• Title/Summary/Keyword: Assembly Work

Search Result 517, Processing Time 0.036 seconds

Material Properties Depending on the Maximum Aggregate Size and Fineness Modulus for Concrete Repair Materials (콘크리트 단면복구용 보수재료의 굵은 골재 최대치수 및 조립률에 따른 재료적 특성)

  • Sun-Mok Lee;Byung-Je Lee;Yun-Yong Kim
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.6
    • /
    • pp.62-69
    • /
    • 2023
  • Re-damage is frequently occurring for various reasons, including material factors, external factors, and factors caused by poor construction in concrete cross-section restoration work, so it is necessary to identify the cause and improve it. Cement-based materials are the most commonly used maintenance materials for concrete structures, and in particular, additional cross-sectional restoration work may be carried out due to re-damage such as cracks and excitement due to dry contraction of the repair material. In this study, a basic study was conducted to identify the characteristics of concrete while diversifying the maximum dimensions and assembly rate of thick aggregates to examine the effects of using thick aggregates in repair materials. As a result, the slump of concrete increased as the maximum size of thick aggregates increased, and the amount of air content was measured 1.88 to 2.35 times higher in the mixing using aggregates with a maximum aggregate size of 5 mm or more compared to the mixing group with a maximum aggregate size of 10 mm or more. It was found that compressive strength was greatly affected by the performance rate of thick aggregates. The compressive strength was measured the highest in the mixture using thick aggregates with the highest performance rate of 20 mm, and the compressive strength of the mixture with the lowest performance rate was more than 45%. As a result of the dry shrinkage measurement, the dry shrinkage was the lowest as the performance rate of the thick aggregate increased according to the change in the maximum dimensions and assembly rate of the thick aggregate, and the lowest performance rate was the largest in the mix. Through this study, it was confirmed that adjusting the particle size by diversifying the maximum dimensions and assembly rate of thick aggregates used in concrete structure repair materials can improve strength and workability and reduce dry shrinkage.

The Relative Effects of the Feedback Delivery Method(Face-to-Face vs. e-mail) and Reinforcement History on Quality Control Work Performance (피드백 제공방식과 강화 경험이 품질관리 수행에 미치는 효과)

  • Chae, Song-Hwa;Oah, She-Zeen
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.9
    • /
    • pp.117-126
    • /
    • 2016
  • This study examined the relative effects of different feedback delivery method (face-to-face vs. e-mail) and reinforcement history on work performance. Participants were asked to work on a simulated mobile phone assembly task. They performed for 30 minutes per session and attended 4 sessions. The dependents variable was the percentage of correctly completed work tasks. Of 100 participants recruited, 50 had a reinforcement history and another 50 had no reinforcement history with the feedback provider in this study. The participants in each group were randomly assigned into two experimental conditions: face-to-face feedback and e-mail feedback. The results showed that for the participants who had reinforcement history, the two feedback delivery methods did not produce a significant difference in the percentage of correctly completed work tasks. However, for those who had no reinforcement history, the two feedback methods did produce a significant difference.

A Study on the Implementation of Coexistent Reality Technology for Ship Outfitting Inspection (선박 의장 검사를 위한 공존현실 기술 적용에 관한 연구)

  • Ha, Yeon-Chul;Kim, Jin-Woo;Kim, Goo;Shin, Hyun-Shil
    • Journal of the Institute of Convergence Signal Processing
    • /
    • v.21 no.1
    • /
    • pp.13-20
    • /
    • 2020
  • In shipyards, internal materials are assembled after designing and manufacturing each ship's block. Internal material assembly means the installation of parts and equipment except ship's body. In this process, if the assembly of pipes and equipment existing in the block is not done correctly during the assembly between blocks, this causes a lot of costs. In addition, even if the assembly of the internal materials already completed, the production efficiency of the ship is reduced due to rework when problems such as space arrangement of the internal materials occurs. Therefore, this study introduces space arrangement and inspection system before and after hull outfitting work based on coexistence reality technology using 3D design drawing to solve these problems. The various coexistence reality algorithms and inspection systems developed and introduced in this study are based on AR service, which has never been introduced in Korea. So it will be widely applicable to various manufacturing industries using design drawings such as automobiles and architectures as well as ship building process.

An Ergonomic Study on Manual Lifting Tasks in Motor Assembly Processes (자동차 조립 부서 Manual Lifting 작업에 관한 인간공학적 연구)

  • Kwon, Eun-Hye;Paik, Nam-Won
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.8 no.1
    • /
    • pp.1-23
    • /
    • 1998
  • Work-related Low Back Pain(LBP) is one of tile most important Issues in the field of industrial safety and health. Particularly, manual lifting is known as a major cause of work-related LBP and impairment. Total number of 163 manual lifting tasks in motor assembly processes were investigated. The 1981 and the 1994 equations developed by National Institute for Occupational Safety and Health(NIOSH) were applied to evaluate potential hazards of lifting-related LBP. Comparisons between the 19R I and 1994 NIOSH criteria were made. The relationships between the NIOSH criteria and lifting-related LBP were also analyzed. The results of this study are as follows: 1. The values of Action Limit(AL) by the NIOSH 1981 lifting equation. Recommended Weight Limit(RWL) by the 1994 equation and the weight of the load handled at each manual lifting task were shown log-normal distributions. 2. LI'(the weight of tile load/AL) and LI(the weight of the load/RWL) were calculated estimate the physical stress imposed by each individual lifting task. As a result. 76.7% of the total LI' value exceeded 1 and 12.9% exceeded 3, and 84.7% of the total LI values exceeded 1 and 20.9% exceeded 3. 3. Bus 2 Department showed the highest rate of LI'>1 and LI>1 and Bus 1 Department showed the highest rate of LI'>3 and LI>3 4. In general, the RWLs by the 1994 equation were found lower than the ALs by the 1981 equation. It is assumed to he resulted from the fact that the 1994 equation includes methods evaluating asymmetrical lifting tasks and lifts of objects with less then optimal hand-container couplings, and also covers a larger range of work durations and lifting frequencies than the 1981 equation. 5. Significant correlations were found between LI' and incidence of LBP (R=0.734, p<0.05). LI and incidence of LBP(R=0.671. p<0.10) and load-weights and incidence of LBP(R=0.797, p<0.05). 6. Control measures are required to achieve the value of LI less than 1 for some tasks having high LI values. Engineering control is highly recommended for some tasks having the value of LI above 3.

  • PDF

A Study on the Total, Particle Size-Selective Mass Concentration of Airborne Manganese, and Blood Manganese Concentration of Welders in a Shipbuilding Yard (조선업 용접작업자의 공기 중 총 망간 및 입경별 망간 농도와 혈중 망간농도에 관한 연구)

  • Park, Jong Su;Kim, Pan Gyi;Jeong, Jee Yeon
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.25 no.4
    • /
    • pp.472-481
    • /
    • 2015
  • Objectives: Welding is a major task in shipbuilding yards that generates welding fumes. A significant amount of welding in shipbuilding yards is done on steel. Inevitably, manganese is present in the base metals being joined and the filler wire being used and, consequently, in the fumes to which workers are exposed. The objective of this work was to characterize manganese exposure associated with work area, total and particle size-selective mass concentration, and compare the mass concentrations obtained using a three-piece cassette sampler, size-selective impactor sampler and blood manganese concentrations. Materials: All samples were collected from the main work areas at one shipbuilding yard. We used a three piece cassette sampler and the eight stage cascade impactor sampler for the airborne manganese mass concentration of total and all size fractions, respectively. In addition, we used the results of health examination of workers sampled for airborne manganese. Results: The oder of high concentration of airborne manganese in shipbuilding processes was as follows; block assembly, block erection, outfitting installation, steel cutting, and outfitting preparation. The percentages of samples that exceeded the OES of the ministry of employment and labor by the cassette sampling method was 12.5%, however 59.1% of sampled workers by the impactor sampling method exceeded the TLV of the ACGIH. Conclusions: Even though the manganese concentrations in blood of workers exposed to higher airborne manganese concentration were higher than among those exposed to lower concentrations, there was no difference in blood manganese concentrations among work duration. The data analyzed here by characterizing size-selective mass concentrations indicates that the inhaled manganese of welders in shipbuilding yards could be mostly manganese-containing respirable particle sizes.

A Study on the Productive Capacity Setting of Women's Jacket (여성 재킷의 생산능력 설정을 위한 연구)

  • Kim, Jin-Sun;Shim, Kyu-Nam;Oh, Soon
    • Fashion & Textile Research Journal
    • /
    • v.13 no.2
    • /
    • pp.269-278
    • /
    • 2011
  • This study aims at setting up productive capacity which can be usefully utilized for work management of apparel manufacturers. So as to achieve this goal, an apparel manufacturing company which has been operated by miniline system in Seoul was selected. Standard time and man-hour were calculated to create the accurate productive capacity by observing and measuring a work flow included cutting, sewing and finishing processes. And the result is as following. The standard time for each process was presented as cutting process 47004.5s, sewing process 671050.5s and finishing process 22426.3s. And 15284.4ms was computed as total procession man-hour per day of the manufacturer which is organized of 16 people. Also, the procession man-hour for each process was revealed as cutting process 396.7ms(2.6%), sewing process 14509.3ms(94.9%) and finishing process 378.5ms(2.5%). +Surplus was found in the productivity for each process included the cutting process(outshell, lining and seam process), the sewing process(preparation and arrangement process) and the finishing process. But, additional man-hour 52436.18ms was required because the productive capacity was calculated as -surplus(-13.9%) in the sewing process(part and assembly process). Therefore, a work schedule was planned based on the previous result. However, loading can be ideal when a capacity and a load become '0'. The object company should find the way to reduce allowance(26.25%) of the sewing process through reconstruction of consciousness and improvement in functions with analyzing works of operators. Also, they need to consider an additional supplement of the personnel.

Determining the Degree of Disability in Workers with Upper Limb Musculoskeletal Disorders using DASH (DASH로 평가한 상지 근골격계 질환자의 기능 제한)

  • Kim, Kyoo-Sang;Jang, Ki-Un
    • Journal of the Ergonomics Society of Korea
    • /
    • v.29 no.3
    • /
    • pp.311-320
    • /
    • 2010
  • This study aimed to examine the development and characteristics of the workers with upper limb musculoskeletal symptoms and disorders and to analyze the upper limb musculoskeletal symptoms and disorders for its relationship with the individual socio-demographic characteristics. This study investigated the effect on the limitations of physical activities using standardized surveillance tool and clinical diagnosis. Musculoskeletal symptoms and the limitations of physical activities were examined. The clinical diagnosis of musculoskeletal disorders were carried out by physical examination, radiological examination and electromyography-electroneuronography for 22 workers in kitchen hood assembly process and 50 workers in toggle process of leather product manufacturing. The proportion of workers with musculoskeletal disorders was higher and the DASH score was also statistically higher in female and aged workers with longer working hours, longer household working hours, less leisure/hobby activity and higher physical load. Physical activities component score increased in the following order: workers in normal health, workers with musculoskeletal symptoms, and workers with musculoskeletal disorders as clinically diagnosed. Score for each DASH component increased in the following order: sports/performing arts ability, social activities, specific physical functional activities, work or other regular daily activities, work ability, psychological activities, insomnia and upper limb symptoms. The overall and each component DASH scores were higher in workers with symptoms of status praesens and of more severity, and receiving medical intervention. Musculoskeletal symptoms and disorders are associated with individual socio-demographic characteristics, and DASH score for physical activities of upper limb was higher in workers with musculoskeletal disorders. Musculoskeletal symptoms and disorders have a remarkable epidemiological significance for physical activities, social activities, work or other regular daily activities, upper limb symptoms and insomnia, where work ability, sports/performing arts ability and preventive measure is needed.

A integrated study on the current status and improvement direction of physician assistant (전담간호사 제도 개선방안에 대한 통합적 연구)

  • Moon, Heakyung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.3
    • /
    • pp.159-165
    • /
    • 2020
  • This study was attempted to identify the status of the work of the PA and provide the direction and evidence of policy making on the PA scheme. A convergence study was conducted to analyze a total of 23 articles of papers and Internet news through systematic review methodology. A literature search was performed using KISS, NDSL, RISS, National assembly library, and 11 major domestic daily newspapers and Youth Medical Newspaper. The analysis of eight papers showed that the PA's work-related exhaustion, job stress, unclear scope of work and lack of regulations reduced job satisfaction. Through 15 press articles, it was understood that it was urgent to establish a legal system and education system for qualifications and work as professional medical personnel amid a conflict of positive and negative opinions of related agencies. In order to increase the utilization of PA in the future, it is necessary to secure institutional devices suitable for Korean affairs and prepare educational programs.

A New Worker Policy for Self-Balancing Production Line with Stations

  • Hirotani, Daisuke;Morikawa, Katsumi;Takahashi, Katsuhiko
    • Industrial Engineering and Management Systems
    • /
    • v.10 no.3
    • /
    • pp.197-202
    • /
    • 2011
  • In traditional production lines, such as assembly lines, each worker is usually assigned to a particular fixed work, and decreasing the task to master the assigned work is valuated. However, when an imbalance exists between workers' speeds, if a worker delays the overall work in the production line, the production rate of the particular line will also decrease. To avoid this problem, the "Self-Balancing Production Line" was introduced. In this type of production line, each worker is assigned work dynamically, and when specific conditions are satisfied, production remains balanced. Characteristics of these lines that can be preempted at any place have already been analyzed by some researchers. A previous paper examined the situation in which only a single worker can process one machine and cannot preempt processing, and the improved policy of an ordinary selfbalancing production line, which specifies which stations workers can process and how workers can behave. This policy achieveda high production rate with only four stations and two workers (Buzacott, 2002). In that paper, worker processing stations and the behavior of a specific worker were limited, andthe paper focused only on specific stations and workers. Therefore, it is not applicable to any worker sequence. In this paper, we focus on other ways to decrease cycle time. In this kind of line, a worker processes at his or her speed. Therefore, if a worker is assigned stations according to his or her speed, the line can decrease cycle time. To do so, we relax the assumptions of this type of line and set a new condition. Under these conditions, we compare our results to the results of previous papers.

Establishing Methodology for Simulation-based Ship Design and Construction Using Virtual Manufacturing Technologies (가상생산기술을 이용한 시뮬레이션 기반의 선박설계 및 생산체계의 수립)

  • Kim, Hong-Tae;Lee, Jong-Gap;Hwang, Kyu-Ok;Jang, Dong-Sik
    • IE interfaces
    • /
    • v.15 no.3
    • /
    • pp.230-240
    • /
    • 2002
  • Information technologies centered on the internet in the area of shipbuilding and marine engineering further incur the needs to increase the flexibility of the organization, the dispersion of work process, and the use of out sourcing, as well as the globalization of related market. In near future, electronic commerce and concurrent engineering based on CALS/EC and the Internet will be an integral part of the environment and upon these changes, ship design and construction will become a computer supported cooperative work of many dispersed and specialized groups. As the means of active response to these environmental changes, many new concepts such as digital shipbuilding, virtual shipyard, and simulation based design are appearing. In this paper, the concept and current status of digital manufacturing in general manufacturing industry will be reviewed. Then, related technologies, area of application and methods of digital manufacturing in shipbuilding and marine industries are presented. In addition, virtual assembly simulation system for shipbuilding(VASSS), a tool for crane operability and block erection simulation in virtual dock based on 3D product model, will be introduced.