• Title/Summary/Keyword: Automatic construction system

Search Result 506, Processing Time 0.026 seconds

Semi-Automatic Construction of Morphological Pattern Dictionary using the Method of Morphological Synthesis (형태소 합성 기법을 이용한 형태소 패턴 사전의 반자동 구축)

  • Park, In-Cheol
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.11
    • /
    • pp.5278-5283
    • /
    • 2011
  • One approach for very high speed korean morphological analysis is to use pre-built morphological results in dictionary. It pays the high cost to build this morphological pattern dictionary manually, besides the dictionary may contain errors. This paper proposes a method to generate morphological patterns automatically using Korean morphological synthesis. The experiment shows that we automatically generate 86% morphological patterns for analyzing Korean sentences. It takes 52.68 seconds for the morphological system using the patterns to analyze 403MB Korean corpus on 2.8GHz Window system.

A Study on the Strengthening of Smart Factory Security in OT (Operational Technology) Environment (OT(Operational Technology) 환경에서 스마트팩토리 보안 강화 방안에 관한 연구)

  • Young Ho Kim;Kwang-Kyu Seo
    • Journal of the Semiconductor & Display Technology
    • /
    • v.23 no.2
    • /
    • pp.123-128
    • /
    • 2024
  • Major countries are trying to expand the construction of smart factories by introducing ICT such as the Internet of Things, cloud, and big data into the manufacturing sector to secure national-level manufacturing competitiveness in the era of the 4th industrial revolution. In addition, Germany is pushing for Industry 4.0 to build a fully automatic production system through the Internet of Things, and China is pushing for the expansion of smart factories to enhance the country's industrial competitiveness through Made in China 2025, Japan's intelligent manufacturing system, and the Korean government's manufacturing innovation 3.0. In this study, considering the increasing security connectivity of smart factories, we would like to identify security threats in the external connection part of smart factories and suggest security enhancement measures based on domestic and international standard security models to respond to the identified security threats. Eventually the proposed method can be applied by accurately identifying the smart factory security status, diagnosing vulnerabilities, establishing appropriate improvement plans, and expanding security strategies to respond to security threats.

  • PDF

Multi-Objective Optimization of Steel Frames For Standardized Steel Profiles Under Seismic Loads (지진하중을 받는 강뼈대구조물의 표준단면에 대한 다목적 최적설계)

  • Cho, Hyo Nam;Min, Dae Hong;Jeong, Bong Gyo
    • Journal of Korean Society of Steel Construction
    • /
    • v.14 no.6
    • /
    • pp.783-791
    • /
    • 2002
  • An improved formulation for multi-objective optimization was proposed. This formulation was applied to steel seismic loads. The multi-objective optimization problem was formulated with minimum structural weight, maximum strstability. The global criterion method was employed to find a rational solution closest to the ideal solution for the optimization problem using standard steel profile, To efficiently solve the optimization problem, the decomposition meth both system-level and element-level was used. In addition, various techniques including efficient reanalysis technique intermediate variables and sensitivity analysis using an automatic differentiation(AD) were incorporated. Moreover the reamong section properties fitted to the section profile used in order to link the system level and the element level. From numerical investigation, it could be stated that the proposed method will lead to the more rational design compared with one.

Development of Ultrasonic Testing System for In-Service Inspection of the Shrunk-on Type LP Turbine Roter (Shrunk-on Type 저압 터빈 로터의 가동중검사를 위한 초음파검사 시스템 개발)

  • Park, Joon-Soo;Seong, Un-Hak;Ryu, Sung-Woo
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.29 no.2
    • /
    • pp.130-136
    • /
    • 2009
  • Turbine, which is one of major components in nuclear power plants, requires reliable nondestructive inspections. But, accessibility of transducers is limited and interpretation of acquired signals is not easy at all due to the complication. So, in this study, we have fabricated mock-up specimens of real size and shape. we applied pulse-echo method and time-of-flight diffraction(TOFD) method for precise inspection of turbine key and wheel bore. And phased array ultrasonic testing method was adopted for wheel dovetail of turbines by using mock-up. Furthermore, an automatic scanner system was developed for in-service inspection of the developed methods.

Spatial Image Information Generation of Rock Wall by Automatic Focal Length Extraction System (초점거리 자동추출 시스템에 의한 암벽의 공간영상정보 생성)

  • Lee, Jae-Kee;Lee, Kye-Dong
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.25 no.5
    • /
    • pp.427-436
    • /
    • 2007
  • Because the slope made up the construction of any other facilities, has many risks of a collapse, existing inspection methods to collect information for a construction site of slope bring up a long time of inspection period, cost and approach for a measuring instrument and it presents the critical point of collecting materials. For getting images to use zoom lens in any positions this study will use free zoomer constructed values of data classified by the focal length develop Image Loader system to make it load not only camera information but also camera test data values of the focal length took a photograph automatically if it measure to use a variety of cameras or other lens. Also, as it constructs three dimensions spatial image information from images of obtained objects this study presents effective basic materials of slope surveying and inspection and it shows exact surveying methods for dangerous slope not to access.

Improvement of SOC Structure Automated Measurement Analysis Method through Probability Analysis of Time-History Data (시계열 데이터의 확률분석을 통한 SOC 구조물 자동화계측 분석기법 개선)

  • Jung-Youl Choi;Dae-Hui Ahn;Jae-Min Han;Jee-Seung Chung;Jung-Ho Kim;Bong-Chul Joo
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.1
    • /
    • pp.679-684
    • /
    • 2023
  • Currently, large-scale and deep-depth excavation construction is being carried out in the vicinity of structures due to overdensity in urban areas in Korea. It is very important to secure the safety of retaining structures and underground structures for adjacent excavation work in urban areas. The safety of facilities is managed by introducing an automated measurement system. However, the utilization of the results of the automated measurement system is very low. Conventional evaluation techniques rely only on the maximum value of the measured data, and can overestimate abnormal behavior. In this study, we intend to improve the analysis technique for the automation measurement results. In order to identify abnormal behavior of facilities, a time-series analysis method for automated measurement data was presented. By applying a probability statistical analysis technique to a vast amount of data, highly reliable results were derived. In this study, the analysis method and evaluation method that can process the vast amount of data of facilities have been improved.

Domestic current situation and Improvement plan Consideration of Electricity Design & Supervision System (전기설계.감리제도의 합리적인 운영방안에 관한 고찰)

  • Jeong, Yeon-Hae;Nam, Ki-Beom;Sin, Hwa-Yeong;Jeong, Hyeong-Yong;Lee, Jong-Hyuk;Jun, Young-Su
    • Proceedings of the KIEE Conference
    • /
    • 2007.04b
    • /
    • pp.10-15
    • /
    • 2007
  • For the introduction of the electricity of the special design and supervision system to Protect the faulty-workmanship of the electricity equipment and to reserve the electricity safety, last 1995 "Electricity Technology Management Act" were carried out enactment. March 2002, we introduced the pre-Qualification system that is selected the competent company about the electricity design and supervision service over so much capacity which is ordered by the Public institution such as the nation, local autonomous entity, government investment institute and so on. December 2005, the electricity equipment over so much capacity was taken the housing construction plan's approval by the housing act in case, the municipal or district governor with the authority to approve who selected the electricity supervision company according to the pre-Qualification system. Due to the introduction of the system, we could expect the rights and interests increase of the consumer by eradicating dumping of the close relationship between supervision company and the builder, reduction and concurrent position of the supervisor, according to confirm the quality of the electricity equipment and electricity safety. In spite of introducing of the system, the problems occured as reducing the electricity designer's task range compared with different field, modifing the supervisor's rank system rationally, because of researching about the electricity design and supervision technique lacks. Also, KEEA(Korea Electric Engineers Association) manage the caller of the electricity design and supervisor(company or people), but the problems occured as opening to the public about the curler management, introducing automatic bidding system and We need the solution plan about this. Consequently, we consider the present situation of the domestic and outside and problem about the electricity design and supervision system in this paper, try to present rational operation plan through this.

  • PDF

Construction of Test Collection for Automatically Extracting Technological Knowledge (기술 지식 자동 추출을 위한 테스트 컬렉션 구축)

  • Shin, Sung-Ho;Choi, Yun-Soo;Song, Sa-Kwang;Choi, Sung-Pil;Jung, Han-Min
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.7
    • /
    • pp.463-472
    • /
    • 2012
  • For last decade, the amount of information has been increased rapidly because of the internet and computing technology development, mobile devices and sensors, and social networks like facebook or twitter. People who want to gain important knowledge from database have been frustrated with large database. Many studies for automatic knowledge extracting meaningful knowledge from large database have been fulfilled. In that sense, automatic knowledge extracting with computing technology has been highly significant in information technology field, but still has many challenges to go further. In order to improve the effectives and efficiency of knowledge extracting system, test collection is strongly necessary. In this research, we introduce a test collection for automatic knwoledge extracting. We name the test collection KEEC/KREC(KISTI Entity Extraction Collection/KISTI Relation Extraction Collection) and present the process and guideline for building as well as the features of. The main feature is to tag by experts to guarantee the quality of collection. The experts read documents and tag entities and relation between entities with a tool for tagging. KEEC/KREC is being used for a research to evaluate system performance and will continue to contribute to next researches.

A Framework Integrating Cost and Schedule based on BIM using IFC (IFC활용 BIM기반 공정/원가 통합관리 프레임워크)

  • Lee, Jin-Gang;Lee, Hyun-Soo;Park, Moonseo;Jung, Minhyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.53-64
    • /
    • 2013
  • In building construction project, there are numerous information or data parts across many different software applications and professional specialists. BIM (Building Information Modeling), as a medium for managing information generated during construction project, it is intended to enhance the effectiveness of construction management and reap a lot of advantages such as, automatic quantity takeoff, error-free estimation, 4D(3D+Time), 5D(4D+Cost) simulation. Nevertheless, the overall and practical effectiveness of BIM utilization is difficult to justify at this stage. While helpful, there are some limitation when BIM applied to construction management due to the differences of data processing process between BIM and work in the field, limitations of information generated from BIM object and interoperability problem among BIM application. Therefore, this paper propose a framework integrating BIM with cost-schedule information using IFC. And we construct the system prototype based on the framework and performed case study to examine the framework. The proposed framework provides the information basis for BIM based cost-schedule integration. ultimately, the framework increase the utilization of BIM and work efficiency of construction industry by supporting an understanding of information.

An Implementation of Expression System and Model for Automatic Creation of Flooding Area in the river (하천범람 영역 자동생성 모델 및 표출 시스템 구현)

  • Choi, Eun-Hye;Hwang, Hyun-Suk;Kim, Chang-Soo
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.16 no.4
    • /
    • pp.654-660
    • /
    • 2012
  • The goal of this paper is to calculate flood elevation by applying temporal distribution of rainfall through HEC-RAS(Hydrologic Engineering Center's River Analysis System) and to automatically create areas of flooding by a user-defined spatial model based on GIS using calculated values of flood elevation and detailed data of topography. Accuracy of topographic data is the most important factor because of deeply changing analysis results of flooding areas of a river. Therefore, this paper suggests a method of attributive and spatial data construction based on the GIS using UIS(Urban Information System, river-related reports, and hydrologic information. Also, we implement an expression system to provide analysis results extracted from the proposed model.