Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.9
no.4
/
pp.219-230
/
2011
The nuclear fuel cycle (NFC) analysis is a study to set a NFC policy and to promote systematic researches by analyzing technologies and deriving requirements at each stage of a fuel cycle. System analysis techniques are utilized for comparative analysis and assessment of options on a considered system. In case that NFC is taken into consideration various methods of the system analysis techniques could be applied depending on the range of an interest. This study presented NFC analysis strategies for the development of a domestic advanced NFC and analysis techniques applicable to different phases of the analysis. Strategically, NFC analysis necessitates the linkage with technology analyses, domestic and international interests, and a national energy program. In this respect, a trade-off study is readily applicable since it includes various aspects on NFC as metrics and then analyzes the considered NFC options according to the derived metrics. In this study, the trade-off study was identified as a method for NFC analysis with the derived strategies and it was expected to be used for development of an advanced NFC. A technology readiness level (TRL) method and NFC simulation codes could be utilized to obtain the required metrics and data for assessment in the trade-off study. The methodologies would guide a direction of technology development by comparing and assessing technological, economical, environmental, and other aspects on the alternatives. Consequently, they would contribute for systematic development and deployment of an appropriate advanced NFC.
Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.8
no.4
/
pp.269-277
/
2010
Various multilateral approaches to the nuclear fuel cycle have been proposed in order to suppress the expansion of sensitive fuel cycle technology. In order to prepare for the future multilaterallization of the nuclear fuel cycle, existing multilateral spent fuel management programs are analyzed. A trial multilateralization of a domestic R&D facility for the back end of the nuclear fuel cycle is proposed and its challenges, possibilities and implementation strategy are discussed.
Cycle length of domestic nuclear power plants is determined by the demand-supply plan of utility company. The target cycle length is achieved by adjusting the number of feed fuel assembly and fuel enrichment. Traditionally, utility company first select the number of feed fuel assembly and then find out the fuel enrichment to achieve the special cycle length. But it is difficult to find out if this method is most economical than any other combinations of the enrichment and batch size satisfying the same cycle length. In this paper, core depletion calculation is performed to find out the optimum combination of the enrichment and batch size for given target cycle length in terms of fuel cycle cost using commercial core design code; CASMO/MASTER code. To minimize the uncertainty resulting from transition core analysis, levelized fuel cycle cost analysis was applied to the equilibrium cycle core in order to determine the optimum combination. The sensitivity study of discount rate was also carried out to analyze the levelized fuel cycle cost applicable to countries with different discount rates. From the levelized fuel cycle cost analysis results, the combination with smaller batch size and higher fuel enrichment becomes more economical as the discount rate becomes lower. On the other hand, the combination with higher batch size and lower fuel enrichment becomes more economical as the discount rate becomes higher.
Proceedings of the Korean Nuclear Society Conference
/
1995.05a
/
pp.806-811
/
1995
DUPIC 핵연료주기에서 기준 핵연료로 설정된 사용후 경수로핵연료, 신 DUPIC 및 사용후 DUPIC핵연료의 핵종별 농도, 방사능, 붕괴열, 위해지수 및 방사선원항을 시간의 함수로 그 변화 특성을 분석하고, 각 인자별로 :-B게 영향을 미치는 주요 핵종의 거동을 물질농도 측면에서 추적하여 분석.평가 하였다. 방사성물질의 농도와 방사능 및 붕괴열 측면에서 모두 사용후 DUPIC핵 연료는 사용후 경수로핵연료에 111해 양적인 감소현상이 뚜렷하게 나타났다. 이는 DUPIC핵 연료주기의 경제적인 이득은 물론 환경 안전성 측면에서 크게 기여할 것임을 시사하고 있다. 한편 섭취 위해지수는 냉각기간에 따라 약간의 차이를 보이나 두 경우 비슷한 것으로 나타났으며, 방사선원 항의 세기에 있어서는 에너지 스펙트럼에 의존하는 것으로 나타났다. 이러한 결과는 향후 전체, DUPIC핵연료주기 평가에 있어서 기본 자료로 유용하게 활용될 수 있을 것으로 기대된다.
현재 우리나라에는 3기의 원전이 운전중에 있으며 6기가 건설중에 있다. 즉, 2기의 가압경수로(PWR)의 1기의 가압중수로(HWR)가 운전중에 있으며 건설중인 것은 모두 PWR이다. 현재 추진되고 있는 원전계획을 수행하면, 1990년에는 사용후핵연료가 년간 약200톤씩 방출될 것이며, 2000년에는 500톤 정도가 방출되게 된다. 이와 같은 핵사용후연료는 현재 소내저장하고 있으나 '90년대 중반 부터는 소내저장용량이 한계에 달하게 될 것으로 전망되고 있다. 따라서 본교에서의 이와 같은 소내저장 한계성에 대처할 수 있는 가능한 방안을 검토하고, 이를 경제성 측면에서 분석하고자 하였다. 사용후핵연료의 관리방안에 대한 경제성 분석을 위해서는 장래의 원전계획, 원자로형 및 핵연료주기방식 등에 대한 여러 가지 가정이 필요하게 된다. 원전계획은 정부에서 발표한 $\ulcorner$5차5개년 수정계획$\lrcorner$에 의거하여 원전시설용량은 현재의 2GWe에서 2000년에는 22GWe로, 2025년에는 44GWe로 늘어나는 것으로 보았다. 이와 같은 원전계획을 바탕으로 6가지 핵연료주기에 관한 시나리오를 설정하였다. 즉, 사용후핵연료를 비순환방식으로 운영하는 2가지 경우, 순환방식으로 운영되는 3가지 경우 그리고 FBR에 활용하는 1가지의 경우에 대하여 검토하였다. 사용후핵연료의 관리방식에 따른 장기적인 안목에서의 경제성 분석은 핵연료주기비용 뿐만아니라 원전의 투자비도 함께 분석하는 것이 합리적이며, 따라서 본교에서는 계획기간 동안의 6가지 시나리로에 따른 원전 및 핵연료주기에 관한 총 투자비를 비교하였고, 1982년 가격으로 현가화한 단가도 비교${\cdot}$검토 하였다. 이와 같은 6가지 시나리오에 대한 경제성을 비교해 본 결과, 핵연료주기선택의 경제성평가에 큰 영향을 주는 핵연료주기요소는 재처리비, 재처리시 방출되는 폐기물의 처리${\cdot}$처분비 그리고 사용후핵연료 저장방식으로 판명되었으며 6가지 시나리오에 대한 경제성 비교평가 결과, 다음과 같은 결론을 얻었다. 단기적인 안목에서는 소내저장용량을 확장하는 방안이 가장 바람직하며, 중기적인 관점에서는 소외집중저장설비가 활발히 수행되는 시점에서는 사용후핵연료를 재처리하여 재활용하는 방안도 강구되어야 할 것이다.
Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.13
no.4
/
pp.243-251
/
2015
Nuclear power is currently the second largest power supply method in Korea and the number of nuclear power plants are planned to be increased as well. However, clear management policy for spent fuels generated from nuclear power plants has not yet been established. The back-end fuel cycle, associated with nuclear material flow after nuclear reactors is a collection of technologies designed for the spent fuel management and the spent fuel management policy is closely related with the selection of a nuclear fuel cycle. Cost is an important consideration in selection of a nuclear fuel cycle and should be determined by adding external cost to private cost. Unlike the private cost, which is a direct cost, studies on the external cost are focused on nuclear reactors and not at the nuclear fuel cycle. In this research, external cost indicators applicable to nuclear fuel cycle were derived and quantified. OT (once through), DUPIC (Direct Use of PWR SF in CANDU), PWR-MOX (PWR PUREX reprocessing), and Pyro-SFR (SFR recycling with pyroprocessing) were selected as nuclear fuel cycles which could be considered for estimating external cost in Korea. Energy supply security cost, accident risk cost, and acceptance cost were defined as external cost according to precedent and estimated after analyzing approaches which have been adopted for estimating external costs on nuclear power generation.
Proceedings of the Korean Nuclear Society Conference
/
1998.05a
/
pp.64-69
/
1998
KALMER 우라늄 금속핵연료노심의 평형주기에 대하여 주기길이, 농측도, 중식비의 관점에서 설계인자 변경에 따른 변화를 분석하였다. 유효노심높이, 반경방향 블랑캣의 batch수, 개스팽창모듈(GEM)의 적용성, 노용기내핵 연료저장(IVS)의 사용. 핵연료핀의 직경 증가 둥에 대한 설계 변경이 고려되었다. 본 연구결과를 통하여, 평탄화된 출력분포 및 핵연료의 이용도 향상을 기하면서 설계변경이 타 분야에 미치는 영향을 최소화하고 본래 KALMER의 안전성을 유지하고자 핵연료핀의 직경을 증가시킨 fat pellet 설계방안을 채택하였다
Proceedings of the Korean Nuclear Society Conference
/
1996.05a
/
pp.205-212
/
1996
국내 1000 MWe급 발전소인 영광 3,4호기는 현재 표준주기 (12개월 주기)로 운전되고 있으나 향후 18개월 장주기 운전을 계획하고 있다. 본 연구에서는 영광 3,4호기의 교체노심을 대상으로 표준주기와 장주기에 대한 장기 핵연료관리계획을 수립하고 이들 평형노심에 대하여 핵연료주기비와 발전원가를 중심으로 경제성 분석을 수행하여 상호 비교하였다. 18개월 장주기로 운전할 경우 표준주기에 비하여 핵연료주기비는 약 7% 증가하나 약 4%의 발전소 이용율 향상에 따라 고정비가 약 5% 절감되어 총 발전원가를 약 4% (연간 약 99 억원) 절감할 수 있는 것으로 평가되었다. 또한 선형반응도 모델을 이용하여 핵연료 이용도(Fuel Utilization Curve)를 만들어 발전원가에 영향을 미치는 교체 신연료의 다발수, 농축도, 주기길이, 발전소 평균 부하율 및 재장전 보수기간의 변화에 따른 발전원가의 민감도 분석을 수행하였다.
Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.8
no.4
/
pp.339-346
/
2010
Recently, there have been grave concerns that the anticipated increase in the use of nuclear energy worldwide could result in dissemination of sensitive nuclear technologies. To meet the increase in nuclear energy demand and strengthen the non-proliferation regime simultaneously, the various proposals for 'multilateralization of nuclear fuel cycle' have been widely suggested. Those proposals are expected to have serious impacts on our country, if they has come true. In this paper, therefore, the 12 existing proposals were reviewed and assessed for their potential impacts on our country, in order to help prepare the appropriate measures responding to the international attempt of 'multilateralization of nuclear fuel cycle'.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.