• Title/Summary/Keyword: 프로젝트 완성도

Search Result 137, Processing Time 0.019 seconds

The Impact of the Perceived Level of Problem Solving on the Performance of Project Completeness in Programming Education (EPL을 활용한 프로그래밍 교육에서 문제해결 수준이 프로젝트 완성도에 미치는 영향)

  • Jang, Yun-Jae;Kim, Ja-Mee;Lee, Won-Gyu
    • The Journal of Korean Association of Computer Education
    • /
    • v.14 no.6
    • /
    • pp.41-51
    • /
    • 2011
  • Informatics curriculum has been revised for informatics principles and concepts to effectively teach. According to the revised curriculum, researches are verifying the educational effects of algorithmic thinking and problem-solving abilities using programming language by applying it to various area. However, researches in programming education considering the level of student are yet incomplete. This research has analyzed the impact of the perceived level of problem solving on the performance of project completeness. As results of difference of project completeness, a high perceived level of problem solving group's performance of project completeness was higher than a low perceived level of problem solving group's one. Analysis of the impact of the perceived level of problem solving on the performance of project completeness, 'problem finding' factor had a significant impact. This research suggested the importance of 'problem finding' and self-reflecting introspective 'reviewing' stages in problem solving process using programming language.abstract of your study in English. This space is for the abstract of your study in English. This space is for the abstract of your study in English.

  • PDF

산학일체형 교육 경험으로부터의 IT교육 지원정책 제안

  • 김태희
    • Communications of the Korean Institute of Information Scientists and Engineers
    • /
    • v.22 no.5
    • /
    • pp.19-23
    • /
    • 2004
  • IT 또는 소프트웨어 교육에 있어서 완성도 있는 프로젝트를 생산하도록 하는 프로젝트 수행중심의 교육이 적합한 것은 해당 교육계에서 공감대를 형성하고 있으며 바람직한 대학의 커리큘럼이 구체적으로 제시되기도 하였다. 이러한 인식의 선상에서 정부의 지원정책이 방향을 잡은 것은 비교적 최근의 일이라고 생각된다. 이에 따라 많은 대학에서 프로젝트 수행중심의 교육을 시도하고 있으며 이는 매우 고무적인 것으로 받아들여질 수 있다.

An Exploratory Study of ERP System Implementation: Relationships between Completeness of Each Phase and its Impact on System Performance (ERP 시스템의 구축에 있어 단계별 완성도간의 관계분석 및 시스템 성과에 미치는 영향)

  • Park, Moon-Kyu;Lee, Jae-Jung;Jeong, Seung-Ryul
    • Information Systems Review
    • /
    • v.4 no.2
    • /
    • pp.237-255
    • /
    • 2002
  • In this study, we develop a four phase model of ERP implementation, which includes Chartering phase, Project phase, Shakedown phase, and Onward and upward phase. We then examine how the completeness of each phase influences the implementation success as well as the completeness of next phase. The results of this study show that project phase and onward and upward phase both have significant impacts on the implementation success. We also find that all relationships between the completeness of previous phase and next phase are significantly positive.

Applying rework indicator to control software development project (소프트웨어 개발 프로젝트 제어를 위한 재작업 지표의 적용)

  • Han Hyuk-Soo;Kim Han-Saem
    • The KIPS Transactions:PartD
    • /
    • v.13D no.1 s.104
    • /
    • pp.61-66
    • /
    • 2006
  • It is reported that the success ratio of software development projects has been only 30%. Many causes lower project's chance of success, particularly lack of systematic project management. Especially, moving on the next phase of project with unsatisfactory outputs can be very problematic because it can cause much waste of resource, time and even lead to the failure of the whole project. Peer review and inspection are some of the practices designed to prevent such waste and possible failure. When defects are identified through such progress, each developer has to work on the product component again and fix the problem. This process is called rework. In this paper, we propose a method for improving quality of reworked product component to prevent excessive cost and time consumed caused by moving on the next phase of a project with a problematic product component. More specifically, this paper suggests a rework indicator that measures the level of rework based on its complexity and severity and is used to choose appropriate checking method on reworked product component. The research also confirmed the method's usefulness and effectiveness by applying the suggested method on four projects.

프로젝트 원가 관리

  • 박순규
    • JOURNAL OF ELECTRICAL WORLD
    • /
    • s.329
    • /
    • pp.41-50
    • /
    • 2004
  • 프로젝트 원가 관리에는 해당 프로젝트가 승인된 예산 내에서 완성되도록 하기 위하여 자원기획, 원가산정, 원가예산편성 및 원가통제의 프로세스로 구성된다.

  • PDF

A Study On A Test Automation Design Model Based On V Model (V모델 기반의 테스트 자동화 설계 모델에 대한 연구)

  • Choi, Ji-Hoon;Park, Koo-Rack;Park, Won-Cheol
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2020.07a
    • /
    • pp.593-594
    • /
    • 2020
  • 본 논문은 급격하게 발전하는 IT기술의 발전과 그로 인한 기업들의 경쟁 속에서 수 많은 프로젝트들이 생성되는 현대 사회에서 이런 프로젝트들이 경쟁에서 이길 수 있도록 프로젝트가 빠르고 완성도 있게 만들어질 필요를 느끼고 기존의 프로젝트 개발 방법론과 테스트 설계 방법론 중 V모델을 연구해서 프로젝트 관리 시스템에 등록된 데이터를 기반으로 테스트가 자동 설계될 수 있게 함으로써 프로젝트 전체 기간을 줄이고 프로젝트 비용을 줄일 수 있는 방법을 제안한다. 이 논문에서 제안하는 모델을 확장시켜서 프로젝트 테스트 관리에 불필요한 설계 시간과 테스트 관리에 수월할 것이라 기대한다.

  • PDF

The Present Condition of Risk Management for Software Development Project in Korea. (한국의 소프트웨어 개발 프로젝트 위험 관리 현황)

  • 류나정;고석하
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 2003.11a
    • /
    • pp.489-503
    • /
    • 2003
  • 잘못되거나 불확실한 결과가 예상되는 프로젝트를 계속 지속하는 행위는 어떠한 분야의 프로젝트에서도 발견 할 수 있는 보편적인 현상이다. 그러나 소프트웨어 개발 분야는 그러한 어떠한 분야보다도 이 문제에 더 민감하며 그 파급효과 또한 크다. 그 이유는 소프트웨어 그 자체가 형태를 가지고 있지 않아 프로젝트 진행 도중에는 그 완성도를 예측하기가 무척 어렵기 때문이다. 또한 소프트웨어는 프로젝트범위가 자주 변동되기 때문에 통제와 관리에 어려움이 많다. 이런 이유로 소프트웨어 개발 생명주기의 각 단계에서 발생하는 위험 요소들을 찾아 그 위험 요소들이 발생했을 때 프로젝트에 미치는 영향정도 파악하여 그 해당위험 요소에 대응하는 방안들을 모색하는 것이 피해를 줄이기 위해 가장 최선의 방법이다. 본 논문에서는 위에서 거론된 소프트웨어 위험 관리에 대한 관련 문헌을 조사, 검토하고 설문을 통해 조사한 실무자들의 경험을 바탕으로 위험에 대한 인식과 대응 반응을 파악하고 연구하고자 한다. 소프트웨어 프로젝트 계획 단계에서 위험 요소가 추후 발생할 것을 예측하여 실제로 위험 요소가 발현했을 때, 적극적으로 대처 할 수 있는 방법을 찾아 해당 위험이 주는 영향을 최소화 할 수 있는 방법을 찾고자 한다.

  • PDF

인간프로테옴 프로젝트 - 지놈프로젝트 이을 생물공학의 대역사

  • Korean Federation of Science and Technology Societies
    • The Science & Technology
    • /
    • v.33 no.7 s.374
    • /
    • pp.32-36
    • /
    • 2000
  • 2000년 여름 인간 유전자지도 초안 완성과 더불어 마무리 단계에 와있는 인간 지놈프로젝트는 머지않아 생물학의 기본적인 해답을 줄 수 있는 인간 프로테옴프로젝트로 대체될 것이다. 세포의 주요한 기능은 단백질의 복잡한 연쇄작용으로 이뤄지는데 이런 과정을 이해함으로써 암과 당뇨병 치료용의 더 좋은 약품을 개발하는 새로운 전기를 마련할 것이다.

  • PDF

Verification of the Difference in Project Completing Abilities Depending on a Learning Style using an Educational Programming Language (교육용 프로그래밍 언어를 활용한 학습에서 학습양식에 따른 프로젝트 완성 능력의 차이 검증)

  • Jang, Yun-Jae;Kim, Ja-Mee;Lee, Won-Gyu
    • The Journal of Korean Association of Computer Education
    • /
    • v.14 no.1
    • /
    • pp.1-12
    • /
    • 2011
  • Educational Programming Language has been reported to expand thinking ability and to give help in creative problem solving ability by numerous researches. Researchers are verifying the educational effects of EPL by applying it to various area, but researches in effective application of EPL is yet incomplete. Thus, for effective application of EPL, this research has verified the project completing ability depending on studying style targeted to college senior students. As results of verification, first, the results showed significant differences in project completing abilities depending on information processing methods, and learners who preferred self-reflecting introspection showed high scores. Second, in learning style the divergers showed the highest scores. This research suggested the necessity of guidance and detailed planning of self-reflecting introspective activity in ideas that would be realized by learners through searching for factors that could enhance the degree of project completion in programming learning using EPL.

  • PDF