• Title/Summary/Keyword: 프로젝트 스케줄링

Search Result 19, Processing Time 0.023 seconds

Development of a Heuristic Algorithm Based on Simulated Annealing for Time-Resource Tradeoffs in Project Scheduling Problems (시간-자원 트레이드오프 프로젝트 스케줄링 문제 해결을 위한 시뮬레이티드 어닐링 기반 휴리스틱 알고리즘 개발)

  • Kim, Geon-A;Seo, Yoon-Ho
    • The Journal of Information Systems
    • /
    • v.28 no.4
    • /
    • pp.175-197
    • /
    • 2019
  • Purpose This study develops a heuristic algorithm to solve the time-resource tradeoffs in project scheduling problems with a real basis. Design/methodology/approach Resource constrained project scheduling problem with time-resource tradeoff is well-known as one of the NP-hard problems. Previous researchers have proposed heuristic that minimize Makespan of project scheduling by deriving optimal combinations from finite combinations of time and resource. We studied to solve project scheduling problems by deriving optimal values from infinite combinations. Findings We developed heuristic algorithm named Push Algorithm that derives optimal combinations from infinite combinations of time and resources. Developed heuristic algorithm based on simulated annealing shows better improved results than genetic algorithm and further research suggestion was discussed as a project scheduling problem with multiple resources of real numbers.

Project Scheduling for Object-Oriented Development in Matrix Organization (유전자 알고리즘을 이용한 매트릭스조직의 객체지향개발 프로젝트 스케줄링)

  • Lee, Gun-Ho;Kim, Uen-Jin
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.5
    • /
    • pp.67-78
    • /
    • 2007
  • This paper discusses a scheduling problem on object-oriented developments over multiple teams with limited resources in matrix organization. The objective of the problem is to minimize the makespan of overall projects. There are tangible and intangible advantages such as efficient resource share, improvement of productivity, development efforts and cost reduction, etc. by dispatching resources properly to the development teams. Traditionally, the project scheduling has been done with a manager's intuition or heuristic. We present a scheduling model with illustrative examples, stochastic search approach, and apply a variety of problems generated randomly to the approach. The results are analysed.

Real-Time Data Stream Management System Using State Thread (State Thread 기반 실시간 데이터 스트림 관리 시스템)

  • Park, Won-Vien;Song, Chang-Geun;Ko, Young-Woong
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2010.11a
    • /
    • pp.177-180
    • /
    • 2010
  • RFID를 기반으로 유비쿼터스 환경의 응용 서비스를 지원하는 미들웨어는 지속적으로 끊임없이 입력되는 데이터 스트림을 실시간으로 처리하고 응용 서비스에서 요구하는 결과를 획득하여 전달해야 한다. 이와 같은 요구사항을 만족하기 위해 데이터 스트림 관리 시스템(DSMS)이 제안되었으며 다양한 연구가 시도되고 있다. 본 논문에서는 대량의 이벤트가 입력되는 환경에서 우선순위가 높은 질의를 실시간으로 처리하기 위한 DSMS를 제안하고 있다. 본 연구는 스탠포드의 STREAM 프로젝트를 활용하여 설계 및 구현하였으며, 각 쿼리를 State Thread로 동작시키는 방법을 이용하였다. 쓰레드 라이브러리의 스케줄러 부분을 실시간 스케줄러로 개선하는 작업을 진행하였으며, 실험을 통하여 쓰레드 스케줄러가 질의에 대해서 실시간으로 스케줄링을 할 수 있음을 보이고 있다.

Research on the Strategy for Outsourcing in Construction Projects: in Fast-track Project (건설프로젝트에서 전략적 하도급 방안에 관한연구 : 설계시공병행방식 사례를 중심으로)

  • Choi, Soo-Ho;Choi, Hyun-Chul;Choi, Hye-Mi;Kim, Ju-Hyung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.551-559
    • /
    • 2014
  • Fast-tracking was developed as an optimizing method to shorten the duration of construction project in 1960's, and it introduced to Korea in 1999. Since then, many Korean companies have been used fast-tracking for getting economical benefit from shorten duration. However, there were some problems(dispute, delay and cost overrun) because of using inappropriate subcontractor management system. For this reason, previous studies suggested some management models to solve these problems. Unfortunately, however, the models have been had some doubts about reliability, objectivity and possibility of using them on real construction site. Therefore, this study suggests 3 steps of strategic subcontracting method and apply it on real fast-tracking practice(L company) to secure reliability and objectivity. Through this, the method is expected to make up the doubts of previous studies.

Research Trends of Mixed-Criticality System (중요도 혼재 시스템의 연구 동향 분석)

  • Yoon, Moonhyung;Park, Junho;Kim, Yongho;Yi, JeongHoon;Koo, BongJoo
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.9
    • /
    • pp.125-140
    • /
    • 2018
  • Due to rapid development of semiconductor technology, embedded systems have been developed from single-functional system to the multi-functional system. The system composed of software that has different criticality level is called Mixed-Criticality System. Currently, the project related to the Mixed-Criticality System is accelerating the efforts to seek the development direction and take technical initiatives led by EU and USA where the related industry has developed, but the movement in Korea is yet insignificant. Therefore, it is urgent to perform the research and project of various basic technologies to occupy the initiative for the related technology and market. In this paper, we analyze the trends of major project researches and developments related to the MCS. First, after defining the definition of the MCS and system model, we analyze the underlying technology constituting the MCS. In addition, we analyze the project trends of each country researching MCS and discuss the future research areas. Through this study, it is possible to grasp the research trends of the world in order to establish the research direction of the MCS and to lay the foundation for the integration into the military system.

An Efficient Algorithm for Finding the Earliest Available Interval on Connection-Oriented Networks (연결 지향 네트워크에서 최초 가용 구간을 찾는 효율적인 알고리즘)

  • Chong, Kyun-Rak
    • Journal of the Korea Society of Computer and Information
    • /
    • v.15 no.3
    • /
    • pp.73-80
    • /
    • 2010
  • The advancement of communication and networking technologies has enabled e-science and commercial application that often require the transport of large volume of data over wide-area network. Schedulable high-bandwidth low-latency connectivity is required to transport the large volume of data. But the public Internet does not provide predictable service performance. Especially, if data providers and users are far away, dedicated bandwidth channels are needed to support remote process efficiently. Currently several network research projects are in progress to develop dedicated connectionsy sA bandwidth scheduler computes an user requested path based on network topology information and link bandwidth allocationsy In this paper, we have proposed an efficient algorithm for finding the earliest time interval when minimum bandwidth and duration are giveny Our algorithm is experimentally compared with the known algorithm.

A study on realtime Job Scheduling for Portable Devices (포터블 기기의 실시간 처리를 위한 Job Scheduling에 관한 연구)

  • 장석우;박인규
    • Proceedings of the IEEK Conference
    • /
    • 1999.11a
    • /
    • pp.989-992
    • /
    • 1999
  • Battery로 작동되고, 소형인 제품들도 다양한 기능은 물론이고, 다양한 입출력 장치를 갖추고, 실시간으로 처리하는 시스템이 많이 요구되고 있는 실정이며, 점차 더욱 더 요구될 것으로 전망된다. 더욱이 포터블 기기는 일반적으로 MCU의 내부에 제한된 ROM type 메모리를 내장하게 되면, 데이터 메모리로 SRAM 및 flash memory를 갗추고 있다. 따라서 이러한 제한된 하드웨어 환경하에서 많은 기능을 수행해야 하는 경우가 많다. 여러 기능을 시간적인 간격으로 배분하거나, 기능 자체를 서로 배분하면서, 서로 융합하는 등의 여러 가지 기능을 수행하려다보면, 당연히 메인 소프트웨어 구조가 복잡해지며 대부분 어셈블리나 C와 같은 linear한 구조를 가지는 language로 개발되기 때문에 효과적인 프로그램 구조를 세우기는 쉽지 않다. 본 논문에서는 이를 위해 좀더 규격화된 방법을 제시하고자 한다. 보다 구체적인 구조를 연구할 목적으로 다양한 테스크를 수행하여야 하는 시스템이면서 프로세서가 필요한 포터블 기기의 한 응용 제품인 MP3 Player 에서 요구되는 job scheduling을 연구한다. 필요한 작업의 종류는 가장 부하가 많이 걸리는 압축된 MP3 file을 다시 복원시켜주는 codec 부분과 일정 시간 간격을 가지고 수행하여야 하는 외부 키보드 입력과 실시간으로 시간을 계산하는 타이머 기능, 그리고 LCD에 시간의 변화를 표시하여 주어야한다. 이와같이 수시로 작업이 발생하지만 시간 점유율이 중간 정도인 LCD 컨트롤과 메모리 컨트롤 등이다. 프로세서의 속도를 최소한으로 줄이면서 스케줄링에 의해 시간 문제를 해결하는 방법을 제시하도록 한다. 이는 기초과학 수준이 높은 북방권 국가들의 과학자들이 주로 활용되고 있다는 점에서도 잘 알 수 있으며 우리의 과학기술 약점을 보완하는 원천으로써 외국인 연구 인력이 대안이 되고 있음을 시사한다. 본 연구에서는 한국 연구 조직에서 일하는 외국인 연구자들의 동기 및 성과에 영향을 미치는 많은 요인들을 확인할 수 있었다. 상관관계, 분산분석, 회귀분석 등을 통해 활용 성과에 미치는 영향 요인들을 도출하였다. 설문 분석을 통하여 동기 및 성과 사이에는 강한 상관관계가 존재하는 것을 확인할 수 있었으며 이는 전통적인 동기 이론들과 부합한다. 대부분의 변수가 동기 및 성과에 동시에 영향을 미치는 것으로 조사되었으며 그중에서도 조직 협력 문화, 외국인 연구자의 의사소통 및 협력성, 외국인 연구자의 연구 능력 관련 변수들 및 연구 프로젝트의 기술수명주기, 외국인 연구자의 기존 기술지식의 흡수 등이 가장 중요한 변수로 나타났다. 이는 우리가 주로 중국 및 러시아 과학자들을 활용하여 상업화하는 외국인 연구인력 활용 패턴과도 일치하는 결과이다. 즉 우호적인 조직문화를 가지고 있는 연구 조직에서, 이미 과학기술 지식을 많이 가지고 있고 연구 능력도 높은 외국인 과학기술자를, 한국에서 기술이 태동 또는 성장하고 있는 연구 분야에서 활용하는 것이 가장 성과가 좋다는 사실을 확인시켜 주고 있다. 국내에서 최초로 수행된 본 연구는 외국인 연구 인력의 활용 성과가 매우 높으며, 우리의 과학기술혁신시스템을 보완하는 유효한 수단으로써 외국인 연구 인력이 중요한 대안이 될 수 있음을 발견하였다. 외국인 연구 인력을 잘 활용하기 위하여 문제점 및 개선방안을 활용 환경, 연구 인력이 중요한 대안이 될 수

  • PDF

A Study on the Electronic Potential Occurrance and Delevery Specific Property by ionic Density Transformation (이온농도 변화에 따른 뉴런의 전위발생과 전달특성에 관한 연구)

  • 김석환;류광렬;허창우
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 1999.11a
    • /
    • pp.509-515
    • /
    • 1999
  • 신체를 구성하는 여러 가지 요소 중에서 인간이 일상생활을 하는 데에는 신진대사를 일정하게 유지하기 위한 인체내의 여러 가지 전달물질들이 그 구성에 맞게 역할을 수행하여야 한다. 그러나, 만약 그 구성 비율이 바뀔 때에는 인체 내에 이상이 발생하게 된다. 그 대표적인 예로는 운동을 심하게 하였을 경우 갈증과 근육의 피로감이 몰려오게 되는데 이는 세포내의 이온농도의 변화에 의한 것이며 이때 물, 스포츠 이온 음료 등을 섭취한다. 순간적으로 그 증상이 회복되지는 않지만 신경계 내에서 회복하는데 에는 많은 시간이 소요된다. 생리학, 임상적으로 나트륨과 물은 신진대사에 밀접한 연관이 있다. 인체의 나트륨은 음식물의 섭취량과 나트륨의 생리작용사이의 균형에 좌우된다. 건강한 상태에서 나트륨의 생리적인 손실은 무시할 만 하며 나트륨 생리작용은 음식물의 섭취량과 밀접한 관련이 있다. 칼륨은 단지 전체 신경계 용질의 일부이기 때문에 이것은 세포의 체적과 세포 용질의 삼투현상을 결정하는 주요한 것이다. 더욱더 칼륨은 신진대사 과정의 많은 중요한 변수가 되며, 세포밖의 칼륨은 전체중에 매우 작은 일부이긴 하지만 신경근육 작용에 매우 큰 영향을 준다. 세포안과 밖의 칼륨의 농도 비율은 흥분성 조직내의 막 전위의 주요한 결정요소가 된다. 본연구에서는 세포막 설계 후 시뮬레이션을 통한 정상상태의 세포막 전위의 활동전위 전달 특성과 Na, K의 이온 농도를 변화시킬 경우의 세포막 전위의 활동저위 전달 특성곡선을 비교 관찰하여 운동 생리학적인 신경세포내의 전달특성 메카니즘을 이해, 분석하였다.서의 속도를 최소한으로 줄이면서 스케줄링에 의해 시간 문제를 해결하는 방법을 제시하도록 한다. 이는 기초과학 수준이 높은 북방권 국가들의 과학자들이 주로 활용되고 있다는 점에서도 잘 알 수 있으며 우리의 과학기술 약점을 보완하는 원천으로써 외국인 연구 인력이 대안이 되고 있음을 시사한다. 본 연구에서는 한국 연구 조직에서 일하는 외국인 연구자들의 동기 및 성과에 영향을 미치는 많은 요인들을 확인할 수 있었다. 상관관계, 분산분석, 회귀분석 등을 통해 활용 성과에 미치는 영향 요인들을 도출하였다. 설문 분석을 통하여 동기 및 성과 사이에는 강한 상관관계가 존재하는 것을 확인할 수 있었으며 이는 전통적인 동기 이론들과 부합한다. 대부분의 변수가 동기 및 성과에 동시에 영향을 미치는 것으로 조사되었으며 그중에서도 조직 협력 문화, 외국인 연구자의 의사소통 및 협력성, 외국인 연구자의 연구 능력 관련 변수들 및 연구 프로젝트의 기술수명주기, 외국인 연구자의 기존 기술지식의 흡수 등이 가장 중요한 변수로 나타났다. 이는 우리가 주로 중국 및 러시아 과학자들을 활용하여 상업화하는 외국인 연구인력 활용 패턴과도 일치하는 결과이다. 즉 우호적인 조직문화를 가지고 있는 연구 조직에서, 이미 과학기술 지식을 많이 가지고 있고 연구 능력도 높은 외국인 과학기술자를, 한국에서 기술이 태동 또는 성장하고 있는 연구 분야에서 활용하는 것이 가장 성과가 좋다는 사실을 확인시켜 주고 있다. 국내에서 최초로 수행된 본 연구는 외국인 연구 인력의 활용 성과가 매우 높으며, 우리의 과학기술혁신시스템을 보완하는

  • PDF

Development of Building Monitoring Techniques Using Augmented Reality (증강현실을 이용한 건물 모니터링 기법 개발)

  • Jeong, Seong-Su;Heo, Joon;Woo, Sun-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.3-12
    • /
    • 2009
  • In order to effectively distribute the resources, it is very critical to understand the status or progress of construction site quickly and accurately. Augmented Reality (AR) can provide this situation with information which is convenient and intuitive. Conventional implementation of AR in outdoor or construction site condition requires additional sensors or markers to track the position and direction of camera. This research is aimed to develop the technologies which can be utilized in gathering the information of constructing or constructed buildings and structures. The AR technique that does not require additional devices except for the camera was implemented to simplify the system and improve utility in inaccessible area. In order to do so, the position of camera's perspective center and direction of camera was estimated using exterior orientation techniques. And 3D drawing model of building was projected and overlapped using this information. The result shows that by using this technique, the virtual drawing image was registered on real image with few pixels of error. The technique and procedure introduced in this paper simplifies the hardware organization of AR system that makes it easier for the AR technology to be utilized with ease in construction site. Moreover, this technique will help the AR to be utilized even in inaccessible areas. In addition to this, it is expected that combining this technique and 4D CAD technology can provide the project manager with more intuitive and comprehensive information that simplifies the monitoring work of construction progress and planning.