• Title/Summary/Keyword: 프로젝트 위험관리

Search Result 191, Processing Time 0.03 seconds

Analysis of Schedule Risk using PROMETHEE (PROMETHEE 기법을 활용한 공정리스크 중요도 분석)

  • Lee, Jang-Young;Yoon, Yoo-Sang;Jang, Myung-Hoon;Suh, Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.353-357
    • /
    • 2008
  • The building construction projects include a variety of risk factors due to uncertainties. To succeed in the projects, it is important how risks are managed. Risk management processes identification, analysis and response. Especially, the analysis process is important to objectively identify importance and priority among risk factors. The purpose of this study is to develop the effective analysis process by studying and supplement the problem of the AHP analysis method. The study provides a analysis process to use the PROMETHEE analysis method proposed.

  • PDF

Establishing Risk Management Process for Improved Business Value of a Multi-Purpose Building Project (복합 시설 프로젝트의 사업 가치 향상을 위한 리스크 관리 프로세스 구축 방안)

  • Lee, Jong-Sik;Cho, Seung-Ho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.64-71
    • /
    • 2018
  • Project Management Institute of America separates the types of risk with external risks and internal risks. The external risk is an uncontrollable risk in projects such as changes of policy and related systems, climate, natural disasters, exchange rates and so on. The internal risk is an existing risk in the project itself that is controllable items in the project. Technical risks in project management are cost, quality, time, safety and environment. Therefore, both the external and internal risks should be managed to perform the construction project successfully. In particular, we can secure the quality and safety of facilities through the technical risk management. The importance of potential risk management has been emerging as a major interest and the lack of risk management delays projects and increases construction costs with negative effects of the building safety since the complex building, which is composed of a great number of facilities, consists of many project units and there are conflicts between various participants and stake-holders. This study presents the ways of establishing risk management processes to ensure the safety of the complex building. To that end, establishing procedure of risk management processes is presented and types of risk and factors in construction projects and counter strategies are presented as available risk information on the stages.

A Study on the Quality Improvement Plan through Analysis of Information System Audit Examples (정보시스템 감리사례 분석을 통한 품질 향상 방안에 관한 연구)

  • Lee, Don-Hee;Jung, Hong-Sup;Lee, Ki-Young;Han, Ki-Joon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.17 no.10
    • /
    • pp.203-216
    • /
    • 2012
  • For the successful operation of the current organization, the importance of the information system is further increasing, and audit for the information system construction is also spreading according to the mandatory of information system audit. However our country's information system audit still does not deal with various risks and the improvement plan of it is desperately needed since bad practices are often happened while performing audit for the various information system projects. Therefore, this paper proposed improved review items for the quality improvement of information system construction by analysing data of information system audit projects and risk occurrence projects that are performed by the domestic large SI company during four years. In addition, this paper verified the effectiveness of the improved review items proposed in this paper by applying them to actual information system project examples.

A Study on the Framework of Cutover Decision Making on Large-scale IS Development Projects: A Core Banking Development Case of D Bank (대규모 정보시스템 개발 프로젝트의 컷오버 의사결정 프레임워크에 관한 연구: D은행 코어뱅킹 시스템 구축 사례를 중심으로)

  • Jeong, Cheon-Su;Ahn, Hyun-Chul;Jeong, Seung-Ryul
    • Information Systems Review
    • /
    • v.14 no.1
    • /
    • pp.1-19
    • /
    • 2012
  • A large-scale IS development project takes a long time, thus its project manager needs to be more careful on risk management. In particular, appropriate cutover decision making is critical in large-scale IS development projects because the opening of the large-scale IS significantly impacts the organization. Regardless of its importance, cutover decision making in conventional IS development projects has been done in a quite simple way. Conventional cutover decisions have been made by considering just whether the new IS operates or not from the system, application, and data implementation perspectives. However, this approach may lead to unsatisfactory performance or system failure in complex large-scale IS development. Under this background, we propose a new framework for cutover decision making on large-scale IS projects. To validate the applicability, we applied the framework to a core banking system development case. The case study shows that our framework is effective in proper cutover decision making.

  • PDF

Impact of Construction Safety Managers and Project Characteristics on Air Conditioning Installation Safety Scores (건설 안전관리자의 특성 및 프로젝트 특성이 에어컨 설치 공사의 안전 점수에 미치는 영향)

  • Uhm, Miyoung;Kim, Jinyoung;Kim, Hongjo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.3
    • /
    • pp.381-391
    • /
    • 2024
  • This study examined the factors influencing safety scores in air conditioning installation projects, with a specific focus on the characteristics of safety managers and project-specific details. Given the increase in industrial accidents within this sector and the lack of research on smaller-scale operations, this analysis of 7,046 safety data records from Company A aimed to address this gap. The results indicate that the month of project commencement has the most significant impact on safety scores(correlation coefficient of 0.21), followed by the age of the safety manager(correlation coefficient of 0.06). Interestingly, the educational background of the managers did not appear to influence safety outcomes. Furthermore, project cost was found to have a negative correlation with safety scores(-0.1), suggesting that lower-cost projects may be associated with higher risk levels. These findings underscore the importance of developing tailored safety checklists that take into account the specific timing and scale of air conditioning installation projects. Additionally, the results suggest that incorporating both experienced(older) and less experienced(younger) safety managers into safety strategies may be beneficial for achieving optimal safety outcomes. This balanced approach could leverage the strengths of both groups, potentially enhancing overall risk assessment and mitigation efforts.

Study on the defence R&D project risk analysis using AHP (AHP 기법을 이용한 국방연구개발사업 위험요인 분석에 관한 연구)

  • Eom, Jae-Seob;Kim, Seung-Bum
    • Journal of the Korean Data and Information Science Society
    • /
    • v.24 no.3
    • /
    • pp.557-569
    • /
    • 2013
  • Risk management activity for successful defense R&D project should be done anticipatorily and consistently over the entire project period and there should be a priority for management depending on importance of the risk factors. In this study, we verified the reliability and validity through factor analysis for the risk factors selected by the Delphi technique. We also obtained the relative importance of risk factors with analytic hierarchy process (AHP) and decided to prioritize for comparison of domestic and overseas research. According to the study, we found that it is important to settle the requirements and to classify the scope of R&D. It is also considered significant to have reasonable schedule for completion and secure the necessary resources in the early stage of project. Unlike previous studies, it appeared the technical factors are critical elements as well for defense R&D project.

The Evaluation-based CBR Model for Security Risk Analysis (보안위험분석을 위한 평가기반 CBR모델)

  • Bang, Young-Hwan;Lee, Gang-Soo
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.34 no.7
    • /
    • pp.282-287
    • /
    • 2007
  • Information society is dramatically developing in the various areas of finance, trade, medical service, energy, and education using information system. Evaluation for risk analysis should be done before security management for information system and security risk analysis is the best method to safely prevent it from occurrence, solving weaknesses of information security service. In this paper, Modeling it did the evaluation-base CBD function it will be able to establish the evaluation plan of optimum. Evaluation-based CBD(case-based reasoning) functions manages a security risk analysis evaluation at project unit. it evaluate the evaluation instance for beginning of history degree of existing. It seeks the evaluation instance which is similar and Result security risk analysis evaluation of optimum about under using planning.

Virtual Construction System for Visualizing Risk Management Information (건설공사 리스크관리기법의 가상건설시스템 연동 방법론 연구)

  • Kim, Hyeon-Seung;Park, Jin-Jung;Park, Nam-Jin;Choi, Gwang-Yeol;Seo, Hwa-Jin;Kang, Leen-Seok
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.77-80
    • /
    • 2010
  • 최근 건설 프로젝트의 대형화 및 다양한 신공법들의 도입으로 불확실한 위험도 요인들이 점점 증가함으로써 일련의 시스템적 절차에 따른 리스크관리 (Risk Management)체계와 프로젝트 참여자들간의 효율적인 정보전달 방안이 요구되고 있다. 이를 위해 본 연구에서는 '리스크 시각화 시뮬레이션 구축 방법론'을 제시한다. 이는 최근 각종공사 정보 시각화부분에서 주목받고 있는 4D CAD 기술과 리스크 분석을 시스템적인 절차로 구성하여 연계한 방법이다. 시스템적 리스크 분석 절차는 리스크관리기법인 AHP 및 퍼지 분석기법을 동시에 적용하여 합리적인 리스크 정량화를 수행할 수 있도록 구성하였다. 그리고 이로부터 산출된 리스크 요인별 위험정도는 WBS 코드체계 기반으로 4D CAD의 공종과 연계되어 리스크 정도 수준에 따라 설정된 색상으로 시뮬레이션이 구현되도록 구성하였다. 이러한 방법론은 IDEF0 모델링 기법으로 제시함으로써 향후 시스템 구축의 기초 자료로 활용할 수 있도록 하였다.

  • PDF

Introduction of the Best Practices in the Pakistan Gulpur HEPP (파키스탄 Gulpur 수력발전 현장의 Best Practices 소개)

  • JANG, Ock Jae;HONG, Won Pyo;CHAE, Hee Moon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.216-217
    • /
    • 2022
  • Gulpur 수력발전 프로젝트는 전력난을 겪고 있는 파키스탄에 102 MW 규모의 수력발전소를 건설하여 30년 동안 운영 관리한 후 파키스탄 정부로 양도하는 IPP(Independent Power Producing) 형식의 투자사업이다. 남동발전과 DL E&C, 롯데건설이 Sponsor로서 출자한 자본금과, ADB, IFC, K-EXIM 등의 대주단로부터의 차입금을 재원으로 하여 소요 사업비를 조달하고 사업을 개발하였다. DL E&C와 롯데건설이 EPC(Engineering, Procurement, Construction)를 수행하였고, 이산이 Design consultant의 역할을 수행하였다. Gulpur 수력발전 프로젝트의 발전형식은 수로식(run-of-river)으로 201 m3/s의 발전유량과 102 MW의 발전 시설용량을 이용하여 연평균예상발전량은 398 GWh이다. 주요 구조물로는 설계 재현빈도 1년의 유수전환시설(가물막이댐 & 가배수터널)과 콘크리트 중력식댐(H 67 m, L 205 m), 도수터널(D 6.7 m, L 215 m, 2기), 옥외형 발전소 (H 51 m, W 60 m, L 38 m, Kaplan 2기)가 있으며, 2015년 10월 착공하여 2020년 3월 상업발전을 시작하였다. 본 프로젝트는 DL E&C의 첫 번째 EPC 해외수력발전 프로젝트이다. 따라서 프로젝트의 성공적 수행을 위한 경제적 설계, 시공의 효율성 및 안정성 확보 등을 위하여 많은 연구를 수행하는 과정에서 다양한 기술 개선을 이룰 수 있었다. 본고에서는 Gulpur 프로젝트를 통하여 도출된 성공 사례들을 소개 및 공유하고자 한다. 첫 번째로 콘크리트 중력식댐 시공을 위한 유수전환시설의 최적 설계빈도를 산정하였다. 일반적으로 유수전환시설의 규모는 설계기준에 제시된 설계 재현빈도를 이용하는데, 해외 설계기준에서는 10년, 국내 설계기준에서는 1~2년으로 다르게 제시되어 있는 문제점이 있다. 유수전환시설의 규모는 프로젝트의 경제성에 큰 영향을 미치기 때문에 최적 설계빈도의 결정이 필요하며, 위험도분석기법(Risk Analysis)과 기대화폐가치법(Expected Monetary Value)을 이용하여 유수전환시설의 최적 설계 재현빈도와 이에 영향을 미치는 인자를 분석하였다. 위험도는 몬테카를로 시뮬레이션으로 산정된 가물막이댐 파괴확률과 재현빈도를 이용하여 산정된 가물막이댐 월류확률을 고려하였으며, 비용 및 피해액으로는 유수전환시설의 공사비, 가물막이댐 파괴시의 재건설비용과 지체보상금, 가물막이댐 월류시의 복구비용을 고려하였다. 이에 대한 연구결과로, 유수전환시설의 사용기간과 월류시의 복구비용이 유수전환시설의 설계 재현기간 결정에 가장 큰 영향을 미치는 것으로 나타났고, 특히 월류시의 복구비용이 작을수록 낮은 설계 재현빈도를 선택하는 것이 타당한 것으로 나타났다. 예를 들어, 유수전환시설의 사용기간이 3 ~ 5년, 복구비용이 0.5 ~ 1.0 mil USD 이하인 조건에서 가물막이시설의 최적 설계빈도는 1년 ~ 2년인 것으로 나타났다. 또한, 유수전환시설의 사용기간은 본댐의 규모와 시공기간 등을 고려하여 결정되는 사항으로 설계자가 임의 조정할 수 없지만, 복구비용은 시공 관리자에 따라 결정되는 부분으로, 적극적 홍수 피해 저감 및 복구방안을 마련하는 것이 프로젝트의 경제성을 향상시킬 수 있다는 것을 알 수 있었다. 두 번째로 프로젝트의 경제성 향상, 홍수기 댐 시공시의 안전성 확보를 위하여 홍수 조기경보시스템(Early Warning System)을 개발 및 활용하였다. 수로식(Run-of-river) 수력발전댐은 대부분 산악지역에 위치하기 때문에 국지성 강우 및 급한 지형 경사로 인하여 돌발홍수(flash flood)의 발생 가능성이 높다. 따라서 시공 중 홍수(월류) 발생을 미리 감지하고 현장에 전파할 수 있는, 수로식(Run-of-river) 수력발전댐 현장을 위한 홍수 조기경보시스템이 필요하며, 이를 리스크 인식, 모니터링 및 경보, 전파 및 연락, 반응 능력 향상의 4가지 부분으로 나누어 구축하였다. 리스크 인식 부분에서는 가물막이댐 월류 발생 상황에 대한 위험도, 취약성, 리스크를 제시하였으며, 모니터링 및 경보 부분에서는 상류 측정수위에서 유도된 현장 예상수위와 실제 현장 측정 수위를 대상으로 경보홍수위와 위험홍수위로 나누어 관리하였다. 전파 및 연락 부분에서는 현장 시공 조직을 활용하여 홍수시를 대비한 비상연락체계도(Emergency communication flow chart)를 운영하였으며, 반응 능력 향상을 위해 비상연락체계도의 팀별 Action plan을 상세화 하였다. 세 번째로 현장의 지질특성과 50여 차례 발파시험으로 현장 고유의 발파진동감쇄곡선을 도출하였으며, 이를 통해 현장의 시공성과 콘크리트 품질 확보를 동시에 달성할 수 있는 방안을 제시하였다. 콘크리트댐 공사에서는 제한된 공기 내에 공사를 완료하기 위해 사면부 굴착과 콘크리트 타설이 동시에 수행될 수밖에 없는 문제점을 가지고 있다. 그러나 신규 콘크리트 타설면 근처에서 발파를 수행하는 경우 발파로 발생되는 탄성파가 일정 수준을 초과하게 되면, 콘크리트 양생에 영향을 주게 된다. 따라서 다수의 현장 발파시험을 통해 발파거리와 최대진동속도의 상관관계 즉, 발파진동감쇄곡선을 도출함으로써 현장의 발파진동특성을 도출할 수 있었다. 또한, 기존 연구 논문들을 통해 콘크리트 재령기간 별 안전진동속도를 선정하고, 해당 안전진동속도를 초과하지 않는 범위에서 콘크리트 타설면과 발파위치의 거리에 따라 1회 발파 가능한 장약량을 산정하여 적용하였다. 이와 같은 체계적인 접근을 통해 콘크리트 타설과 발파 작업 동시 수행에 대한 논란을 해소할 수 있었다.

  • PDF

Research for improving quality of SI(System integration) development project (시스템 통합(SI) 구축 사업 품질 향상을 위한 연구)

  • Kim, Seok-Kwan;Ryu, Gab-Sang
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.11 no.3
    • /
    • pp.215-220
    • /
    • 2018
  • This paper limited the participation of large corporations in the mass information market by revising the Software Industry Promotion Act in order to increase business opportunity, equality of opportunity, and capacity building for small and medium sized IT companies. However, it is a fact that the medium and small SW companies have insufficient business capacity and expose various problems such as quality degradation of public information business, inadequate risk management, and deterioration of schedule management. In order to solve this problem, this paper derived the factors of quality deterioration in the system integration project and proposed to carry out the project by using some activities of VISUALIZATION, rigorous test management and Agile Methodology as a solution. Applying these measures to healthcare IT projects developed by midsize / small-sized IT companies has improved communications, improved quantitative progress management and improved project visibility. In addition, it contributed to minimizing defect resolution time, improving the requirement coverage ratio, and shortening unnecessary meeting time.