• Title/Summary/Keyword: A Major Building

Search Result 1,579, Processing Time 0.025 seconds

A Study on the Issues and Trends of Zero Energy Policy (제로에너지 정책·제도 변화에 따른 이슈 및 트랜드 분석 연구)

  • Lee, Hangju;Kim, Insoo
    • Journal of Energy Engineering
    • /
    • v.29 no.2
    • /
    • pp.79-84
    • /
    • 2020
  • In order to reduce greenhouse gas by 30% compared to BAU in 2020, research and development of zero-energy building construction technology for reducing greenhouse gas emissions in the construction industry is being conducted. With the recent implementation of the policy as mandatory through the establishment and commercialization of the zero energy building base, the government should devise measures to support and expand technology through the identification of the current status of the zero-energy building incentive system and the erasure of the erasure. In order to implement zero-energy buildings, excessive construction costs are presented as a major issue in revitalizing the supply of new and renewable energy to enhance Passive (energy efficiency grade of 1++) and achieve self sufficiency of energy (20% or higher). In this paper, the major problems and solutions for zero-energy building identification were presented in order to activate the dissemination of zero-energy buildings, and the recent policy changes resulting from the mandatory use of zero-energy buildings were analyzed.

Influence characteristics of isolation piles on deformation of existing shallow foundation buildings under deep excavation

  • Liu, Xinrong;Liu, Peng;Zhou, Xiaohan;Wang, Linfeng;Zhong, Zuliang;Lou, Xihui;Chen, Tao;Zhang, Jilu
    • Geomechanics and Engineering
    • /
    • v.31 no.1
    • /
    • pp.1-14
    • /
    • 2022
  • Urban deep excavation will affect greatly on the deformation of adjacent existing buildings, especially those with shallow foundations. Isolation piles has been widely used in engineering to control the deformation of buildings adjacent to the excavation, but its applicability is still controversial. Based on a typical engineering, numerical calculation models were established and verified through monitoring data to study the influence characteristics of isolation piles on the deformation of existing shallow foundation buildings. Results reveal that adjacent buildings will increase building settlement δv and the deformation of diaphragm walls δh, while the isolation piles can effectively decrease these. The surface settlement curve is changed from "groove" type to "double groove" type. Sufficiently long isolation pile can effectively decrease δv, while short isolation piles will lead to a negative effect. When the building is within the range of the maximum settlement location P, maximum building rotation θm will increase with the pile length L and the relative position between isolation pile and building d/D increase (d is the distance between piles and diaphragm walls, D is the distance between buildings and diaphragm walls), instead, θm will decrease for buildings outside the location P, and the optimum was obtained when d/D=0.7.

Prediction and Compensation of Differential Column Shortening in High-Rise Building Structures (고층건물 기둥의 부등축소량 예측 및 시공오차 보정에 관한 연구)

  • 조창휘;송진규;이현호;조석희
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1996.10a
    • /
    • pp.258-266
    • /
    • 1996
  • The purpose of this study is to make a reasonable correction in construction stage through exact prediction of long-time differential column shortening that occurs in the high-rise RC building. For this, a self-developed program adopted PCA code is used to predict differential column shortening with sequential loading process. Using this program, the amount of the different column shortening of Amatapura Apartment in Indonesia is predicted and the effect is analyzed. From the result, the major factor affecting the shortening amount in columns is elastic strain and the effect of shrinkage is very small rather than creep. And maximun differential column shortening is appeared near the middle of the building.

  • PDF

A Fundamental Research to Safety at Tower Crane Major Work (타워크레인 주요 작업의 안전성에 관한 기초 연구)

  • Lee, Sung-Ho;Joo, Jin-Kyu;Lee, Goon-Jae;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.151-152
    • /
    • 2011
  • As recent construction projects aim to build higher and bigger buildings, lifting operation is getting increasingly important in construction sites. Accordingly, as tower cranes get higher and higher, disasters involving tower cranes are also on the rise. According to occupational incident statistics of the Korea Occupational Health & Safety Agency (KOHSA), most of such incidents occur in installation, dismantling and climbing phases of tower crane. Therefore, it is essential to develop preventative measures to secure safety of tower crane operations, with critical focus on installation, dismantling and climbing of tower crane. Hence, this research attempts to measure criticality of key risk factors in installation, dismantling and climbing phases of tower crane on construction site and propose necessary safety measures. As a result, conclusions herein will contribute to minimize disasters and incidents involving tower cranes in high-rise building construction sites.

  • PDF

Towards an Urban Troposphere

  • Kenoff, Jeffrey A;Gross, Peter
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.1
    • /
    • pp.15-24
    • /
    • 2022
  • Over the past 30 years, the tall building has seen unprecedented global support. With advanced innovation and many regions around the world discovering increasing growth rates, the tall, supertall, and megatall buildings continue to drastically alter the vertical urbanism of the cities they inhabit. For centuries, urban conditions in most major territories were predominately defined by the street wall and the spaces it shapes. Giambattista Nolli's 1748 Map of Rome most clearly illustrates this significance and possibly solidifies what generations would understand to be the predominant urban condition. As architects, it has been a city's lower vertical wall fabric that has often been the primary focus of efforts to craft an urban experience, and for good reason. Through recent examples of built and unbuilt KPF projects, this paper will explore an upper vertical wall fabric, an urbanism that not only exists at the ground but also within the troposphere.

Development of the procurement system for Just-in-Time Building Construction (건설공사 적시생산(Just-ln-Time)을 위한 조달시스템 개발 - 콘크리트 타설 공사를 중심으로 -)

  • Shin Bong-Soo;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.235-244
    • /
    • 2004
  • The effective management of major construction resources is the key to the success in high-rise residential building construction projects. It is even more important and challenging as well especially in CBD(central business district) area under tight project duration since little leeway in interface between construction trades, severe constraints in staging n and heavy demands for lifting among construction resources. In order to meet high demands among major construction resources, highly effective construction resource management information system is required This research develops and provides a system which selects and disseminates these information from each phase of procurement transportation, lift-up and storage for major construction resources This research applies the Kanban system, well recognized material information system technique in automobile manufacturing industry, in concrete work processes. It develops concrete procurement information system utilizing VSM(Value Stream Mapping) and also applies the model in actual super-high rise residential building construction project in order to analyze the benefit of the research model.

Establishing the Innovation Platform for the Sustainable Regional Development: Tech-Valley Project in Sejong city, Korea

  • Lee, Seo-Jeong;Lee, Eung-Hyun;Oh, Deog-Seong
    • World Technopolis Review
    • /
    • v.6 no.1
    • /
    • pp.5.1-5.12
    • /
    • 2017
  • The Republic of Korea developed a national project to construct a new administrative capital, Sejong city and to relocate administrative organizations of the central government for improvement of overpopulated capital, Seoul and regional balanced development. By the way, to relocate the central administrative organizations was not a sufficient condition for the sustainable development of the city. An industrial infrastructure development has been tried to attract universities, enterprises and research institutions in the region as a demand for internal growth power of the city was increased. In addtion, a basis for regional endogenous growth through projects to establish innovation system based on industry-academia cooperation was prepared as well. This paper reviews the major contents of the development plans for Tech-Valley project and looks into major introductory functions, characterization plans, strategies for fostering strategic industry, cooperation system of the inside and outside the region, and a strategy for building innovation platform. This case can be regarded as a significance of constructing technology infrastructure for the sustainable growth by preparing foundation for establishing innovation system and a cluster based on this system in the process of building and developing new city which did not have any industrial platform in the region.

A Design and Implementation of Data Registry for sharing data elements of Intelligent Building Systems (지능형 빌딩 시스템의 데이터 요소 공유를 위한 데이터 레지스트리의 설계와 구현)

  • Kim, Chang-Yong;Kim, Sheung-Kown
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.562-565
    • /
    • 2000
  • A data registry is a physical place to keep characteristics of classes of objects exist in the real world when they are chosen to record as data. It provides a centralized directory to describe the meaning, representation, and identification of data elements and their values. It assists to prevent redundancy and to preserve common understanding about the data described in a metadata set. In this paper, we investigate and classify various components of IBS(Intelligent Building Systems), specially HVAC in Building Automation Systems. We present IBSDR(Intelligent Building Systems Data Registry) model that specifies not only the detailed information on data elements but also the process of documenting data in IBS. It functions as the medium to create the data sharing environment to maintain exact meaning of data for every data elements so that database management designers or related users can create and exchange their DB without major modification. It also serves as a clearinghouse for information about IBS data. So all users can freely retrieve from and register data elements to IBSDR based on ISO/IEC 11179 through World Wide Web.

  • PDF

Anchored blind bolted composite connection to a concrete filled steel tubular column

  • Agheshlui, Hossein;Goldsworthy, Helen;Gad, Emad;Mirza, Olivia
    • Steel and Composite Structures
    • /
    • v.23 no.1
    • /
    • pp.115-130
    • /
    • 2017
  • A new type of moment-resisting bolted connection was developed for use in composite steel- concrete construction to connect composite open section steel beams to concrete filled steel square tubular columns. The connection was made possible using anchored blind bolts along with two through bolts. It was designed to act compositely with the in-situ reinforced concrete slab to achieve an enhanced stiffness and strength. The developed connection was incorporated in the design of a medium rise (five storey) commercial building which was located in low to medium seismicity regions. The lateral load resisting system for the design building consisted of moment resisting frames in two directions. A major full scale test on a sub-assembly of a perimeter moment-resisting frame of the model building was conducted to study the system behaviour incorporating the proposed connection. The behaviour of the proposed connection and its interaction with the floor slab under cyclic loading representing the earthquake events with return periods of 500 years and 2500 years was investigated. The proposed connection was categorized as semi rigid for unbraced frames based on the classification method presented in Eurocode 3. Furthermore, the proposed connection, composite with the floor slab, successfully provided adequate lateral load resistance for the model building.

Reducing Earthquake Fatalities and Destructions in Iran: A Project Management Perception

  • Tabassi, Amin Akhavan;Bakar, Abu Hassan Abu;Yusof, Nor'Aini
    • Asian Journal of Business Environment
    • /
    • v.4 no.1
    • /
    • pp.25-35
    • /
    • 2014
  • Purpose - Appropriate project management knowledge as well as its effective application in the construction industry increase construction quality and, therefore, reduce fatalities and destruction. Research design, data, and methodology - This study was conducted through a comparative analysis of earthquake fatalities in Iran, Turkey, Pakistan, Indonesia, China, Haiti, Japan, and the United States of America. The data was analyzed using a frequency study. The analysis contrasts the fatalities of some of the strongest earthquakes around the world between 1960 and 2010. Results - Poor quality construction practices and a lack of effective application of project management knowledge play a major role in the vast destruction, high death toll, and dismal tragedies that are associated with earthquakes, especially in Iran. Conclusions - Despite the history of tragic earthquakes and their continuing recurrence, this study attempts to make governments, companies, and disaster management personnel aware of the dangers of poor quality construction and the deficient application of project management knowledge and, further, accentuates effective ways to prevent the probability of serious damage in future. This study contains valuable information on the effects of project management application towards reducing earthquake fatalities and destruction.