설계 자동화 방법 연구)

  • Kang, Tae-Wook;Kim, Ji-Eum
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.3
    • /
    • pp.692-698
    • /
    • 2016
  • Recently, the facility extension construction and maintenance market portion has increased instead of decreased the newly facility construction. In this context, it is important to examine the reverse engineering of MEP (Mechanical Electrical and Plumbing) facilities, which have the high operation and management cost in the architecture domains. The purpose of this study was to suggest the Large Point Cloud-based Pipe Shape Reverse Engineering Method. To conduct the study, the related researches were surveyed and the reverse engineering automation method of the pipe shapes considering large point cloud was proposed. Based on the method, the prototype was developed and the results were validated. The proposed method is suitable for large data processing considering the validation results because the rendering performance standard deviation related to the 3D point cloud massive data searching was 0.004 seconds.

Challenges and suggestions of resource planning for standardized concurrent construction

  • Chen, Xingbin;Li, Sining;Kim, Jung In;Fang, Yuan
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.41-49
    • /
    • 2020
  • Concurrent construction offers considerable improvement for shorten the project duration of its production process. Therefore, standardized concurrent construction is widely applied in building construction projects. However, resources planning for standardized concurrent construction project is manually developed by construction manager. This practice is not effective since it is time-consuming and error-prone for managers to identify all project-specific information, distinguish different activity-resource types, interpret these types and analyze how they affect resource allocated on an ad hoc basis. Therefore, this research investigates the opportunity for leveraging activity modeling to enable automated resource planning for standardized concurrent construction during project development, with identifying the characteristics of construction activities under standardized concurrent planning and determining the activity-resources types that affects resource planning. Both will function as a basis for modeling these construction activities in a computer-interpretable manner and for automation in resource planning.

  • PDF

Investigation on the Development of 3D Concrete Printing(3DPC) Technology Using Coarse Aggregation (굵은 골재를 이용한 3D 콘크리트 프린팅 기술개발에 대한 연구)

  • Hwang, Jun Pil;Kwon, Hong-Kyu
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.45 no.3
    • /
    • pp.66-77
    • /
    • 2022
  • Digitization and automation technologies have rapidly maximized productivity and efficiency in all industries over the past few decades. Construction automation technology has either stagnated over the same period or has not kept pace with overall economic productivity. According to the research studies up to now, the output of concrete structures using coarse aggregates (8mm or more) is very limited due to the limitations of equipment and materials. In this study, information on the development process of 3DCP equipment that can print concrete structures with the printing width (100 mm or more) and printing thickness (30 mm or more) using a 3DCP material mixed with coarse aggregate (8 mm or more) is provided. To verify the performance of the developed 3DCP equipment, experimental data are provided on output variables, the number of layers, and the inter-layer printing time interval. The evaluation and verification data of various mechanical properties (compressive and splitting tensile strength) of printed materials using coarse aggregates are provided.