• Title/Summary/Keyword: Algorithms and Procedures

Search Result 242, Processing Time 0.029 seconds

A Decision Tree Algorithm using Genetic Programming

  • Park, Chongsun;Ko, Young Kyong
    • Communications for Statistical Applications and Methods
    • /
    • v.10 no.3
    • /
    • pp.845-857
    • /
    • 2003
  • We explore the use of genetic programming to evolve decision trees directly for classification problems with both discrete and continuous predictors. We demonstrate that the derived hypotheses of standard algorithms can substantially deviated from the optimum. This deviation is partly due to their top-down style procedures. The performance of the system is measured on a set of real and simulated data sets and compared with the performance of well-known algorithms like CHAID, CART, C5.0, and QUEST. Proposed algorithm seems to be effective in handling problems caused by top-down style procedures of existing algorithms.

Extension of Topological Improvement Procedures for Triangular Meshes (삼각격자에 대한 위상학적 개선과정의 확장)

  • Maeng, Ju-Seong;Han, Seok-Yeong;Choe, Hyeong-Il
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.25 no.6
    • /
    • pp.853-859
    • /
    • 2001
  • This paper describes the extended topological clean up procedures to improve the quality of unstructured triangular meshes. As a postprocessing step, topological improvement procedures are applied both for elements that are interior to the mesh and for elements connected to the boundary and then Laplacian-like smoothing is used by default. Previous clean up algorithms are limited to eliminate the nodes of degree 3,4,8,9,10 and pairs of nodes of degree 5. In this study, new clean up algorithms which minimize the triple connection structures combined with degree 5 and 7 (ie ; 5-7-5, 7-7-5, 7-5-7 etc) are added. The suggested algorithms are applied to two example meshes to demonstrate the effectiveness of the approach in improving element quality in a finite element mesh.

Design of Fuzzy Prediction System based on Dual Tuning using Enhanced Genetic Algorithms (강화된 유전알고리즘을 이용한 이중 동조 기반 퍼지 예측시스템 설계 및 응용)

  • Bang, Young-Keun;Lee, Chul-Heui
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.1
    • /
    • pp.184-191
    • /
    • 2010
  • Many researchers have been considering genetic algorithms to system optimization problems. Especially, real-coded genetic algorithms are very effective techniques because they are simpler in coding procedures than binary-coded genetic algorithms and can reduce extra works that increase the length of chromosome for wide search space. Thus, this paper presents a fuzzy system design technique to improve the performance of the fuzzy system. The proposed system consists of two procedures. The primary tuning procedure coarsely tunes fuzzy sets of the system using the k-means clustering algorithm of which the structure is very simple, and then the secondary tuning procedure finely tunes the fuzzy sets using enhanced real-coded genetic algorithms based on the primary procedure. In addition, this paper constructs multiple fuzzy systems using a data preprocessing procedure which is contrived for reflecting various characteristics of nonlinear data. Finally, the proposed fuzzy system is applied to the field of time series prediction and the effectiveness of the proposed techniques are verified by simulations of typical time series examples.

General Algorithms for Construction of Broadcast and Multicast Trees with Applications to Wireless Networks

  • Nguyen Gam D.
    • Journal of Communications and Networks
    • /
    • v.7 no.3
    • /
    • pp.263-277
    • /
    • 2005
  • In this paper, we introduce algorithms for constructing broadcasting and multicasting trees. These algorithms are general because they may be used for tree cost functions that are of arbitrary form. Thus, essentially the same algorithmic procedures are used for different tree cost functions. We evaluate the effectiveness of the general algorithms by applying them to different cost functions that are often used to model wired and wireless net­works. Besides providing a unifying framework for dealing with many present and future tree-construction applications, these algorithms typically outperform some existing algorithms that are specifically designed for energy-aware wireless networks. These general algorithms perform well at the expense of higher computational complexity. They are centralized algorithms, requiring the full network information for tree construction. Thus, we also present variations of these general algorithms to yield other algorithms that have lower complexity and distributed implementation.

Validation of Quality Control Algorithms for Temperature Data of the Republic of Korea (한국의 기온자료 품질관리 알고리즘의 검증)

  • Park, Changyong;Choi, Youngeun
    • Atmosphere
    • /
    • v.22 no.3
    • /
    • pp.299-307
    • /
    • 2012
  • This study is aimed to validate errors for detected suspicious temperature data using various quality control procedures for 61 weather stations in the Republic of Korea. The quality control algorithms for temperature data consist of four main procedures (high-low extreme check, internal consistency check, temporal outlier check, and spatial outlier check). Errors of detected suspicious temperature data are judged by examining temperature data of nearby stations, surface weather charts, hourly temperature data, daily precipitation, and daily maximum wind direction. The number of detected errors in internal consistency check and spatial outlier check showed 4 days (3 stations) and 7 days (5 stations), respectively. Effective and objective methods for validation errors through this study will help to reduce manpower and time for conduct of quality management for temperature data.

Algorithms for Production Planning and Scheduling in an Assembly System Operating on a Make-to-Order Basis (주문생산방식을 따르는 조립시스템에서의 생산계획 및 일정계획을 위한 알고리듬)

  • Park, Moon-Won;Kim, Yeong-Dae
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.24 no.3
    • /
    • pp.345-357
    • /
    • 1998
  • This paper focuses on production planning and scheduling problems in an assembly system operating on a make-to-order basis. Due dates are considered as constraints in the problems, that is, tardiness is not allowed. Since the planning problem is a higher-level decision making than the scheduling problem, the scheduling problem is solved using a production plan obtained by solving the planning problem. We suggest heuristic procedures in which aggregated information is used when the production planning problem is solved while more detailed information is used when the scheduling problem is solved. Since a feasible schedule may not be obtained from a production plan, an iterative approach is employed in the two procedures to obtain a solution that is feasible for both the production planning and scheduling problems. Computational tests on randomly generated test problems are done to show the performance of these algorithms, and results are reported.

  • PDF

ACCELERATED STRONGLY CONVERGENT EXTRAGRADIENT ALGORITHMS TO SOLVE VARIATIONAL INEQUALITIES AND FIXED POINT PROBLEMS IN REAL HILBERT SPACES

  • Nopparat Wairojjana;Nattawut Pholasa;Chainarong Khunpanuk;Nuttapol Pakkaranang
    • Nonlinear Functional Analysis and Applications
    • /
    • v.29 no.2
    • /
    • pp.307-332
    • /
    • 2024
  • Two inertial extragradient-type algorithms are introduced for solving convex pseudomonotone variational inequalities with fixed point problems, where the associated mapping for the fixed point is a 𝜌-demicontractive mapping. The algorithm employs variable step sizes that are updated at each iteration, based on certain previous iterates. One notable advantage of these algorithms is their ability to operate without prior knowledge of Lipschitz-type constants and without necessitating any line search procedures. The iterative sequence constructed demonstrates strong convergence to the common solution of the variational inequality and fixed point problem under standard assumptions. In-depth numerical applications are conducted to illustrate theoretical findings and to compare the proposed algorithms with existing approaches.

Vibration-Based Damage Identification Scheme for Prestress Concrete Bridges (PS 콘크리트 교량의 진동기초 손상검색체계)

  • 김정태;류연선;조현만;정성오
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1999.10a
    • /
    • pp.283-290
    • /
    • 1999
  • A practical damage identification scheme for PS concrete bridges via modal testing and system identification (SID) procedures is presented. The potential damage types are classified and the possible approaches which can be implemented into each damage type are designed. Damage identification algorithms are developed on the basis of the SID and modal analysis. The feasibility of the algorithms is verified from experimental tests to detect damage in PS concrete beam structures.

  • PDF

A Study on Approximate and Exact Algorithms to Minimize Makespan on Parallel Processors (竝列處理機械상에서 總作業完了時間의 最小化解法에 관한 硏究)

  • Ahn, Sang-Hyung;Lee, Song-Kun
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.16 no.2
    • /
    • pp.14-35
    • /
    • 1991
  • The purpose of this study is to develop an efficient exact algorithm for the problem of scheduling n in dependent jobs on m unequal parallel processors to minimize makespan. Efficient solutions are already known for the preemptive case. But for the non-preemptive case, this problem belongs to a set of strong NP-complete problems. Hence, it is unlikely that the polynomial time algorithm can be found. This is the reason why most investigations have bben directed toward the fast approximate algorithms and the worst-case analysis of algorithms. Recently, great advances have been made in mathematical theories regarding Lagrangean relaxation and the subgradient optimization procedure which updates the Lagrangean multipliers. By combining and the subgradient optimization procedure which updates the Lagrangean multipliers. By combining these mathematical tools with branch-and-bound procedures, these have been some successes in constructing pseudo-polynomial time algorithms for solving previously unsolved NP-complete problems. This study applied similar methodologies to the unequal parallel processor problem to find the efficient exact algorithm.

  • PDF

A Study on Approximate and Exact Algorithms to Minimize Makespan on Parallel Processors (병렬처리리례 상에서 동작업완료시간의 최소화해법에 관한 연구)

  • Ahn, Sang-Hyung;Lee, Song-Kun
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.16 no.2
    • /
    • pp.13-35
    • /
    • 1991
  • The purpose of this study is to develop an efficient exact algorithm for the problem of scheduling n in dependent jobs on m unequal parallel processors to minimize makespan. Efficient solutions are already known for the preemptive case. But for the non-preemptive case, this problem belongs to a set of strong NP-complete problems. Hence, it is unlikely that the polynomial time algorithm can be found. This is the reason why most investigations have bben directed toward the fast approximate algorithms and the worst-case analysis of algorithms. Recently, great advances have been made in mathematical theories regarding Lagrangean relaxation and the subgradient optimization procedure which updates the Lagrangean multipliers. By combining and the subgradient optimization procedure which updates the Lagrangean multipliers. By combining these mathematical tools with branch-and-bound procedures, these have been some successes in constructing pseudo-polynomial time algorithms for solving previously unsolved NP-complete problems. This study applied similar methodologies to the unequal parallel processor problem to find the efficient exact algorithm.

  • PDF