• Title/Summary/Keyword: Application schedule

Search Result 398, Processing Time 0.036 seconds

Application of New Load Management System Package for Development of the Optimal Electricity Consumption Strategy (최적의 부하소비전략 수립을 위한 새로운 부하관리시스템 패키지 응용에 관한 연구)

  • Chung, Koo-Hyung;Kim, Jin-Ho;Kim, Bal-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.602-605
    • /
    • 2003
  • This paper describes the consumer's decision-making process fur own optimal electricity consumption schedule and strategy using new load management system (LMS). As a result, it is demonstrated that a consumer in competitive electricity market has the opportunities to reduce electric payment by use of this LMS.

  • PDF

A Study on the Depreciation by Dual Price in Korea (우리나라에서 쌍대가격에 의한 감가상각의 측정에 관한 연구)

  • 조진형
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.14 no.24
    • /
    • pp.15-21
    • /
    • 1991
  • Jones [11], [12]developed a measurement method of the economic depreciation by infinite-horizen linear program model. This paper models an economic depreciation schedule in constant price based on the infinite-horizen LP. And the appropriate application of the maintenance/operating cost, the discount rate, the taxation and the price fluctuation in the model was suggested.

  • PDF

Robust Scheduling based on Daily Activity Learning by using Markov Decision Process and Inverse Reinforcement Learning (강건한 스케줄링을 위한 마코프 의사결정 프로세스 추론 및 역강화 학습 기반 일상 행동 학습)

  • Lee, Sang-Woo;Kwak, Dong-Hyun;On, Kyoung-Woon;Heo, Yujung;Kang, Wooyoung;Cinarel, Ceyda;Zhang, Byoung-Tak
    • KIISE Transactions on Computing Practices
    • /
    • v.23 no.10
    • /
    • pp.599-604
    • /
    • 2017
  • A useful application of smart assistants is to predict and suggest users' daily behaviors the way real assistants do. Conventional methods to predict behavior have mainly used explicit schedule information logged by a user or extracted from e-mail or SNS data. However, gathering explicit information for smart assistants has limitations, and much of a user's routine behavior is not logged in the first place. In this paper, we suggest a novel approach that combines explicit schedule information with patterns of routine behavior. We propose using inference based on a Markov decision process and learning with a reward function based on inverse reinforcement learning. The results of our experiment shows that the proposed method outperforms comparable models on a life-log dataset collected over six weeks.

Semantics Aware Packet Scheduling for Optimal Quality Scalable Video Streaming (다계층 멀티미디어 스트리밍을 위한 의미기반 패킷 스케줄링)

  • Won, Yo-Jip;Jeon, Yeong-Gyun;Park, Dong-Ju;Jeong, Je-Chang
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.33 no.10
    • /
    • pp.722-733
    • /
    • 2006
  • In scalable streaming application, there are two important knobs to tune to effectively exploit the underlying network resource and to maximize the user perceivable quality of service(QoS): layer selection and packet scheduling. In this work, we propose Semantics Aware Packet Scheduling (SAPS) algorithm to address these issues. Using packet dependency graph, SAPS algorithm selects a layer to maximize QoS. We aim at minimizing distortion in selecting layers. In inter-frame coded video streaming, minimizing packet loss does not imply maximizing QoS. In determining the packet transmission schedule, we exploit the fact that significance of each packet loss is different dependent upon its frame type and the position within group of picture(GOP). In SAPS algorithm, each packet is assigned a weight called QoS Impact Factor Transmission schedule is derived based upon weighted smoothing. In simulation experiment, we observed that QOS actually improves when packet loss becomes worse. The simulation results show that the SAPS not only maximizes user perceivable QoS but also minimizes resource requirements.

Mixed Operation with Express Train for Urban Railways in Seoul Metropolitan Area (대피선 설치를 통한 수도권 광역철도 급행화 방안)

  • Son, Gi-Min
    • Journal of Korean Society of Transportation
    • /
    • v.25 no.5
    • /
    • pp.195-207
    • /
    • 2007
  • The urban railways connecting between the inner city and suburb of Seoul metropolitan area, has lost the competitiveness against cars because too many stops deteriorated operating speed and passenger's level of service. This paper suggests that an express train should be introduced into the urban railway system in order to sort out such a complication. There are two considerations in the present study. Firstly, train schedule problem should be taken into account. In this regard, a new model for urban railway system was developed by revising the existing models dealing with single line freight railway. Approximate branch and bound algorithm based on conflict group rather than a single conflict was adopted. Consequently, it was found that the time saving in calculating the optimal schedule is the most meaningful contribution of the algorithm. The second consideration is associated with the application of the model. A case study was carried out using the actual operation data from Ansan line. In conclusion, the operation speed of the line can increase considerably with minimal number of new sidings.

A Case Study on Application of Dispatching Rule-Based Advanced Planning and Scheduling (APS) System (디스패칭 룰 기반의 Advanced Planning and Scheduling (APS) 시스템 활용 사례연구)

  • Lee, Jae-yong;Shin, Moonsoo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.3
    • /
    • pp.78-86
    • /
    • 2015
  • Up-to-date business environment for manufacturers is very complex and rapidly changing. In other words, companies are facing a variety of changes, such as diversifying customer requirements, shortening product life cycles, and switching to small quantity batch production. In this situation, the companies are introducing the concept of JIT (just-in-time) to solve the problem of on-time production and on-time delivery for survival. Though many companies have introduced ERP (enterprise resource planning) systems and MRP (material requirement planning) systems, the performance of these systems seems to fall short of expectations. In this paper, the case study on introducing an APS (advanced planning and scheduling) system based on dispatching rules to a machining company and on finding a method to establish an efficient production schedule is presented. The case company has trouble creating an effective production plan and schedule, even though it is equipped with an MRP-based ERP system. The APS system is applied to CNC (computer numerical control) machines, which are key machines of the case company. The overall progress of this research is as follows. First, we collect and analyze the master data on individual products and processes of the case company in order to build a production scheduling model. Second, we perform a pre-allocation simulation based on dispatching rules in order to calculate the priority of each order. Third, we perform a set of production simulations applying the priority value in order to evaluate production lead time and tardiness of pre-defined dispatching rules. Finally, we select the optimal dispatching rule suitable for work situation of the case company. As a result, an improved production schedule leads to an increase in production and reduced production lead time.

Growth Hormone Therapy in PWS with Mobile Application-Living with PWS

  • Im, Minji
    • Journal of mucopolysaccharidosis and rare diseases
    • /
    • v.4 no.2
    • /
    • pp.42-44
    • /
    • 2018
  • Prader-Willi syndrome (PWS) is a multisystemic complex disorder characterized by hyperphagia and impaired satiety which lead to severe and early obesity. In infancy, hypotonia and poor suck are main problems, and a child goes through Failure-to-thrive. During childhood, clinical manifestations change to food seeking as well as excessive weight gain, short stature, developmental delay, cognitive disability and behavioral problems. Also, growth hormone insufficiency is frequent. Most patients receive the recombinant growth hormone (rGH) therapy that provides improvement in growth, body composition, and physical attributes. The clinical care guideline for rGH therapy in PWS had been noticed in 2013. The rGH therapy helps in body fat, lean body mass, height SDS and head circumference. Also, the rGH therapy helps motor function, psychomotor development and cognition and behavioral issues.In Samsung medical center, there are clinical care guidelines for rGH therapy in PWS and an useful application for the patients. 'Living with PWS', the name of an moblie application for PWS patients, was introduced in the lecture. The application revised to version 2. It was made more convenient to users than in version 1. It helps caregivers to schedule the rGH therapy and to monitor height and weight.

Development and Evaluation of Model-based Predictive Control Algorithm for Effluent $NH_4-N$ in $A^2/O$ Process ($A^2/O$ 공정의 유출수 $NH_4-N$에 대한 모델기반 예측 제어 알고리즘 개발 및 평가)

  • Woo, Dae-Joon;Kim, Hyo-Soo;Kim, Ye-Jin;Cha, Jae-Hwan;Choi, Soo-Jung;Kim, Min-Soo;Kim, Chang-Won
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.33 no.1
    • /
    • pp.25-31
    • /
    • 2011
  • In this study, model-based $NH_4-N$ predictive control algorithm by using influent pattern was developed and evaluated for effective control application in $A^2/O$ process. A pilot-scale $A^2/O$process at S wastewater treatment plant in B city was selected. The behaviors of organic, nitrogen and phosphorous in the biological reactors were described by using the modified ASM3+Bio-P model. A one-dimensional double exponential function model was selected for modeling of the secondary settlers. The effluent $NH_4-N$ concentration on the next day was predicted according to model-based simulation by using influent pattern. After the objective effluent quality and simulation result were compared, the optimal operational condition which able to meet the objective effluent quality was deduced through repetitive simulation. Next the effluent $NH_4-N$ control schedule was generated by using the optimal operational condition and this control schedule on the next day was applied in pilot-scale $A^2/O$ process. DO concentration in aerobic reactor in predictive control algorithm was selected as the manipulated variable. Without control case and with control case were compared to confirm the control applicability and the study of the applied $NH_4-N$control schedule in summer and winter was performed to confirm the seasonal effect. In this result, the effluent $NH_4-N$concentration without control case was exceeded the objective effluent quality. However the effluent $NH_4-N$ concentration with control case was not exceeded the objective effluent quality both summer and winter season. As compared in case of without predictive control algorithm, in case of application of predictive control algorithm, the RPM of air blower was increased about 9.1%, however the effluent $NH_4-N$ concentration was decreased about 45.2%. Therefore it was concluded that the developed predictive control algorithm to the effluent $NH_4-N$ in this study was properly applied in a full-scale wastewater treatment process and was more efficient in aspect to stable effluent.

Development and Application of TACT Management System (TACT 공정관리 시스템 개발 및 적용 사례)

  • Suh Sang-Wook;Kim Jae-Ho;Kim Sun-Kuk;Kim Chang-Duk;Lee Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.145-154
    • /
    • 2003
  • The change in environment of construction industry and the advancement of information technology require the improvement of construction project efficiency. However, construction industry still lacks performance-measuring tools that are the requirements of efficient project management system. In case of the schedule management system, schedule is usually being managed by result-oriented measurements such as completion time, spent cost, and progress rate, which are not good enough to control the overall continuity of work-flow. This research aimed to systemize the overall construction process and to develop the indicators for measuring performance of TACT activities during finishing work period that can contribute to the systemization of TACT management.

A K Least Time Paths Searching Algorithm for Time Dependent Intermodal Transportation Networks with Departure Time Schedule Constraints (출발시간제약이 존재하는 동적 복합교통망의 K최소시간경로탐색)

  • Jo, Jong-Seok;Sin, Seong-Il;Mun, Byeong-Seop;Im, Gang-Won
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.3 s.89
    • /
    • pp.167-176
    • /
    • 2006
  • An minimum path algorithm for integrated networks with departure time constraints require considering arrival time of arriving mode, transfer time. waiting time, and departure time of next mode. Integrated network with diverse modes commonly include departure time constraints. Because public mode suck as train and airplane have fixed service schedule which provide passengers. This study developed the k-path algorithm in integrated network with time varying conditions and departure time constraints. We proposed the extended method based on entire path deletion method, and examined the application of the proposed algorithm through case study.