• Title/Summary/Keyword: 한국고속전철

Search Result 453, Processing Time 0.03 seconds

Engineering Feasibility of IT and Smart Sensor Technology Applications for the Next Generation High Speed Train (차세대 고속전철에 적용할 IT 및 스마트센서 기술의 타당성 검토에 관한 연구)

  • Chang, Duk-Jin;Kang, Song-Hee;Song, Dahl-Ho
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.547-556
    • /
    • 2009
  • In this paper, we tried to find the engineering feasibility of the component functions of the seven selected application technologies which are going to be installed on the next generation high speed train as the IT and smart sensor application technologies. The component functions of the seven applications, including the "Emergency or reminder notification", were identified and analyzed. In order to justify the feasibility of applications development, effect analysis and sufficiency analysis were performed. In effect analysis, how each function has an effect on safety, convenience, and efficiency of the passengers and attendants was evaluated. In sufficiency analysis, the importance and implementability of each function as a component was evaluated. The feasibility analysis was focused on the technical aspects of the functions. The following work will be the settlement of the final applications that are going to be designed and implemented. This will be done by studying the strategic feasibility in relation to the service or business of the high speed train.

  • PDF

A Study on Battery Chargers for the next generation high speed train using the Phase-shift Full-bridge DC/DC Converter (위상전이 풀-브리지 DC/DC 컨버터를 이용한 차세대 고속 전철용 Battery Charger에 관한 연구)

  • Cho, Han-Jin;Lee, Won-Cheol;Lee, Sang-Seok;Kim, Tae-Hwan;Won, Chung-Yuen
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.623-628
    • /
    • 2009
  • There is an increasing demand for efficient high power/weight auxiliary power supplies for use on high speed traction application. Many new conversion techniques have been proposed to reduce the voltage and current stress of switching components, and the switching losses in the traditional pulse width modulation(PWM) converter. Especially, the phase shift full bridge zero voltage switching PWM techniques are thought most desirable for many applications because this topology permits all switching devices to operate under zero voltage switching(ZVS) by using circuit parasitic components such as leakage inductance of high frequency transformer and power device junction capacitance. The proposed topology is found to have higher efficiency than conventional soft-switching converter. Also it is easily applicable to phase shift full bridge converter by applying an energy recovery snubber consisted of fast recovery diodes and capacitors.

  • PDF

Harmonic Bun Analysis of Traction Motor in the High Speed Train with the Distributed Tractions (운전 특성을 고려한 고속 전철용 영구자석 동기전동기의 철손 해석)

  • Seo, Jang-Ho;Lim, Jae-Won;Lee, Sang-Yub;Jung, Ryun-Kyo
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.267-274
    • /
    • 2009
  • To predict efficiency of Interior Permanent Magnet Synchronous Motors(IPMSM) and to cope with the demagnetization risk of permanent magnets used in the IPMSM, accurate iron analysis of the IPMSM is very important at the motor design stage. In the analysis, we calculate the operation condition such as rotor speed and current angle. and then, we analyzed the iron loss of the machine for electric vehicle according to its driving condition. From the analysis results, it was shown that the harmonic iron losses of stator are larger than before at field-weakening region. In addition, it was revealed that rotor iron loss mainly induced by stator slot-ripples is independent of current angle and only varied according to the speed.

  • PDF

A Study on the Application of Design Factor for Design Identity of High speed EMU (동력 분산형 고속전철의 아이덴티티 확립을 위한 디자인 요소 적용에 관한 연구)

  • Woo, Jung-Hwan;Yang, Seung-Yun;Seok, Jae-Heuck;Park, Kyong-Jin;Han, Jung-Wan
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.277-282
    • /
    • 2009
  • This research present final Proto-type design of Korean High speed EMU identity establishment. To making Proto-type design; Frist step is extracting design factor which can makes final image of Proto-type. And last, Apply it to the Original-form which was presented by last research. This research is for take one's own identity of korean High speed EMU, and makes originality of design for korean rail-road culture.

  • PDF

Study of Analysis Software for Event Recorder in High Speed Railway (고속전철용 Event Recorder를 위한 분석도구 소프트웨어 연구)

  • Song, Gyu-Youn;Lee, Sang-Nam;Ryu, Hee-Moon;Kim, Kwang-Yul;Han, Kwang-Rok
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.341-347
    • /
    • 2009
  • In high speed railway, event recorder system stores a train speed and the related data for train operation in real time. Using those information, we can analysis the train operation and the reason of train accident. Analysis software gets the stored data from Event Recorder and shows the status of various signals related with train operation. Using it, also we can analysis the train operation before and after the given time. In this paper we propose the analysis software to show and analysis the operation of high speed train. The method of transferring the stored data from Event Recorder into Analysis Software is proposed. We develop the efficient procedure to store the transferred data into analysis system. Also the effective method to show the store data and to analysis them is studied for finding the cause of train accident.

  • PDF

Combined test of Power Supply System for Korean High Speed Train (고속전철용 보조전원장치 시스템 조합시험)

  • Cho, Hyun-Wook;Kim, Yuen-Chung;Kim, Tae-Hwan;Jang, Kyung-Hyun;Kim, Chul-Ho
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.619-625
    • /
    • 2008
  • Electrical Power supply System conditions of korea high speed train consists of main transformer, four AC-DC PWM converter of Auxiliary Block, Battery Charger in Power Car and Trailer Car, Trailer Inverter, Auxiliary inverter. Main transformer, at nominal voltage of 25kv supplied to secondary winding nominal output Voltage 383Vac, The Auxiliary block consists of AC-DC converters for generating 670VDC power, Auxiliary inverters for ventilation and air compressor, Trailer car inverter provide three phase power supplies at 440Vac for air conditioning and heating. The Battery charger Trailer and Power car supplies 72VDC all necessary equipment to energize the trainset equipment and suppy essential control. This Paper introduces the combined test results of the power supply system for korea high speed train. The main purpose of this combined test is to verify the performance of the power supply system that is designed to operate up to full load test.

  • PDF

Measurement of EMI by High-Speed Train System (고속전철 시스템의 EMI 측정)

  • Gimm, Yoon-Myoung;Ju, Young-Jun;Yoo, Jea-Seong;Koo, Bon-Chul
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1157-1162
    • /
    • 2008
  • High speed train system consumes much electric power during running, and generate much EMI (electromagnetic interference) by arc between the pantograph and the trolley line. In this paper, EMI was measured following EN50121-2, 'Railway applications. - Electromagnetic compatibility. (Emission of the whole railway system to the outside world)', from the running high-speed railway (KTX) at 300 km/h speed. Measured results exceed the limit values of EN50121-2 in low frequency band ($9\;kHz{\sim}150\;kHz$), but they did not exceed the limit values in other higher frequency band ($150\;kHz{\sim}1\;GHz$).

  • PDF

A Study on the Battery Charger for Next Generation High Speed Train (차세대 고속 전철용 Battery Charger 에 관한 연구)

  • Jeong, Han-Jeong;Lee, Won-Cheol;Lee, Sang-Seok;Paik, Jin-Sung;Won, Chung-Yuen
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.321-324
    • /
    • 2008
  • Recently, there is an increasing demand for efficient high power/weight auxiliary power supplies for use on high speed traction application. many new conversion techniques have been proposed to reduce the voltage and current stress of switching components, and the switching losses in the traditional pulse width modulation(PWM) converter. Among them, the phase shift full bridge zero voltage switching PWM techniques are thought most desirable for many applications because this topology permits all switching devices to operate under zero voltage switching(ZVS) by using circuit parasitic components such as leakage inductance of high frequency transformer and power device junction capacitance. The proposed topology is found to have higher efficiency than conventional soft-switching converter. Also it is easily applicable to phase shift full bridge converter by applying an energy recovery snubber consisted of fast recovery diodes and capacitors.

  • PDF

Study on Selection of IT and Smart Sensor Technologies to be Applied to the Next-Generation High-Speed Train (차세대 고속전철에 적용할 IT 및 스마트센서 기술의 선정에 관한 연구)

  • Chang, Duk-Jin;Kang, Song-Hee;Song, Dahl-Ho
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1977-1987
    • /
    • 2008
  • In this paper, presented was the research work of finding practical application systems using IT that would be adopted by the next generation high speed train for the safety, convenience, and comfort of the passengers and crew members. Study on the applications using smart sensors and IT brought up 26 feasible application cases. Among them 16 cases were related with IT applications and 10 cases smart sensor applications. After having public hearings and surveys to make the decision more objective and generally acceptable, 7 applications - such as information providing service using personal LCD monitor, alarm service, individual internet access service, automatic and remote air conditioning, wireless visual communication with an attendant, extraordinary sound detection, urgent situation in toilet monitoring - out of those 26 were chosen as the final applications.

  • PDF

Survey on the Adoptability of IT and Smart Sensor Technologies into the Next-Generation High-Speed Train (차세대 고속전철에 적용할 IT 및 스마트센서 기술의 수용성에 관한 조사 연구)

  • Chang, Duk-Jin;Joh, Won-Il;Kang, Song-Hee;Song, Dahl-Ho
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1988-1998
    • /
    • 2008
  • Performed was a survey to find the level of interest on passenger services using IT and smart sensor technology in connection with High Speed Train development in Korea. The survey respondents were sampled from the KTX passengers, KTX crews, Korail employees, IT or sensor experts, and rolling stock experts. The results of the survey were categorized as importance, urgency/necessity, importance vs urgency/necessity, improvement measure, preferable activities based on the trip length, and inconveniencies. By analyzing the results, service items that can be implemented to the High Speed Train were recognized. The results showed that a passenger tends to expect to have his/her comfort and convenience, an attendant safety and serviceability, a Korail employee information provision and serviceability, an IT/sensor expert technological implementation done, and a rolling stock expert implementation done in practical level.

  • PDF