• Title/Summary/Keyword: 평균 지체

Search Result 223, Processing Time 0.026 seconds

Signal Optimization Model Reflecting Alternative Use of Lanes for Left/Through Traffic at A Signalized Intersection (차로공동이용화를 위한 신호최적화모형 개발 연구)

  • 신언교;홍성표;김동녕
    • Journal of Korean Society of Transportation
    • /
    • v.19 no.3
    • /
    • pp.75-88
    • /
    • 2001
  • Signal optimization model for alternative use of lanes at a signalized intersection with an stop-line added backward was presented in this paper. The simulation results shot-ed that the traffic fed from the stop-line passed the intersection in each specified phasing interval for left and through traffic. The experimental results indicated that the proposed model was much superior to traditional signal optimization methodology in reducing delay, fuel consumption, and disutility index for delay and stops. The effects for reducing delay were greater than those for doing fuel consumption and disutility index due to the added stop-line. The proposed model is expected to alleviate traffic congestion at intersections, both which have no left turn pocket, and which have large left turn volume. The model is recommended to adapted for intersections spaced long among them with no near driveway.

  • PDF

A study on Design and Evaluation of The Continuous Flow Intersection (연속교차로의 설계 및 평가에 관한 연구)

  • 박창수
    • Journal of Korean Society of Transportation
    • /
    • v.17 no.5
    • /
    • pp.79-86
    • /
    • 1999
  • Traffic jams of our country are due to the shortage of roadway as compared with the traffic, however. they are sometimes due to inconsistency of the roadway capacity. Inconsistency of the roadway capacity comes from the difference of cycle length, phase length and number of Phase between major intersection and minor intersection. Specialty increasing number of Phase due to left-turn movements bring out decrease of the arterial capacity, deterioration of the arterial offset. The Purpose of this research is to introduce and analyze the continuous flow intersection to solve the bottleneck of the major intersection. The major contents of this research introduce the concept and design consideration for the continuous flow intersection and also analyze delay, fuel consumption and emissions among multiphase intersection, grade separated intersection and continuous flow intersection. This research analyze the sensitivities according to change of the left-turn traffic volume and also evaluate the cost-effectiveness through the total cost analysis among three of them.

  • PDF

Comparative Analysis on the Delay Between Multi-legged Roundabout and Signalized Intersection (다지 회전교차로와 신호교차로의 지체 비교 분석)

  • Han, Su-San;Park, Byung-Ho
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.9 no.6
    • /
    • pp.83-93
    • /
    • 2010
  • The roundabout is a green transportation system which reduces the accident, the congestion cost and greenhouse effect. The purpose of the study is to analyze the multi-legged roundabout's efficiency. In pursuing the above, this study gives particular attention to building the optimal network of multi-legged roundabout and intersections, developing the scenarios for analysis reflected by the proportion of entering traffic volume of main and minor roads, and comparatively analyzing the average delay per car using VISSIM. The main results are as follows. First, when the entering traffic volume are less than 3,500pcph, the 5-legged single and double-lane roundabout are all analyzed to be more effective than intersection. Second, when the entering traffic volume are less than 3,600pcph, the 6-legged single-lane roundabout is analyzed to be more effective than intersection. The 6-legged double-lane roundabout is analyzed to be more effective than intersection. The 6-legged double-lane roundabout is analyzed to be more effective than intersection in all cases of entering volume.

A New Cross Section Design Concept for Better Efficiency in Two-Lane Highways (2차로도로 효율성 제고를 위한 횡단면 설계 방안)

  • Shim Kywan-Bho;Choi Jai-Sung
    • International Journal of Highway Engineering
    • /
    • v.8 no.2 s.28
    • /
    • pp.75-85
    • /
    • 2006
  • Currently, cross-section design can not reflect highway function and traffic volume, various construction. This research paper provides analysis of traffic accident type, improvement of traffic operation and safety, assessment for new cross-section standards of two-lane highway. Research show higher accident rate on 6$\sim$8.9m road than 9$\sim$12.9m road width in two-lane highway. Typical improvement is widening on lane and shoulder width. Simulation show large increase on 6$\sim$7m road delay-time in 1,200vph. In contrast 10$\sim$11.5m road shows slight change on delay-time. This research paper provides various cross-section construction by traffic volume in minor arterial and distributor two-lane highway. The new cross-section design provides adopting highway volume, various construction and flexibility.

  • PDF

A Study of TPCLT(Twice Per Cycle Left-Turn) Operation Impact at Three-legged Signalized Intersection (3지교차로에서의 연속좌회전(TPCLT)신호운영에 관한 연구)

  • Oh, Jiyeong;Kim, Kicheol;Lee, Choulki;Oh, Insub;Cho, Nammin
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.16 no.3
    • /
    • pp.50-58
    • /
    • 2017
  • TPCLT(Twice Per Cycle Left-turn) operation reduces this left-turn 'spill-over' problem on an as needed basis by servicing the protected left-turn movement as a leading and a lagging left-turn. In this study, to evaluate the effectiveness of TPCLT applied to three-legged signalized intersection in Korea, the analysis was carried out using VISSIM and SSAM model analysis. The study was implemented by three cases which are TPCLT operation, non-TPCLT operation and half-cycle operation using VISSIM program. According to the 9-left-turn volume scenario, total delay and travel times of each case was analyzed by VISSIM program. The study result shows more effective applying TPCLT operaion in the present ~ +50% scenario area at the intersection in terms of total delay.

Safety Enhanced Signal Phase Sequence Design of a Rotary with Five Leg Intersection (5지 신호교차로에서의 안전을 고려한 신호현시 설계)

  • 박재완;김진태;장명순
    • Journal of Korean Society of Transportation
    • /
    • v.20 no.7
    • /
    • pp.23-29
    • /
    • 2002
  • Five and more leg intersections have been still in operation in many urban areas. The number of conflicts in five leg intersection is more than four leg intersection. The signal timing design in the five leg intersection should be performed not only to reduce delay but also to increase safety. This paper suggests safety enhanced signal phase sequence design of a rotary with five leg intersection such as phase sequence minimizing the number of conflict points at the rotary with five leg intersections and the phase-length-design procedure by utilizing the Traffic Network Study Tool(TRANSYT). Field data was collected from Gonguptap five leg intersection in Ulsan and TRANSYT-7F was applied for signal timing design model. Optimal signal phase length and sequence of TRANSYT-7F is rearranged based on the Principal of "two moving traffic flows per phase". In conclusion, proposed signal phase design increased delay by 6.2% compared with the optimal signal phase of TRANSYT-7F. However, it could decrease the number of conflict in the five leg intersection by 61.5%.

유연생산시스템에서 단기생산계획의 혼성기준(Hybrid-threshold)방법론에 대한 연구

  • 김일용;손준영
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1995.09a
    • /
    • pp.349-357
    • /
    • 1995
  • 본 연구에서 혼성기준 어프로치의 성과가 기존 방법론들의 성과를 선형결합 한 직선보다 상당히 아래에 나타나 기존 방법들보다 우월함을 알 수 있다. 뿐만 아니라 일부의 경우에는 배칭 어프로치보다 짧은 평균 리이드 탐임과 유연 어프로치보다 짧은 총생산지체시간을 나타내고 있다. 혼성기준을 선정 할 때 모든 상황에 대해서 효율적인 혼성기준이 있는 것이 아니라 전체시스 템의 가동률이 높고 낮음에 따라, 즉 기계 유형간 작업시간의 불균형의 정도 에 따라 유동적으로 선택하여야 한다. 시스템의 가동률이 전반적으로 낮을 때는 혼성기준을 낮게 설정 (약 40%에서 65%)하는 것이 바람직하고, 시스템 의 가동률이 높을 때는 (약 65%에서 90%정도)는 혼성기준을 높게 설정하는 것이 바람직하다.

  • PDF

Association between Satisfaction with Assistive Technology Devices and Psychosocial Impact among Some Mentally or Physically Disabled Children (뇌병변 및 지체 장애아의 보조공학기기 사용 만족도와 심리사회적 영향의 관련성)

  • Jang, Kyoung-Lae;Ryu, So Yeon;Park, Jong;Han, Mi Ah
    • Journal of agricultural medicine and community health
    • /
    • v.42 no.3
    • /
    • pp.132-144
    • /
    • 2017
  • Objectives: The purpose of this study was to identify the association between satisfaction with assistive technology devices and psychosocial impact among some mentally or physically disabled children. Methods: The study subjects were 120 disabled children and their primary caregivers who were using rental assistive technology devices in Gwangju and Jeollanam-Do. Data were collected by structured questionnaire composed of general characteristics of subjects, characteristics related with using assistive devices. Quebec User Evaluation of Satisfaction with assistive Technology 2.0 (QUEST 2.0) and Psychosocial Impact of Assistive Device Scale (PIADS). The statistical analysis were performed by descriptive statistics, t-test, ANOVA and Pearson's correlational analysis. Results: The total mean score for QUEST 2.0 was $4.08{\pm}0.66$ (satisfaction with devices, $4.01{\pm}0.70$; satisfaction with the assistive devices service, $4.14{\pm}0.90$) and the mean of PIADS was $1.00{\pm}0.75$ (ability, $0.99{\pm}0.78$; adaptability, $1.04{\pm}0.86$; self-respect, $0.99{\pm}0.74$). The scores of PIADS was statistically significant difference according to usage time of assistive devices. The PIADS was significantly positive correlated with QUEST 2.0 Conclusions: The mentally or physically disabled children reported that the higher level of satisfaction and the more positive impact of psychosocial aspect with assistive technology devices. It would be necessary to perform further studies for addressing the effects of assistive technology devices.

Signal Timing Calculation Model of Transit Signal Priority using Shockwave Theory (충격파 이론을 이용한 대중교통 우선신호의 신호시간 산정모형)

  • Park, Sang Sup;Cho, Hye Rim;Kim, Youngchan;Jeong, Youngje
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.4
    • /
    • pp.897-905
    • /
    • 2015
  • This research suggested the traffic signal calculation model of active transit signal priority using a shockwave model. Using this signal priority timing optimization model, the shockwave area is computed under the condition of Early Green and Green Extension among active transit signal priority techniques. This study suggested the speed estimation method of backward shockwave using average travel time and intersection passing time. A shockwave area change is calculated according to signal timing change of transit signal priority. Moreover, this signal timing calculation model could determine the optimal signal priority timings to minimize intersection delay of general vehicles. A micro simulation analysis using VISSIM and its user application model ComInterface was applied. This study checked that this model could calculate the signal timings to minimize intersection delay considering saturation condition of traffic flow. In case studies using an isolated intersection, this study checked that this model could improve general vehicle delay of more over ten percentage as compared with equality reduction strategy of non-priority phases. Recently, transit priority facilities are spreading such as tram, BRT and median bus lane in Korea. This research has an important significance in that the proposed priority model is a new methodology that improve operation efficiency of signal intersection.

A Study on the Applicability and Introduction Standards of Cut-through Roundabouts (직결형 회전교차로의 적용 가능성과 도입 기준에 관한 연구)

  • KIM, Ju Hyun;SHIN, Eon Kyo;KIM, Jun;KWON, Minyoung
    • Journal of Korean Society of Transportation
    • /
    • v.34 no.5
    • /
    • pp.449-464
    • /
    • 2016
  • The purpose of this study is to test applicability of cut-through roundabouts at a congested intersection and to provide the traffic volume ranges for theirs application. Various test scenarios were developed according to variation of total traffic volume, left-turn ratio to total traffic volume, and ratio of major road traffic volume to minor road traffic volume. In addition, three intersection types of cut-through roundabout, roundabout, and signalized intersection were compared with respect to delay times for each scenario, resulted from the simulation using VISSIM. In case of the ratio of major road traffic volume to minor road traffic volume, 6:4, the delay times of cut-through roundabout decreased up to 30% of left-turn ratio to total traffic volume for 400vphpl, up to 20% for 500vphpl, up to 10% for 600vphpl. In case of the ratio, 7:3, they are the same as 6:4 for 400vphpl, 500vphpl, and 600vphpl but they decreased up to 30% for 300vphpl and up to 10% for 700vphpl. In case of the ratio, 8:2, they are the same as 7:3 for 400vphpl, 500vphpl, and 700vphpl but they were reduced by 10% to 30% for 300vphpl and 20% for 600vphpl. It is concluded that the smaller left-turn ratio to total traffic volume as well as the ratio of minor road traffic volume to major road traffic volume is, the more effective in reducing delay times the cut-through roundabout is. Cut-through roundabouts can be expected to reduce delay times at a signalized intersections with traffic conditions above-mentioned.