An exploratory study on the collaboration mechanism in project-based business : focused on supply chain institutions and operational efficiency (프로젝트형 사업에서 협업기제에 대한 탐색적 연구 : 공급망 제도와 운영효율성을 중심으로)

  • Cho, Namhyung
    • Journal of the Korea Convergence Society
    • /
    • v.10 no.10
    • /
    • pp.173-183
    • /
    • 2019
  • The purpose of research is to explore the direction of building a collaborative supply chain, which may enhance the competitiveness of firms and their project-based supply chain. Large-scale plants or large-scale buildings construction is referred to as a EPC project. To identify a collaboration mechanism in the project-based supply chain, the empirical research was conducted on the interrelationship between the absorption capacity of firms participating in the EPC project, the incentive norms, the goal congruence with supply chain, and the ability of respond to changes of the task of supply chain. PLS-SEM was used as an analysis method to verify the research model. It is expected that the results will help inform the need for SCM, the importance of the incentive norms and the goal congruence in the supply chain of EPC project.

An Exploratory Study on Conceptual Framework for Project-based Supply Chain Management : Focusing on Plant Engineering Firms (프로젝트형 SCM의 개념적 틀에 관한 탐색적 연구 : 플랜트 엔지니어링 기업을 중심으로)

  • Kim, Tae Ung
    • Journal of Digital Convergence
    • /
    • v.16 no.12
    • /
    • pp.123-135
    • /
    • 2018
  • The objective of this paper is to investigate the issues related to the supply chain management in plant engineering industry, and propose the framework to improve the project efficiency. The preliminary case study shows that EPC's fragmented nature, lack of coordination and information sharing, and lack of proper risk and change management contribute to project delay and cost overrun. To examine the level of informatization and information sharing in supply chain, survey responses from the suppliers and subcontractors have been collected. The statistical results show that information sharing, early involvement in design process and awareness in SCM have influenced the level of collaboration, but supplier assessment and informatization have no impact on the collaboration. A conceptual model is proposed in order to facilitate the integration of design, procurement and construction functions. Implications from the study are also provided.

A Study on the Change and Improvement of Smart Grid Policy after the Great East Japan Earthquake (동일본대지진 이후 일본 스마트그리드 정책의 변천과 개선방안 연구)

  • Lee, Jum-Soon
    • Journal of Digital Convergence
    • /
    • v.15 no.7
    • /
    • pp.41-53
    • /
    • 2017
  • This study focuses on the current state of Smart Grid policy in Japan and its problems while the interest in Smart Grid has been increasing since the March 2011 earthquake in East Japan. As a result of the analysis, Japan introduced the fixed price buying system of new and renewable energy in response to the power supply and demand problem caused by the 2011 earthquake in East Japan, and established a decentralized green electricity trading market in which electricity generated from new and renewable energy is traded Smart Grid-related projects were implemented as a solution to solve energy crisis and environmental problems at the same time. As a result, we achieved visible results such as suppressing peak power, reducing CO2 emissions, and securing stable supply and demand of energy using renewable energy sources. On the other hand, the improvement of current Smart Grid policy operation in Japan and the introduction of stabilization system of power system, promotion of international standards of domestic technology related to smart grid, and support for strengthening security of smart grid.

An RFID and BIM based Simulator for Construction Material Logistics and Progress Management (RFID와 BIM을 활용한 건설 자재 물류 및 진도관리 시뮬레이터 개발)

  • Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.46-54
    • /
    • 2011
  • There have been research and developments for effective and efficient logistics and progress management in a construction project. Among them, RFID+4D has been developed for the supply chain management of long-lead item materials such as steel component, precast concrete component and curtain wall by integrating RFID with 4D CAD. And the feasibility of RFID+4D has been verified and validated and the benefits in terms of time and cost were shown in several case studies. However, the previous development of RFID+4D has not been adapted widely because of additional modeling cost, non-real time data update, additional labor for data update, and so forth. Therefore, this research has proposed a framework and process for solving these problems. And the web based simulation system has been developed and verified based on the proposed framework. The proposed framework and process can improve the existing RFID+4D system in a construction project by saving its operation cost and utilizing project information more efficiently and effectively. Also it is expected that the proposed framework could be applied to a method transferring design RIM data to construction BIM data.