• 제목/요약/키워드: Artificial Fault Generator

검색결과 16건 처리시간 0.022초

배전 실증시험장 시스템 현황 소개 (Introduction of the field - test evaluation system in KEPCO)

  • 김동명;최선규;장상옥;오재형
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2004년도 춘계학술대회 논문집
    • /
    • pp.81-85
    • /
    • 2004
  • This paper describes the testing facility to demonstrate the performance of the distribution class circuit breakers and switchgears and the testing methods. The field-test evaluation system consists of two parts. One is the distribution system for simulation of the condition on interruption mode of switches which are installed in the system and tested by the AFG(Artificial Fault Generator) and the thunderbolt generator just like in the real field. The other is a laboratory for confirmation or the important characteristics regarding to the insulation, gas, environment durability of equipment. For the fatal failure mode, a FMEA(Failure Modes and Effects Analysis) technique which is a kind of a structural analysis to consider a counter-plan was emploved.

  • PDF

22.9kV 지중선로용 한류기 한전 실계통 시범적용 (Application of Fault Current Limiter in 22.9kV KEPCO power distribution line)

  • 김민지;박경원;안길영;김영근
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2015년도 제46회 하계학술대회
    • /
    • pp.1034-1035
    • /
    • 2015
  • Watertight 25.8 kV/600 A/12.5 kA fault current limiters (FCLs) have successfully installed in five areas (Incheon, Seoul, Gyeong-gi, Daejeon, Suwon) on KEPCO power distribution line for the purpose of commercial demonstrations. The fault current limiting operation of this FCL, which includes functions of sensing, commutation, and reduction of fault currents, is perfectly completed within 1 cycle immediately after fault occurs. The performance of FCL was verified by short circuit test, impedance test, insulation test, temperature-rise test, and control test, etc at PT&T in LS industrial systems, which is the official certification institute in Korea. In 2013, and also the FCL field test was performed in order to test the protection coordination between conventional relays and FCL, on the 1.5 kA and 5.0 kA faults, which were made by connecting the Artificial Fault Generator (AFG) to the distribution line in test grid at KEPCO Power Testing Center. The next step of this project is to check the FCL conditions caused by real external environment, and acquire the various data from five regions installed with FCL. In this paper, we intend to explain the FCL specifications and performance characteristics, and check the expected effect by application of FCL to power distribution line based on the power system analysis of an application site.

  • PDF

배전 실증시험장에서의 배전자동화 실증시험 결과 (The result on field test of distribution automation in distribution test center)

  • 하복남;윤태상;정영호;조남훈;임성일;강문호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 A
    • /
    • pp.182-184
    • /
    • 2000
  • There are several facilities in Kochang distribution test center such as artificial fault generator(AFG), new distribution automation system(NDAS), communication networks (wireless and optic), lumped constant circuit, switches for distribution automation, overhead and underground distribution line. We have been field testing on remote control, data acquisition. remote metering, feeder automation and so on for distribution automation using those equipment.

  • PDF

신경회로망을 이용한 On-line 과도안정도 평가에 의한 자동재폐로 무전압 시간제어 연구 (A Study on the Auto-Reclose Dead lime Control using Neural Network based On-line Transient Stability Assessment)

  • 김일동;박종근
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1995년도 추계학술대회 논문집 학회본부
    • /
    • pp.131-136
    • /
    • 1995
  • This paper presents a functional ability improvement of auto-reclosing relay in the power transmission line protection. When the high speed auto-reclosing is successful, Auto-reclosing is practically valuable to improve the transient stability limit of a power system, but it is fail due to surviving fault, both electrical and mechanical stresses can result on the transformers and turbine-generator. It is true that the longer dead time of the reclosing relay gives the higher rate of successful reclosing, On the other hand, the power system does not always need high speed reclosing because of enough stability margin. This paper proposed "stability margin based dead time reclosing" in order to decrease not only the rate of unsuccessful reclosing, but the possibility of the harmful stress also. On-line transient stability assessment using artificial neural network, for implementing the proposed scheme, has studied and tested with resonable results.

  • PDF

고압전동기 모델 코일의 절연상태 분석 (Analysis of Insulation Condition in High Voltage Motor Model Coils)

  • 김희동;공태식;김병래
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 C
    • /
    • pp.1612-1614
    • /
    • 2003
  • 80pF capacitive couplers were connected to six 6.6kV motor model coil terminals. The voltage applied to the coils were 3.81kv, 4.76 kV and 6.6kV, respectively. These stator coils have various types of artificial insulation defects such as large voids, semi-conductive coating damage and strand insulation fault. Digital PD detector(PDD) and turbine generator analyzer(TGA) were used to measure PD activity. TGA summarizes each plot with two quantities such as the normalized quantity number(NQN) and the peak PD magnitude(Qm). The PD levels in PD were measured with a conventional digital PD detector. Most of the defect mechanism of large motor stator winding can be associated with PD patterns such as internal and slot discharges. PD patterns coincide with PDD and TGA. These instruments have an input bandwidth of 40-400kHz and 0.1-350MHz. Surge testing detects faults in inter-turn winding of high voltage motor model coils.

  • PDF

신경망 알고리즘을 이용한 화력발전 보일러 시스템 시뮬레이터 개발 (Development of Thermal Power Boiler System Simulator Using Neural Network Algorithm)

  • 이정훈
    • 한국시뮬레이션학회논문지
    • /
    • 제29권3호
    • /
    • pp.9-18
    • /
    • 2020
  • 대규모 화력 발전소 제어용 시뮬레이터 개발은 급수/증기 계통, 공기/연소가스 계통, 미분탄 계통 및 터빈/발전기 계통으로 구성되며, 기계적인 터빈/발전기를 제외하고 모든 계통에 대하여 모델링이 가능하다. 현재까지 화력발전의 일부 계통에 대한 신경망 시뮬레이터 개발에 대한 시도는 있었으나 전체 계통에 대한 시뮬레이터 개발은 완성된 적이 없다. 특히 모든 발전사의 핵심 기술 개발중 하나인 오토튜닝은 정확도가 높은 모든 계통에 대한 모델링이 완성되어야 이룰 수 있는 기술이다. 이에 본 논문은 신경망 알고리즘을 이용하여 시스템을 설계할 경우 가장 핵심인 입출력 관계에 대한 변수를 모든 계통에 대하여 정의하였다. 시뮬레이션을 수행한 결과 실제 보일러 계통의 95~99% 이상 정확도를 보임에 따라 본 시뮬레이터에 현장 PID 제어기를 결합할 경우 고장진단이나 오토튜닝에 활용 가능할 것이다.