• Title/Summary/Keyword: 현장 자재 관리

Search Result 185, Processing Time 0.03 seconds

Construction Material Management Using Smart Mobile Computing (스마트 모바일 어플리케이션을 이용한 건설 자재 관리)

  • Lee, Kwang-Pyo;Lee, Hyun-Soo;Park, Moon-Seo;Kim, Eui-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.59-69
    • /
    • 2011
  • Construction works have become larger and more complex, improving productivity by introducing Information Technology (IT) is pursued. In this circumstance, many different kinds of project management system is being introduced, and various IT technologies are applied such as Personal Digital Assistant (PDA), Bar Code, Radio Frequency Identification (RFID), Web Camera, and so on. However, these kinds of technologies might cause reprocessing of information and ineffectiveness of project because of lack of real time information processing technology or separation between construction sites and management offices. Therefore, this research aims to develop Application that can be applied efficiently for construction material management, by understanding problems of former management system with questionnaires and extracting functions with analysis of requirements. This will be possible to input information automatically, to process and check material information in real time, and to identify the location of necessary material. Then, the problem of separation between construction sites and management offices are solved, and as a result, more efficient management of materials in construction sites will become possible.

A Study of the High-rise building's Lift-up Management - through Division of Loading Factors of Equipment materials (초고층 건축 공사의 효과적인 양중 제안 - 설비공사 양중부하 분배 개선 방안)

  • Chung Yun-Woo;Kim Eun-Sang;Suh Hyun-Ah;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.539-542
    • /
    • 2004
  • Nowadays, High-rise building becomes higher and bigger than ever. As a result, lots of construction materials are needed at the same times. Because of divided diverse process of construction, several different Processes concur simultaneously with complexity of procurement. So, effective construction material supply and lift-up are essential part of the spot. Especially, when ending part of construction, there are much conflict between finishing and equipment materials also problems of folding lift-up. The Purpose of this paper is suggesting better effective lift-up system through analysis of loading factors.

  • PDF

Construction Materials Management System Based on Web Database (웹 데이터베이스 기반의 건축자재 관리 시스템)

  • Mun, Ji-Youn;Hwang, Suk-Seung
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.12 no.1
    • /
    • pp.195-200
    • /
    • 2017
  • Due to the rapid development of Internet technology, qualities of Web services are steadily improving and the Web database systems are actively employed to efficiently manage proper informations in various fields. In this paper, we propose a Web database system for the efficient material management for reusing construction materials. The proposed Web-based management system is operated using the spring framework, after constructing a database based on the collected data including tag ID, Location, Material, State, and Cycle, using the RFID(: Radion Frequency IDentification) system equipped with a location estimation module. Recently, the processing problem for a large amount of the residues generated at the demolition stage of various buildings is magnified in the construction site. The proposed Web-based construction material management system is expected for improving the processing problem as increasing the reusability and for reducing the construction cost as efficiently managing the construction materials for the reuse.

An Application of Cutting-edge Technology Sensors to Real-Time Construction Management of a Tunnel (터널의 실시간 시공관리를 위한 첨단센서의 기술 적용 방안)

  • Lee, Kang-Hyun;Kim, Dae-Won;Mun, Sung-Mo;Baek, Young-In;Lee, In-Mo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1438-1447
    • /
    • 2010
  • Construction sites are becoming larger and complex with the growth of national economy. Accordingly, It is essential to indentify real-time information about materials, equipments and manpower during construction at job sites. Even though research utilizing cutting-edge sensors has been conducted in architectural engineering field; this area of research is almost nil in civil engineering field. Therefore a feasibility study to find a way to apply cutting-edge sensors to an in-situ tunnel construction site adopting NATM is tried as the first step. After listing all construction materials needed in each activity, the most representative materials were identified so that IT technology can be applied by attaching and monitoring sensors to the selected materials; shotcrete and lining were selected as representative materials. Moreover, a plan to visualize construction process and progress management system using selected representative materials was proposed.

  • PDF

The Improvement Plans for Material Flow and Productivity Improvement of Low-e Double Glazing on Site (Low-e 복층유리의 현장 내 물류흐름 파악 및 생산성 향상을 위한 개선안 방향)

  • Lee Sang-Hyuk;Lim Myung-Bok;Lee Jae-Sung;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.341-344
    • /
    • 2003
  • There are many problems in management of high-rise building construction performed in downtown area due to limited spaces and equipments for increasing kinds and quantities of material. By these restrictions, problems such as increase of construction cost. delay of construction period, decrease of productivity, occurrence of accident are caused. Recently, studies on JIT concept have focused on construction materials as a solution for the problems. But, studies about finishing material are insufficient yet. Accordingly, this study suggests flowing of current material management, JIT management effect, and development direction of lifting-up and procurement system with Low-emissivity double Glazing, among of main finishing materials.

  • PDF

Economic Order Quantity(EOQ) Determination Process for Construction Material considering Demand Variation and Stockyard Availability (일일 수요량 변동성과 가용야적면적을 고려한 건설 자재의 경제적주문량(EOQ) 산정 프로세스)

  • Yun, Jung-Sook;Yu, Jung-Ho;Kim, Chang-Duck
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.33-42
    • /
    • 2011
  • Part of material and inventory management is one of important factor for business interests. But importance of material and inventory management in domestic construction project has been relatively devalued. The existing study of inventory has been studied with limited individual factor about inventory management. Therefore construction material management needs improvement via an accurate prediction with whole and systematic process viewpoint. and existing theory of material and inventory introduction to construction from manufacturing needs reflecting characteristics about construction project. This paper suggests material management process for economic material management. This paper to make a unit curtain wall of case construction project comparison between total cost of existing material management process and total cost of economic order quantity of proposal material management process To verify usefulness of order point and order quantity determination process.

A real-time construction management of a tunnel using position tracking sensor (위치추적 센서를 이용한 터널의 실시간 시공관리)

  • Lee, Kang-Hyun;Kim, Dae-Won;Mun, Sung-Mo;Cho, Hun-Hee;Kang, Kyung-In;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.2
    • /
    • pp.133-148
    • /
    • 2011
  • Construction sites are becoming larger and complex with the growth of national economy. Accordingly, it is important to identify real-time information about materials, equipments, and manpower during construction at sites. Even though research utilizing position tracking sensors has been conducted in architectural engineering fields, this area of research is almost nil in civil engineering fields. Therefore, a feasibility study to find a way to apply position tracking sensors to an in-situ tunnel construction site adopting conventional tunnelling method is performed in this study. A methodology is proposed that the progress management of the tunnelling work can be monitored by checking construction materials needed at job site and the safety management system can be assessed by checking distance between in-situ workers and construction equipments. The most representative materials were identified so that IT technology can be applied by attaching and monitoring sensors to the selected materials. Also, time of arrival (TOA) for a position determination technology along with a wireless network technology was chosen and build wireless network system. The adopted methodology was applied to an in-situ tunnelling site, and verified the usefulness of the proposed system.

Information management system development of construction material based on international data attribute (국제 데이터 속성 기반 건설자재 정보관리 시스템 구축)

  • Choong-Han Han
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2008.11a
    • /
    • pp.645-648
    • /
    • 2008
  • 최근 건설 분야의 정보화 기술이 발달함에 따라 건설생애(Life Cycle) 과정에서 파생되는 방대한 양의 정보를 수집·가공·축적·제공 하는 시스템이 급증하는 추세이다. 특히, 건설공사의 주요요소인 자재 정보를 제공하는 Web 기반 온라인 시스템만 현재 110여개 이상으로 토목·건축·설비·소방 분야에 이르기까지 매우 다양하다. 그러나 이러한 시스템에서 제공 중인 정보가 표준화 및 정형화 되지 않아 건설현장 실무자들의 정보 획득에 있어 많은 어려움을 겪고 있다. 이에 본 연구에서는 정형화되고 표준화된 건설자재정보를 제공하기 위해 건설자재 분류체계를 정의하고 건설자재 속성정보를 정형화하여 자재별 분류체계검색, 통합검색, 카테고리검색 뿐만 아니라 전자카탈로그로 변환 및 생성이 가능한 건설자재정보 관리 시스템을 설계 및 구현 하였다.

A Study on Computerization Method for the Quality Test Management System in Construction materials (건설자재 품질시험결과 관리시스템 구축방안 연구)

  • Kim, Young-Jin
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2012.06b
    • /
    • pp.37-39
    • /
    • 2012
  • 건설현장에서 의뢰하여 품질검사전문기관에서 대행하는 건설자재의 품질시험 검사업무에 대한 신뢰성 제고를 위해 품질시험 검사 의뢰절차 및 지방국토관리청의 품질검사전문기관 등록 관리 현황을 조사하고, 품질검사전문기관에서 품질시험 검사성적서 및 시험과정자료를 정보시스템에 입력하여 관리할 수 있는 정보시스템 구축방안을 도출하고자 한다.

A Study on Procurement of Construction Materials in the HwaSeong Construction Project (화성건설공사에서 자재의 조달방법 연구)

  • Kim, Kyoon-Tai
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.183-188
    • /
    • 2009
  • HwaSeong (Suwon Fortress) was built during the reign of King Jeong-jo in the Choseon Dynasty. Detailed information on the construction of HwaSeong can be found in Hwaseong Seongyeok Euigui. In this sense, it is necessary to perform a comparative analysis on the Hwaseong Seongyeok Euigui based on construction management factors. This paper aims to analyze the HwaSeong construction project from a modern construction perspective by comparing and reviewing information related to the procurement of construction materials of the time. For this, wooden and steel materials and tiles were analyzed by supply area, supply channel, type and price. From the results of the analysis, it is found that the government used both private and official channels to supply materials. In particular, except for wooden materials that could be supplied from Bongsan, the supply of materials showed a high dependency on private channels. In terms of steel, it was almost 30 percent cheaper through private channels than when purchased through the official channel. Finally, materials vulnerable to damage like tiles were manufactured from the areas near the construction site. From this fact it can be interpreted that the government had a flexible procurement system, including manufacturing on the spot and external suppliers,depending on the property of the material. It is expected these analytical results will serve as key data to understand the management factors in constructing HwaSeong.