• Title/Summary/Keyword: Analytic Hierarchy Analysis

Search Result 879, Processing Time 0.032 seconds

The Risk Evaluation of Ground Subsidence based on GIS Analysis Method (GIS 분석기법을 활용한 지반침하 위험도 평가)

  • Choi, Byoung Il;Kim, Jong Hoon;Park, Won Joo;Choi, Chang Ho;Kim, Jin Young
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.6
    • /
    • pp.104-109
    • /
    • 2017
  • As the ground subsidence occurred at the center of Seoul area in 2014, the ground subsidence phenomenon was emerged as a social issue in Korea. Even so far, national and local governments and related experts have been making a lot of efforts to prevent ground subsidence phenomenon, but it is still happening all over the country. In this study, we chose 9 influence factors on which ground subsidence and derived weights using AHP(Analytic Hierarchy Process) method for ground subsidence risk analysis. And we analyze the risk of subsidence in ${\bigcirc}{\bigcirc}$city using GIS(Geographic Information System) analysis method and evaluate the potential risk.

Risk Level Analysis of Architectural Work using AHP (AHP를 이용한 건축건설공사 공종별 위험도 분석)

  • Kim, Jeongmin;Lee, Jong-Bin;Chang, Seong Rok
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.5
    • /
    • pp.96-102
    • /
    • 2017
  • The highest fatal accident ratio was recorded in the construction industry. According to the industrial insurance premium rate & business type example, among the construction industry, the architectural work has the highest fatal and loss time accident ratio. Previous literature has investigated various aspects of accident occurrence and prevention in architectural work. However, those studied were limited in that they only focused on the fatal accident without considering the loss time accident. But non fatal accidents were recorded more than 50 times of fatal accidents. Therefore non fatal accidents must be controlled to lessen industrial accidents. Based on this, the goal of this study was to investigate the nature of the loss time accident and derive the risk index of work type in architectural work. In this study, opinions of safety experts were gathered and the risk index of work type was derived using AHP(Analytic Hierarchy Process). And verification was accomplished by comparing the results of this study with the risk index derived by analysis of accident records. Results showed that the risk index of work type was significantly higher in steel frame work, temporary installation work, earth & foundation work, facilities work, concrete work. And statistical analysis for verification showed that coefficient of Pearson correlation was 0.686 and P-value was 0.001.

The Relative Importance and Priority of Game Contents Industry Policy (게임콘텐츠산업정책의 우선순위에 대한 연구)

  • Jeon, Gyongran
    • Journal of Korea Game Society
    • /
    • v.19 no.2
    • /
    • pp.55-66
    • /
    • 2019
  • This research studied how game contents related experts recognize the transition of contents industries in intellectual information era. This study also studied experts' priorities of evaluation elements in contents industry policies. For this, Analytic Hierarchy Process was utilized to analyze the relative importance and priorities of evaluation elements in contents industry policies. According to the analysis, the order of priorities was 'strengthening content technology', 'training content experts', 'improving the contents-related system' and 'strengthening content usage and consumer safety'. Also, in complex importance analysis, 'strengthening R&D system for content' was gauge as the most important element. In the analysis about each related group's thinking, industries and policy institutes considered 'strengthening content technology' important and academia evaluated 'training content experts' as the most important one.

Analysis on Risk Factors of Reactor Containment Building Construction using Analytic Hierarchy Process (계층 분석 방법을 이용한 원자로 격납 건물 시공의 리스크 요인 분석)

  • Shin, Dae-Woong;Shin, Yoonseok;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.4
    • /
    • pp.425-431
    • /
    • 2015
  • Since the construction of Kori 1 was completed in 1978, the construction projects for nuclear power plant are increasingly expanded into domestic and foreign sites. However, some of construction sites of nuclear power plant have the problems of process delay and cost loss due to lack of ability of risk management. The construction of reactor containment building in nuclear power plant is especially dotted with many risk factors because it needs professional skills and large-scale resources due to long duration compared with different construction phase. Therefore, it needs the study that analyzes risk factors expected in construction of reactor containment building and suggests way of stable performance of projects. So, this study assesses risk factors of construction of reactor containment building. For the objectives, this study uses survey for group of minority specialists of 36 experts. The risks of 24 factors is classified by criterions of process, cost, safety, and quality and the results of assessment is analyzed by analytic hierarchy process. As the results, the importance and priority of risk factors classified by each criterion were calculated and the applicability of analytic hierarchy process was identified to analyze risk factors of nuclear power plant construction. These will be baseline data for risk management in construction phase of reactor containment building.

The Quantitative Analysis of Alternative-Decision in Missile Test: Focusing on Selecting a Foreign Test Site through Data Envelopment Analysis (미사일 시험을 위한 대안결정의 정량적 분석: 자료포락분석을 이용한 국외 시험장 선정을 중심으로)

  • Han, Seung Jo
    • Convergence Security Journal
    • /
    • v.20 no.4
    • /
    • pp.3-12
    • /
    • 2020
  • Although the related regulations or guidelines are not specified in the defense weapon system R&D process, R&D authorities frequently encounter problems that require rational decision-making. If the rational process is not applied in the matter of alternative choice, the project could be disrupted, which can result in longer project periods or more resource provision. In particular, a variety of decision-making methods are needed for test&evaluation of missile R&D. The issue of selecting a test site is one of the representative decision-making problems. If it is needed to determine the priority of multiple sites, Delphi Method and Analytic Hierarchy Process(AHP) will be applied. However, if the input of cost is to be considered, Data Envelopment Analysis(DEA) is more valuable to solve the problem. This paper proposes a solution to handle quantitatively various decision-making problems that can occur in missile flight test, and shows how DEA is applied through a simulated case study of selecting a foreign test site.

A Priority Analysis on E-Commerce Security Factors - Focused on Researchers and Practitioners (전자상거래를 위한 보안 항목 우선순위 분석: 연구자그룹과 실무자그룹을 중심으로)

  • Kim, Hyun-Woo
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.16 no.5
    • /
    • pp.163-171
    • /
    • 2011
  • In e-commerce environment, security should be considered as an essential factor for success. In this paper, we analyze security requirements for e-commerce system, and it is focused on the practical usage, not theoretical contribution, in the field of e-commerce security. To identify the security requirements being specific to e-commerce environment, the researches related to e-commerce security are surveyed and a phase of Delphi method and Analytic Hierarchy Process(AHP) are used to determine the relative importance of e-commerce security factors. Since researchers and practitioners can have significantly different views because of each different work environment, we divide the professionals into two respondents' group. This survey result can be useful security guidelines in the development of e-commerce service system from the initial system development step to the completion.

Analysis on Deduction of Energy-IT Convergence Technologies by the Analytic Hierarchy Process (AHP를 이용한 에너지-IT 융합기술 도출에 관한 연구)

  • Oh, Nam-Gul;Kim, Hoon
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.35 no.7B
    • /
    • pp.1091-1097
    • /
    • 2010
  • Energy and environment problem has been arisen and become one of the major concerns all over the world, due to scarce energy resources and inefficient energy consumption. Recently, energy-IT(EIT) convergence technology has been getting more attention, being expected to be one of key technologies to resolve the problem, and R&D projects on various areas of EIT convergence technologies have been launched in many countries on a large scale. Korea government and companies have also been interested in the development of EIT technologies, however, the scopes of technology areas are limited to just a small part such as smart grid technology. This paper investigates effectiveness of each EIT convergence technology and deduces EIT convergence technologies using AHP(Analytic Hierarchy Process). It is expected that our research could be meaningful information supporting policies on R&D projects of EIT convergence technologies promoted to save energy and strengthen the national competitiveness. Our research results show that the EIT convergence technology area of green building would be the most effective EIT convergence technology except smart grid, and network-based energy management system would be the most effective amongst the sub-areas of green building.

Priority Analysis of Factors for Activating 3D Contents lndustry Using AHP(Analytic Hierarchy Process) (계층적 분석 방법을 활용한 3D콘텐츠 활성화 요인 중요도 분석)

  • Lee, Chang-Hyung;Park, Chang-Mook;Kim, Kwang-Ho
    • Journal of Digital Contents Society
    • /
    • v.14 no.4
    • /
    • pp.401-410
    • /
    • 2013
  • A big success of the 3D film 'Avatar' in 2009 opened a full-fledged 3D movie era. A new industrial possibility of 3D contents was predicted in Korea and then the support for 3D contents production took placed via various media platforms. Korean government also announced the new development policies with a focus on 3D content. However, the 3D content industry has not been activated. Therefore, in this study by applying AHP(Analytic Hierarchy Process) method we tried to grasp the reason of the deactivation of 3D content industry through analyzing the relative importance rate of three research factors(content aspects, technical aspects, and policy aspects) that were mainly considered to activate the industry. The results of this study showed that the relative importance rate of content aspects was higher than that of technical aspects and policy aspects. It means the lack of 3D contents is one of main reason causing the delay of 3D industrial activation. And it also showed that the relief of human factors such as visual fatigue evaluated as a sub-factors of technical aspects are challenges to be solved soon..

Measurement of Severity of Hazards and Investment in Occupational Safety & Health According to Ship Types Using Analytic Hierarchy Process (AHP를 이용한 조선업 선종별 위험도 및 안전관리 수요 예산에 관한 연구)

  • Lee, Jong-Bin;Chang, Seong-Rok
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.1
    • /
    • pp.105-110
    • /
    • 2012
  • Although reinforcement of work intensity caused by the recent prosperity of shipbuilding businesses and the steady increasing of results which produces orders has difficulties with heavy workload, unique work circumstance in shipbuilding industry where main and subcontractor do the job together is not easy to manage its safety systematically. According to KOSHA(Korea Occupational Safety & Health Agency), there were 2, 587 deaths of 95,806 disaster victims a year on average for late 6 years(2003-2008), therein 36,605 disaster victims and 646 death in manufacture where shipbuilding have 2,287 victims, 6.25% of total disaster victims and 45 deaths, 6.97%. Moreover it shows much higher accident rate in shipbuilding industry in Korea than well developed countries in this industry as Japan, Singapore, Taiwan and so it does about 3 to 10 times higher in case of death. Compared to Japan with a shipbuilding competition of orders received system, 2 times and 2.3 times higher for each and it is more than 2 times higher than accident rate of all domestic industries. These increasing of disaster result in a labor-management dispute and it is necessary that more positive efforts and investments because there occurs blind spot, neglected industry safety and health management by lack of them, Therefore this study, for the effective safety and health management of shipbuilding industry, attempts to analyze risk on kinds of ships and budget needed in safety management through classifying ships that are being made recently by three dominate major companies. For this, we carried out a survey and interview targeting experts related to shipbuilding industry and used AHP(Analytic Hierarchy Process) for result analysis. It is considered that cost of safety and health management will be spent more effectively on the results about risk on kinds of ships and budget needed in safety management in the study and that this study can contribute to decreasing disasters in shipbuilding industry.

A Study on Priority of Policy for Smart Farming System Using AHP Approach (스마트 팜 보급 확대를 위한 정책수단의 우선순위 결정)

  • Suh, Dae-Seok;Kim, Yean-Jung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.11
    • /
    • pp.348-354
    • /
    • 2016
  • This study was conducted to investigate policy priority with respect to development of a smart farming system. Professors, researchers and policy makers in related fields were surveyed to develop a long-term plan and improved direction for the smart farming system, and the AHP (Analytic Hierarchy Process) was used for analysis. Overall, 61 experts in the frontiers of the field were surveyed and 42 questionnaires were analyzed. The results showed that the most important factors influencing development plans are increasing the income of farmers, minimizing management costs and standardizing and localizing smart farming systems. However, some plans differ with respect to economic and technology factors; therefore, those things should be analyzed in more detail by experts.