Yearly mean temperature and relative-humidity of the Seokguram Grotto was measured $19~23^{\circ}C$, 40~44% from May, 1998 to December,2002. The measurement has little differences comparing to the optimum guideline (temperature : $20^{\circ}\pm2^{\circ}C$, relative-humidity : $50^{\circ}\pm5%$). It is necessary to increase humidity in the Seokguram Grotto during winter because of heating and decrease the temperature during summer because of a higher temperature of outside. In addition, the diurnal range keep in $4^{\circ}C$ of temperature and in 10% of relative-humidity. Yearly mean concentration of $CO_2$(carbon dioxide) was measured538~658ppm that is higher than concentration of normal atmosphere(360 ppm). The $CO_2$ has an cumulative effect on the surface of stone cultural properties as a form of carbonic acid($H_2CO_3$) after reaction with water. HVAC (Heating, Ventilation and Air Conditioning) system should be operated to maintain ideal state for the preservation according to the optimum guideline. Also, the entrance into the Seokguram Grotto should be controlled to prevent a sudden fluctuation of humidity and temperature. Human could carry small particles like a microdust, microbe, etc., into the Seokguram Grotto and also could damage the surface by a direct touch.
Of school buildings, university building requires various case analysis unlike buildings in the elementary, middle and high schools in accordance with its characteristic for variables such as characteristic of department, construction structure and material, the number of persons admitted and schedule. Through the case research on the 'D' university located in Daejeon, this study made a comparison on the monthly and yearly consumption of gas and electricity of the most recent 3 years and implemented analysis on the usage pattern and standby power of air conditioning and heating by the hour and month using PCCS(Power Consumption Consulting System) as respects electricity that is considered to have a possibility of energy-saving. The result of analysis showed that enormous amount of electric power was used during the night time for freeze protection and burst in winter season and standby power was increased in winter season as a result.
This paper introduces an enhanced interleaved (IL) PFC (Power Factor Correction) boost converter typed 650V Intelligent Power Module (IPM), which is fully optimized hybrid IGBT converter modules; Silicon (Si) IGBT and Silicon Carbide (SiC) diode, for up to 10kW HVAC (Heating, Ventilation, and Air Conditioning) systems. It utilizes newly developed $4^{th}$ Generation Field Stop (FS) trench IGBTs, $EXTREMEFAST^{TM}$ anti-paralleled diodes, SiC Junction Barrier Schottky (JBS) diodes, Bridge rectifiers, Multi-function LVIC, and Built-in thermistor provide good reliable characteristics for the entire system. This module also takes technical advantage of DBC (Direct Bonded Copper) substrate for the better thermal performance. It is shown that the Si IGBT/SiC diode hybrid IL PFC module can achieve excellent EMI performance and greatly enhance the power handling capability or switching frequency of various applications compared to the Si IGBT/Diode. This paper provides an overall description of the newly developed 650V/50A Hybrid SiC IL PFC IPM product.
This paper is dedicated to the development of cooling devices such as mLHP with Fan-Fin system limited by noise and vibration. As we know, Heat pipe has the limitation of cooling capability to cool down the electronics. It is bounded by capillary and thermal limitation but heat load that it has to deal with is increasing. Especially Today's electronic technology has a tendency to integrate lots of function into the small piece of a processor like Dual core having 35W heat load for mobile and desktop computer respectively. There is an optimum operating condition of temperature, below $70^{\circ}C$, during the maximum heat load, 35W. There is the motivation needed to develop the new type of cooling devices and we can discuss about the new challenge beyond heat pipe.
The microchannel waterblock has a good capability in the cooling of electronic devices. The object of this paper is to study on thermal performance of microchannel water block for cooling of CPU in desktop. The effects of header shape, liquid flow rate, and inlet temperature on the thermal performances of microchannel waterblock are investigated experimentally. Three types of waterblock with different header shape are manufactured from the micro milling and brazing processing. The experiments are conducted using water, over a liquid flow rate ranging from 0.7 to 2.0 LPM and inlet temperature ranging from 20 to $35^{\circ}C$. Waterblocks are attached both horizontally and vertically on the test section to anticipate a performance of waterblock under the actual state in computer. The base temperature and thermal resistance decrease with increasing of liquid flow rate. It was found that the sample #1 was appropriate for the prototype of liquid cooling system.
The experimental implementation for different heating systems, district heating and separate heating and power, is discussed in the analysis of the characteristics of energy-usage in apartment complex. Total 20 families are chosen for the experiment, 10 for the district heating and the others for separate heating and power. Among the 10 families, the operating temperature was forced to be controled within certain range of temperatures for 5 ones, and it was left as usual for the other ones. The configuration and general features of each facilities and data acquisition systems are mentioned in brief and the technical specifications for it are also described. The analysis for the experiment results of this investigation is going to be carried out and published in a subsequent paper.
The objective of this study is to find the optimal set-point of a hybrid Plant, which is combined by renewable energy plant of the GSHP(Ground Source Heat Pump) and the conventional plant(chiller, boiler). The work presented in this study was carried out by using the EnergyPlus(Version 2.0). In order to validate the simulation model, field data were measured from a building. The GSHP was used as a base plant and the conventional plant as the assistant plant. Various temperatures were controlled (zone summer set-point, zone winter set-point, chilled water temperature, hot water temperature) to find the optimal set-point temperature of the system. The influence of the various set-points were analyzed seasonally.
The present study numerically investigated the tube geometry and arrangement on the performance of a high temperature generator (HTG) of the double effect LiBr-water absorption system. FLUENT, as a commercial code, was used to estimate the thermal performance of the HTG. Key parameters were the spacing raito of circular and flattened tubes, the pitch ratio of the rib on the flattened tube, and total heat transfer area of the HTG. Temperature and velocity profiles around the tubes of the HTG were calculated to estimate the thermal performance of the HTG. When the spacing ratio of circular and flattened tube is 1.11 and 0.73, the exhaust gas temperature is $185^{\circ}C$ without rib. The exhaust gas temperature when applied the rib in flattened tubes was lower by $24^{\circ}C$ than that without the rib. Rib can reduce the HTG volume by 7%.
In this paper, to systematically assess the abandonment risk of main control room (MCR) fire, fire simulations with Fire Dynamics Simulator were performed and abandonment probabilities were estimated for the MCR bench-board fire of domestic reference nuclear power plant. The fire simulation scenarios performed in this study included propagating and non-propagating fires of the MCR bench-board, and the availability and unavailability of heating, ventilation, and air conditioning system (HVACS). The following results were obtained. First, temperature was the major abandonment impact factor for the MCR bench-board fire if the HVACS was available and optical density was that if the HVACS was unavailable. Second, the fire scenario contributing the MCR bench-board fire abandonment risk was identified to be only the propagating fire. Third, it was confirmed that the abandonment probability of the MCR bench-board fire for domestic reference nuclear power plant could be reduced by using the fire modeling.
한국형 기동헬기(KUH-1)에 적용된 플래퍼밸브는 환경제어계통 장비로서 조종사의 임무수행에 핵심적인 장비이다. 플래퍼밸브는 조종사 및 승무원에게 난방, 환기, 공기조절기능을 가지고 있고, 항공기 내부온도를 유지시킴으로서 조종사 및 병력의 작전 운용능력을 만족시킨다. 본 논문에서는 플래퍼밸브의 비행시험 지적사항을 발생원인 별로 분류하고, 각 지적사항에 대한 고장탐구 수행과정을 정리하였다. 또한, 고장탐구 내용을 바탕으로 도출한 설계개선 사항과 개선사항에 대한 저온비행시험 검증 결과를 함께 기술하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.