• Title/Summary/Keyword: 프로젝트 경영

Search Result 557, Processing Time 0.027 seconds

An Information System Implementation Case Research on Korea Train eXpress (고속철도에 있어서의 정보시스템 구현 사례에 대한 연구)

  • Lee, Sung-Ho;Ahn, Joong-Ho
    • Information Systems Review
    • /
    • v.7 no.2
    • /
    • pp.1-21
    • /
    • 2005
  • Integrated Railroad Information System(IRIS) Construction Project is one of the super projects in Korea required to invest over 100 billion won and 10,000 engaged manpower until Dec 30, 2004. Composition of this paper is as follows; firstly, examined individual contents and aspects of IRIS, and studied formality and contents that have been based to project methodology for successful propulsion of project in overall situation of SI project progress until present. Secondly, presented for construction background of IRIS as well as Project Management and Project Development Methodologies. Thirdly, described each characteristic and development substance for individual systems after present whole contents and system image of the system. Finally, presented successful propulsion result of this project and development directions. We presented development example laying stress on IRIS's Project contents and propulsion circumstances. Evaluation about operation results should be analyzed and studied in detail operating system from now on.

A Study on Model for Evaluating ERP Project from Customer and Consulting Firm Perspectives using AHP (AHP를 활용한 고객사와 컨설팅사의 ERP 프로젝트 평가모형 연구)

  • Jeong, Hee-Yeon;Lee, Jonh Hearn
    • Information Systems Review
    • /
    • v.8 no.1
    • /
    • pp.241-263
    • /
    • 2006
  • Since 1995 many enterprises have introduced ERP to strengthen competitive power. However, enterprises that have introduced ERP for the first time have experienced various types of problems integrating them; to this day, there are only a few enterprises that have implemented ERP successfully. The main reason for the failures of successful ERP implementing is that enterprises frequently ignore and/or don't know how to systematically evaluate the construction process of ERP and busy finishing a phase without resolving problems before going on to the next phase. This research focused on the implementation process of ERP project to evaluate the process of ERP at each phase. As a result, we propose an evaluation model of ERP project as a tool to find critical problems at each phase and improve on how to resolve the problems found at each phase. This evaluation model makes it possible to introduce ERP successfully by presenting the basis of assessment which will be used by enterprises to minimize the trial and error of construction process of ERP.

Team Project Activity and Satisfaction in Business Education (경영학 수업에서 팀 프로젝트활동과 수업만족에 관한 연구)

  • Suk, Yeung-Ki
    • Journal of Digital Convergence
    • /
    • v.12 no.7
    • /
    • pp.217-227
    • /
    • 2014
  • Since 2010, the universities in Korea have been faced severe difficulties on the selection of students and on the delivery of high quality education services, as the number of students is reduced and the college entrance rate is declined. To solve these problems, the universities have introduced the various and professional education services such as team-based projects, case study, e-learning, action learning, etc. The purpose of this study is to examine the effect of team-based project learning on the student's satisfaction in business education. The 4 factors(team cohesiveness, teamwork, team performance and goal achievement) are measured by using questionnaire survey and data are collected from 134 students(34 teams) for 4 subjects. The results show that the structure of team cohesiveness${\rightarrow}$teamwork${\rightarrow}$student's satisfaction is statistically significant, and that team performance and goal achievement are not significant. The student's satisfaction in team-based project learning would highly be related with team cohesiveness.

Analysing Decision Making Factors of IT Investment Projects (IT 프로젝트의 기본속성과 사전타당성 분석결과가 투자의사결정에 미치는 영향요인)

  • Koo, Bon-Jae;Lee, Kuk-Hie
    • Information Systems Review
    • /
    • v.9 no.1
    • /
    • pp.161-189
    • /
    • 2007
  • The purposes of this dissertation are to identify various factors affecting the outcomes of feasibility analysis and investment decision makings of new IT project plans and empirically analysis the relationships among them. 9 variables which have been drawn from prior studies and industry practices are the amount of the necessary resource such as development budget and time, the expect financial benefits, the degree of alignments between IT projects and the business strategy, the estimated risk, and the investment priority as the dependent variable. Data from 125 IT projects of K bank, the leading commercial bank in Korea, have been collected and Regression Analysis and ANOVA have been performed. As results, 5 out of 8 hypothesis have been accepted partially or totally.

The Team Structure Design, Team-Coaching, Team Development, and Team Performance of Cross-Functional Project Team (다기능프로젝트팀의 설계, 팀 코칭, 팀 개발과 성과)

  • Park, Jong-Hyuk
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.8
    • /
    • pp.260-273
    • /
    • 2011
  • Utilizing cross-functional project teams is an attractive organizing option, particularly in solving complex and innovative problems that require diverse sources of information, knowledge, and expertise brought by individuals from different functional backgrounds. This study is aiming at finding the group dynamics surrounding and inside the teams for the better understand what makes cross-functional project teams effective. Adopting variables from small group research and organizational context research, I extract critical antecedents, mediator, and team-coaching that lead to team performance. Data from 32 cross-functional project teams consisting of 214 individual respondents are analyzed through regression analyses for hypotheses testing. Results of the analyses demonstrate that the team process and team performance are significantly affected by the composition of competence in team and team compensation. Also I find that team-coaching as a leadership behavior has influence on team process and team performance. Some implications, future research directions, and limitations are discussed.

Analysis of ERP(Enterprise Resource Planning) Implementation and Project Critical Sucess Factor (ERP구축과 프로젝트 구성 성공요인 분석)

  • Kim, Dong-Il;Choi, Seung-Il
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.11
    • /
    • pp.4770-4777
    • /
    • 2011
  • Recently a rapidly changing business environment, business strong ability and operating an integrated information system is actively made. However, the result of the success factors affecting the overall project, but a study to analyze the project's success is not enough. In this study, the project implementation and operation of the critical success factors that can occur in the analysis of research and practice leading to the combination of variables derived from empirical studies find and isolate the success factors were over. Present study came from existing projects that can be the integrated system, representation factors affecting the implementation and operation of business processes in order to analyze the elements and procedures, performance capabilities of the organization, consultants and professionals involved with other related variables were analyzed by injecting. In this study, the consultants and experts showed that the variables are very significant rather than the organization's ability to perform business processes and procedures. This study will give a guideline as future success factors for building an integrated system of professional experiences.

Measuring of the Performance of a Construction Management Project from Viewpoints of Project Participants -Focusing on Owner, Construction Manager, Designer and Constructor- (건설사업 참여주체(발주자, CMr, 설계자, 시공자) 관점에서 건설사업관리 성과측정에 관한 연구)

  • Ahn, Eun-Jin;Yoo, Byeong-Gi;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.194-205
    • /
    • 2008
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But, the each role of participants is Individually changed to step in construction process stage and moreover it has complicated, entangled interests. The CM(so it called Construction Management as an abbreviation word) system was inducted for the effective management and operation of construction project. The key of the CM success depends on the cooperative relationship relation to major participants. There are lots of studies and efforts for the performance measures of the CM, however existing performance index is only measured as the viewpoint of project owner. Therefore it needs to make up for balanced view through combination of the four-way view of participants. In this study, we should search for cooperative relationship of project participants, and then we should suggest to define the difference of project in their viewpoints.

Leader's Authentic Leadership and Follower's Project Performance (진성리더십이 구성원의 프로젝트 성과에 미치는 영향)

  • Tak, Jingyu;Seo, Jeongeun;Roh, Taewoo
    • Journal of Digital Convergence
    • /
    • v.17 no.6
    • /
    • pp.105-112
    • /
    • 2019
  • In addition to the recent business field, the importance of leadership in universities is becoming an increasingly important issue. Purpose of our study is to recommend the significance of authentic leadership by analyzing the effect of leader 's authentic leadership on follower' s project work climate and project performance. As a result of the previous studies that authentic leadership among university students as a quasi-social worker mitigates the role of leader and the tension between the members in the team, this study tries to examine the moderation effect of work climate on the relationship between the follower's authentic leadership and project performance. Therefore, a survey was conducted for students enrolled in some universities. A total of 175 questionnaires were used for the structural equation using STATA 14.0. The results of this study is summarized in three points. Our finding is as follow. The authentic leadership of the leader has a positive influence on the follower' s authentic leadership while the followers' authentic leadership had a positive effect on the project performance.

An Exploratory Study on Conceptual Framework for Project-based Supply Chain Management : Focusing on Plant Engineering Firms (프로젝트형 SCM의 개념적 틀에 관한 탐색적 연구 : 플랜트 엔지니어링 기업을 중심으로)

  • Kim, Tae Ung
    • Journal of Digital Convergence
    • /
    • v.16 no.12
    • /
    • pp.123-135
    • /
    • 2018
  • The objective of this paper is to investigate the issues related to the supply chain management in plant engineering industry, and propose the framework to improve the project efficiency. The preliminary case study shows that EPC's fragmented nature, lack of coordination and information sharing, and lack of proper risk and change management contribute to project delay and cost overrun. To examine the level of informatization and information sharing in supply chain, survey responses from the suppliers and subcontractors have been collected. The statistical results show that information sharing, early involvement in design process and awareness in SCM have influenced the level of collaboration, but supplier assessment and informatization have no impact on the collaboration. A conceptual model is proposed in order to facilitate the integration of design, procurement and construction functions. Implications from the study are also provided.

The Effects of R&D Process Maturity on Product Development Performance: Focused on Mediating Effect of R&D Project Performance (R&D 프로세스 성숙도가 제품개발 성과에 미치는 영향: R&D 프로젝트 성과의 매개효과를 중심으로)

  • Shin, Kyung Sic;Oh, Min Jeong;Kim, Won Ki;Park, So Hyun
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.7 no.7
    • /
    • pp.165-174
    • /
    • 2018
  • The purpose of this study is to verify the effects of R&D process maturity on product development performance and to verify whether R&D project performance mediating effect. The questionnaire was collected and analyzed to 131 persons related to the R&D work in 55 companies and public institutions performing R&D work. The results of this study are as follows, the effect of R&D process maturity on product development performance and mediating effect of R&D project performance were analyzed by simple and multiple regression analysis. Regression analysis was analyzed by SPSS statistical program. The higher the maturity level of the R&D process, the higher the product development performance and the R&D project performance, and the R&D project performance is partially mediated. It is concluded that it is important to establish and operate a systematic R&D process and to develop a project management methodology suitable for the characteristics of a company in order to improve product development performance. It is expected that if this study are utilized as practical R&D management methodology in corporate management, it will contribute to improvement of company product performance.