• Title/Summary/Keyword: Assembly Work Time

Search Result 143, Processing Time 0.026 seconds

컨베이어 벨트를 이용한 혼합 모델 조립 라인에서의 미완료 작업량을 최소화하기 위한 제품 투입 순서 결정

  • 김시원;정봉주
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.10a
    • /
    • pp.157-160
    • /
    • 2000
  • This study is concerned with how to optimize the Input sequence of product models with sequence -dependent setup time in Mixed-Model Assembly Line (MMAL) using conveyor system. Usually MMAL consists of a number of stations linked by conveyor belt and each station has a work zone limited by upstream and downstream boundaries. To avoid improper interference between operators in the adjacent stations and excess of machine moving range, operators are forced to complete their operations within their predetermined work zone. In this study, our goal is to determine sequence of models for minimizing the total work unfinished within their work zone. A generalized formulation of the product sequencing problem in MMAL is presented and we developed an optimal procedure using Branch & Bound. Also we developed a heuristic procedure using local search.

  • PDF

A study on the safety improvement and productivity's increase through continuous preventive maintenance (지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구)

  • Yang Doo Jin;Lee Chang Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.1
    • /
    • pp.101-115
    • /
    • 2005
  • This study deals with the procedure of safety improvement, productivity increase ,and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind ,the necessity ,and the concept of preventive maintenance ,and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss ,comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.

A study on the safety improvement and productivity's increase through continuous preventive maintenance. (지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구)

  • YANG DOOJIN;LEE CHANGHO
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.131-141
    • /
    • 2004
  • This study deals with the procedure of safety improvement, productivity increase, and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind, the necessity, and the concept of preventive maintenance, and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss, comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.

  • PDF

Development of an Intelligent Supervisory Programmable Controller for Automatic Assembly Machine (자동 조립 장치를 위한 지능 관리 제어기 개발에 관한 연구)

  • Jeon, C.H.;Lee, T.H.;Suh, I.H.;Huh, K.M.;Bien, Z.
    • Proceedings of the KIEE Conference
    • /
    • 1987.07a
    • /
    • pp.279-283
    • /
    • 1987
  • In this paper an intelligent supervisory programmable controller for automatic assembly machine is developed. This is achieved by adding sequence control hardware with input-interrupts to supervisory real time language and also by incorporating an automatic planning method which uses a predicate logic model and an action model. The designed intelligent supervisory programmable controller is applied to Die Bonding Machine and is to found to work well.

  • PDF

Estimation of 2D Position and Flatness Errors for a Planar XY Stage Based on Measured Guideway Profiles

  • Hwang, Joo-Ho;Park, Chun-Hong;Kim, Seung-Woo
    • International Journal of Precision Engineering and Manufacturing
    • /
    • v.8 no.2
    • /
    • pp.64-69
    • /
    • 2007
  • Aerostatic planar XY stages are frequently used as the main frames of precision positioning systems. The machining and assembly process of the rails and bed of the stage is one of first processes performed when the system is built. When the system is complete, the 2D position, motion, and stage flatness errors are measured in tests. If the stage errors exceed the application requirements, the stage must be remachined and the assembly process must be repeated. This is difficult and time-consuming work. In this paper, a method for estimating the errors of a planar XY stage is proposed that can be applied when the rails and bed of the stage are evaluated. Profile measurements, estimates of the motion error, and 2D position estimation models were considered. A comparison of experimental results and our estimates indicated that the estimated errors were within $1{\mu}m$ of their true values. Thus, the proposed estimation method for 2D position and flatness errors of an aerostatic planar XY stage is expected to be a useful tool during the assembly process of guideways.

Case of assembly process review and improvement for mega-diameter slurry shield TBM through the launching area (발진부지를 이용한 초대구경 이수식 쉴드TBM 조립공정 검토 및 개선 사례)

  • Park, Jinsoo;Jun, Samsu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.637-658
    • /
    • 2022
  • TBM tunnel is simple with the iterative process of excavating the ground, building a segment ring-build, and backfilling. Drill & Blast, a conventional tunnel construction method, is more complicated than the TBM tunnel and has some restrictions because it repeats the inspection, drilling, charging, blasting, ventilation, muck treatment, and installation of support materials. However, the preparation work for excavation requires time and cost based on a very detailed plan compared to Drill & Blasting, which reinforces the ground and forms a tunnel after the formation of tunnel portal. This is because the TBM equipment for excavating the target ground determines the success or failure of the construction. If the TBM, an expensive order-made equipment, is incorrectly configured at the assembly stage, it becomes difficult to excavate from the initial stage as well as the main excavation stage. When the assembled shield TBM equipment is dismantled again, and a situation of re-assembly occurs, it is difficult throughout the construction period due to economic loss as well as time. Therefore, in this study, the layout and plan of the site and the assembly process for each major part of the TBM equipment were reviewed for the assembly of slurry shield TBM to construct the largest diameter road tunnel in domestic passing through the Han River and minimized interference with other processes and the efficiency of cutter head assembly and transport were analyzed and improved to suit the site conditions.

Faultproof Design in Space for Monopropellant Rocket Engine Assembly (단일추진제 로켓 엔진 어셈블리를 위한 우주 공간에서의 과실 방지 설계)

  • Han, Cho-Young;Kim, Jeong-Soo
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.27 no.10
    • /
    • pp.1377-1384
    • /
    • 2003
  • An analysis has been performed for active thermal control of the KOMPSAT monopropellant rocket engine assembly, i.e., dual thruster module(DTM). The main efforts of this work have been directed at determining proper heater sizes for propellant valves and catalyst beds necessary to maintain their temperatures within specified temperature ranges under KOMPSAT environment and operational conditions. The TAS incorporated with TRASYS thermal radiation analyzer was used to establish a complete heat transfer model which allows to predict the DTM temperature as a function of time. The thermal analysis has been performed in transient mode to verify the appropriate power for catalyst bed heaters necessary to increase catalyst bed temperature to the required value within a specified period of time. Similar analysis has been executed to validate the heater power for the thermostatically controlled primary and redundant heater circuits used to prevent hydrazine freezing, i.e., single fault. Moreover the effect of the radiative property of thermal control coating of heat shield was examined. Thruster firing condition was also simulated for the heat soakback condition. As a consequence, all thermal analysis results for DTM satisfactorily met the thermal requirements for the KOMPSAT DTM under the worst case average voltage, i.e. 25 volt.

The Evaluation of Workload on Lower Limbs Muscles in Imbalanced Lower Limbs Postures Using EMG for Preventing WMSDs (근골격계 질환 예방을 위한 하지의 불균형 작업자세에서 근전도를 이용한 하지 근육의 작업부하 평가)

  • Hong, Chang-Woo;Kim, Yu-Chang
    • Journal of the Ergonomics Society of Korea
    • /
    • v.28 no.3
    • /
    • pp.81-85
    • /
    • 2009
  • Work related musculoskeletal disorders(WMSDs) was a leading cause of sick leave and injuries in the industries of our country. Posture was an important consideration in the design of work method and workplaces, because it affected the ability of workers to use various equipments and influenced how long they could perform their job without feeling discomfort, fatigue, and musculoskeletal disorders. Imbalanced lower limb postures such as a squatting posture were awkward working postures common to the shipbuilding shops, farms, automobiles assembly lines in our country. Different awkward working postures were known to be associated with specific musculoskeletal disorders. Eight postures in lower limb postures divided into balanced and imbalanced postures were evaluated by electromyographic(EMG) activity for lower limb muscles. Twelve male subjects participated in this study. This paper was to analyze the effects of lower limb muscles workload according to lower limb postures(knee angle) and working time. The ANOVA results showed that most EMG root mean square(RMS) values were statistically significant effect according to lower limb postures(knee angle) and working time. Therefore, the results of this study will provide the basis to evaluate workload of lower limb postures correctly adopted by workers in various jobs and the ergonomic reference to prevent WMSDs.

A Study on the Necessity of Smart Factory Application in Electronic Components Assembly Process (전자부품 조립공정에서 스마트팩토리 적용 필요성에 대한 연구)

  • Kim, Tae-Jong;Lee, Dong-Yoon
    • Journal of Convergence for Information Technology
    • /
    • v.11 no.9
    • /
    • pp.138-144
    • /
    • 2021
  • In the electronic component assembly business, when product defects occur, it is important to track incoming raw material defects or work defects, and it is important to improve suppliers or work sites according to the results. The core task of the smart factory is to build an integrated data hub to process storage, management, and analysis in real time, and to manage cluster processes, energy, environment, and safety. In order to improve reliability through accurate analysis and collection of production data by real-time monitoring of production site management for electronic parts-related small and medium-sized enterprises (SMEs), the establishment of a smart factory is essential. This paper was developed to be utilized in the construction by defining the system configuration method, smart factory-related technology and application cases, considering the characteristics of SMEs related to electronic components that want to introduce a smart factory.

Security Problem of National Major Facility's Parking Lot and its Improvement Method -Focused on Doonchi(Waterside) Parking Lot of National (국가중요시설의 주차장 보안의 문제점과 개선방안: 국회둔치주차장을 중심으로)

  • Lee, Sang-Hun;Lee, Sang-Yeol
    • Korean Security Journal
    • /
    • no.50
    • /
    • pp.61-87
    • /
    • 2017
  • National Assembly is a constitutional institution that is required to first consult the will of the people and it should do its effort continuously so that security of citizens using parking lot would be enhanced at the same time while improving parking service in order to increase customer satisfaction of the people. Under this recognition, in this study, Doonchi parking lot of National Assembly under consigned management was first reviewed in a perspective of criminal prevention through environmental design(CPTED) and particularly, fence installation and reinforcement work for securing 'territoriality' and operation of all round shooting camera and installation of No-trespassing warning board at entrance were suggested. Second, it was recommended to change independent control system in which CCTV security system of National Assembly Doonchi parking lot is operated separately from National Assembly safety situation room and integrate it with National Assembly safety situation room(revised to double safety system) and performance of CCTV camera was made to be increased to over 2m. In addition, video recording mode was converted to NVR mode for application to IP camera in the future and in order to avoid dead zone of security monitoring area and based on site inspection result, addition 3 places of newly installing CCTV were indicated. Third, it was recommended to introduce parking fare billing and management system through unmanned equipment in parking lot management and operation.(specialized management of professional parking service provider was reviewed). By doing so, risk of cash handling by charging personnel was removed by reducing current 7 working personnel to 3 and particularly, by converting parking lot management mode being operated temporarily from 9 A.M. to 9 P.M. at present to 24 hours operation mode and providing more specialized parking service, citizens visiting National Assembly were provided with convenience and image of National Assembly was also enhanced. This study was carried out in parallel with various literature and case studies, including data from the Office of the Defense Protection in the National Assembly.

  • PDF