• 제목/요약/키워드: Analysis of Production Cost

검색결과 1,194건 처리시간 0.032초

Lean SCM에서의 모듈생산의 적용에 따른 모델개발과 원가분석 (The Development of Model and Cost Analysis to the Application of Modular Production System in Lean Supply Chain Management)

  • 김태호;양광모;권정휘;강경식
    • 대한안전경영과학회지
    • /
    • 제4권4호
    • /
    • pp.73-85
    • /
    • 2002
  • The supply chain not only includes the manufacturer and suppliers, but also transporters, warehouses, retailers, and customers themselves. Within each organization, such as manufacturer, the supply chain includes all functions involved in filling a customer request. these functions include, but are not limited to, new product development, marketing, operation, distribution, finance, and customer service. Lean Supply chain coordination improves if all supplier of chain take actions that together increase total supply chain profits. To design of Modularity by the grouping supplier, the proposed method is to develop the most appropriate production system models in the Supply Chain Management which is necessity of the times and its importance. The objects of this study is development of model and cost analysis to the modular production system in Lean SCM. Introduction of modular production system in Lean SCM is effective in reducing the cost in processing, manufacturing, inventory holding, ordering, etc.

Cost Analysis of the Structural Work of Green Frame

  • Joo, Jin-Kyu;Kim, Sun-Kuk;Lee, Goon-Jae;Lim, Chae-Yeon
    • 한국건축시공학회지
    • /
    • 제12권4호
    • /
    • pp.401-414
    • /
    • 2012
  • The adoption of Green Frame is expected to provide economic benefits, since construction costs are reduced by the in-situ production of precast concrete column and beam. The cost reduction can ultimately be realized by saving transportation costs and the overhead and profit of PC plants. The cost structure of Green Frame, which is built up using composite precast concrete members, is similar to that of a bearing-wall structure, but the difference in construction process has resulted in some cost differences for a few items. In particular, production and installation is the principal work involved in Green Frame made by precast concrete members, while form and concrete work is the principal work for a bearing-wall structure. As such, the rental time and fee for a tower crane should be compared through time analysis. To verify reliability, this study focused on developed residential projects to estimate the construction costs. Through this analysis, it was found that the costs of Green Frame were 1.57% lower than the costs of bearing-wall structure. The results of this study will help in the development of a management plan for the structural work of Green Frame.

염류집적 농경지 제염기술에 대한 경제성분석 - 작물생산량을 기준으로 (Economic Analysis on Desalination Technology for Saline Agricultural Land on the Basis of Crop Production)

  • 김도형;최정희;김이열;남창모;백기태
    • 한국지하수토양환경학회지:지하수토양환경
    • /
    • 제17권5호
    • /
    • pp.40-48
    • /
    • 2012
  • In this study, economic analysis of five desalination technologies for saline agricultural land was carried out. The analysis was comprehensively evaluated by calculating changes in crop production and benefit/cost (B/C) ratio. The analysis of crop production was in the order of tomato > cucumber > a (musk) melon > watermelon > cabbage, and economical efficiency for desalination technology was in the order of soil exchange > soil addition > electrokinetics > under-drainage > subsoil reversal. In cost benefit analysis, B/C ratio was in the order of under-drainage > soil exchange > electrokinetics > soil addition > subsoil reversal, and all desalination technologies used in this study have the ratio higher than 1, which means economical efficiency was high. Based on the net production considering B/C ratio, the general economic analysis was exactly order from that of crop production analysis. As a result, economical efficiency of soil exchange was highest, and economical efficiency of soil addition and electrokinetic was relatively higher than others.

Cost-Effectiveness of Converting Fish Waste into Liquid Fertilizer

  • Kim, Joong-Kyun
    • Fisheries and Aquatic Sciences
    • /
    • 제14권3호
    • /
    • pp.230-233
    • /
    • 2011
  • To determine the cost-effectiveness of converting fish waste into liquid fertilizer, this study analyzed the production of 3 L of liquid fertilizer from the fermentation of fish waste. The total product cost of the fertilizer was calculated to be $165.26 for a one-batch operation. If the seed culture was repeated five times, the total product cost could be reduced to $36.39/L. According to this analysis, the reutilization of fish waste as liquid fertilizer was not particularly economically attractive at present, and plant-scale production would be necessary for commercialization. This is the first cost-effectiveness analysis of the bioconversion of fish waste into liquid fertilizer.

태양전지를 이용한 국내 Window Type 광전기화학 수소생산의 경제성 평가 (Economic Evaluation of Domestic Window Type Photoelectrochemical Hydrogen Production Utilizing Solar Cells)

  • 김봉진;김종욱
    • 한국수소및신에너지학회논문집
    • /
    • 제21권6호
    • /
    • pp.595-603
    • /
    • 2010
  • This paper deals with an economic evaluation of domestic window type photoelectrochemical hydrogen production utilizing solar cells. We make some sensitivity analysis of hydrogen production prices by changing the values of input factors such as the initial capital cost, the solar to hydrogen conversion efficiency, and the system duration time. The hydrogen production price of the window type photoelectrochemical system was estimated as 1,168,972 won/$kgH_2$. It is expected that hydrogen production cost can be reduced to 47,601 won/$kgH_2$ if the solar to hydrogen conversion efficiency is increased to 14%, the system duration time is increased to 20,000 hours, and the initial capital cost is decreased to 25% of the current level. We also evaluate the hydrogen production cost of the water electrolysis using the electricity produced by solar cells. The corresponding hydrogen production cost was estimated as 37,838 won/$kgH_2$. The photoelectrochemical hydrogen production is evaluated as uneconomical at this time, and we need to enhance the solar to hydrogen conversion efficiency and the system duration time as well as to reduce prices of the system facilities.

적외선 검출기 개발가능성 및 대안 분석 연구 (A Study on Feasibility Analysis and Alternatives for Infrared Detector Development)

  • 김경수;민성기;김철환
    • 시스템엔지니어링워크숍
    • /
    • 통권4호
    • /
    • pp.123-134
    • /
    • 2004
  • This paper deals with the feasibility analysis and alternatives for infrared detector development. The purpose of this paper analyze development requirement and feasibility study in both technology and cost. We get raw input data for system engineering process from development and technical expert, and then analyze cost and technology for development feasibility, and alternative study. Infrared Detector is core component of Thermal Imaging System and developed by ADD from 2006 to 2008 year. Technical level is analyzed by TRL(Technical Readiness Level) and AOA(Analysis of Alternative) is done by development and production cost estimate. We use SEER-H tool for cost estimate, that is parametric cost estimate tool based on Knowledge Base. Also this paper presents risk analysis for project management because it is necessary to risk driver management during the infrared detector development. The result of IR Detector feasibility and alternative study will be used in technical and cost analysis. This study can help those who are related to the cost analysis and development feasibility of other weapons

  • PDF

비정형 콘크리트 부재 생산을 위한 요구조건 분석 (Requirements analysis for production of freeform concrete segments.)

  • 성수진;이동훈;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.68-69
    • /
    • 2014
  • Production of freeform concrete segments use various molds because of the unique shape of it unlike common concrete segments. As a result, the mold for freeform concrete segments cannot be reused. Therefor, cost overrun is occurred by needs of more time and manpower to produce the freeform concrete segments compared with common concrete segments. To prevent the cost overrun, a new production method for the freeform concrete segments is needed to develop and the requirements for it should be analyzed before. Therefor, the aim of this study is requirements analysis for production of freeform concrete segment. The requirements of production of freeform concrete segments and form for it is analyzed in this study. The result of this study would be used to suggest the new production method of freeform concrete segments.

  • PDF

유연한 셀생산을 위한 최적가공경로와 생산조건의 결정 (Optimization Analysis of Flexible Cellular Manufacturing: Route Selection and Determining the Optimal Production Conditions for Ordered Products)

  • 송상재;최정희
    • 대한산업공학회지
    • /
    • 제18권1호
    • /
    • pp.47-62
    • /
    • 1992
  • This paper describes a procedure for optimizing the route selection and production conditions in alternate process plans under a cellular manufacturing environment. The type of production is mainly production-to-order which deals with unexpected products as the changes factor. The flexible cellular manufacturing can be viewed as a complete unification of both flexible manufacturing process and flexible production management. The integrated problem for designing flexible cellular manufacturing associated with determining the optimal values of the machining speeds, overtime, and intercell flow is formulated as Nonlinear Mixed Integer Programming(NMIP) in order to minimize total production change cost. This is achieved by introducing the marginal cost analysis into the NMIP, which will compute the optimal machining speed, overtime, intercell flow, and routing. The application of this procedure offers greater flexibility to take advantage of the cellular manufacturing due to the optimum use of resources. A solution procedure for this problem was developed and a numerical example is included.

  • PDF

Integrated Simulation Modeling of Business, Maintenance and Production Systems for Concurrent Improvement of Lead Time, Cost and Production Rate

  • Paknafs, Bahman;Azadeh, Ali
    • Industrial Engineering and Management Systems
    • /
    • 제15권4호
    • /
    • pp.403-431
    • /
    • 2016
  • The objective of this study is to integrate the business, maintenance and production processes of a manufacturing system by incorporating errors. First, the required functions are estimated according to the historical data. The system activities are simulated by Visual SLAM software and the required outputs are obtained. Several outputs including lead times in different dimensions, total cost and production rates are computed through simulation. Finally, data envelopment analysis (DEA) is utilized in order to select the best option between the defined scenarios due to the multi-criteria feature of the problem. This is the first study in which the lead times, cost and production rates are simultaneously considered in the integrated system imposed of business, maintenance and production processes by incorporating errors. In the current study, the major bottlenecks of the system being studied are identified and suggested different strategies to improve the system and make the best decision.

철골 공장가공의 생산성 및 공장간접비율 실태분석 (Analysis of the Productivity and Indirect Cost Rates Estimation in the Steel Plant)

  • 김경원;안방률;태용호;허영기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.333-336
    • /
    • 2012
  • In modern Construction Industry, as accumulation of capital and improvement of technology skills, buildings are becoming higher and more enormous, also the portion of steel works has been increasing. In addition, it is necessary to predict the optimum level of construction cost in a reasonable way. The composition of construction is direct construction cost, indirect construction cost and so on. However, it is not enough to study about indirect construction cost rather than direct construction cost. In this study, the state of productivity and indirect construction cost are analyzed in the steel production. As a result, the productivity and ratio of indirect cost in steel plant by inserted per 1ton are suggested.

  • PDF