• Title/Summary/Keyword: 통합사업관리시스템

Search Result 385, Processing Time 0.034 seconds

Integrated Project Delivery in the Pre-construction Phase : Case Study of IPD for Lean Construction (사례 연구를 통한 Pre-con 단계의 린 건설 기반 IPD 프로젝트 적용 방안 도출)

  • Jang, Hanbyeol;Lee, Joosung;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.11-22
    • /
    • 2019
  • Current construction project processes pose difficulties for construction management as inefficient communication between project participants seldom accurately reflects the needs of the owner. To solve this problem, lean construction-based Integrated Project Delivery (IPD), which facilitates cooperation and builds trust through the formation of horizontal relationships among participants, is becoming increasingly popular. However, although lean construction-based IPD improves productivity in the construction industry, few studies have focused specifically on developing effective methods that maximize the benefits gained from lean construction-based IPD. This study therefore analyzed success factors for lean construction-based IPD projects by analyzing prior studies to identify factors that support IPD success. Application methods were analyzed and an example of how they are actually used in the field was examined through an in-depth single case analysis. The findings of this research can be applied to support lean construction-based IPD projects in Korea, improving their efficiency and boosting owner satisfaction.

Development of Web-based Flood Prevention Information system (Web 기반 홍수방재정보시스템 개발)

  • Yeo, Woon-Ki;Seo, Young-Min;Jang, Kyung-Soo;Jee, Hong-Kee;Lee, Soon-Tak
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.795-799
    • /
    • 2007
  • 최근 정보통신산업이 급속도로 발전함에 따라 Internet을 이용하여 각종 정보를 쉽게 얻을 수 있게 되어 수자원 분야에도 정보의 공유와 자료의 통합이 활발히 이루어지고 있다. 또한 재해정보를 효율적이고 직관적으로 표현하기 위해서 방재업무에 GIS를 도입하고 있다. Internet을 통한 손쉬운 정보의 취득은 효율적인 재해관리에 매우 중요하며, 자료의 효율적인 관리와 표현을 위한 GIS기법 또한 필수적이다. 따라서 본 연구에서는 Internet과 GIS를 결합하여 보다 많은 사람들이 신속하고 정확한 재해정보를 얻을 수 있게 하며, 방재 업무에 활용토록 하여 재해에 의한 주민들의 생명의 위협과 재산피해를 줄이도록 하는데 그 목적이 있다. 효과적인 재해관리를 위해서는 계획과 관련된 정보, 재해발생 이력, 대상지역의 각종 정보가 통합되어 실시간으로 전달될 필요가 있다. 또한 이러한 정보들을 빠른시간내에 이해하고 분석하여 대책을 수립하고 시행해야한다. Internet GIS는 비상상황에 대비한 계획과 대처 그리고 복구사업에 있어 가장 정확하고 신속한 정보를 제공해 줄 수 있다. 즉, Internet GIS는 방대한 양의 정보를 효과적이고 지능적으로 분석이 가능하며, 이해하기 쉬운 그래픽 기반의 자료를 보여주므로 방재업무에 큰 도움을 줄 수 있다. Internet GIS를 방재정보 시스템에 이용할 경우 에 있어 장점, 약점, 기회, 위기에 대한 SWOT분석을 실시하였다. Internet이라는 환경의 장점을 그대로 이어받아 비용면에서 효과적이며 적용범위와 사용자층도 넓어지게 된다. 또한 누구나 간편하게 이용할 수 있어 협력체계 또한 쉽게 구축할 수 있으며 빠른 정보의 교환이 가능하다. 하지만, 인터넷에 의존한다는 점에 있어 서버가 자연재해에 노출될 경우 시스템 자체가 제 기능을 할 수 없으며 여러명이 동시에 서버에 접속을 하기 때문에 컴퓨터에 부하가 많이 걸리는 모델링이나 복잡한 분석은 실시하기 어려우며, 대용량 데이터를 전송할 수 있는 대역폭이 확보 되어야 한다. 또한, Internet 환경으로 개발을 해야되기 때문에 데스크탑용 GIS에 비해 개발속도가 느리며 개발 초기비용이 많이 들게 된다. 하지만, 네트워크 기술의 발달과 모바일과의 연계 등으로 이러한 약점을 극복할 수 있을 것으로 판단된다. 따라서 본 논문에서는 인터넷 GIS를 이용하여 홍수재해 정보를 검색, 처리, 분석, 예경보할 수 있는 홍수방재정보 시스템을 구축토록 하였다.

  • PDF

MAFNS를 이용한 서버 판매 에이전트 시스템 개발

  • 강무홍;최형림;김현수;홍순구;박영재;박용성
    • Proceedings of the Korea Association of Information Systems Conference
    • /
    • 2004.11a
    • /
    • pp.3-10
    • /
    • 2004
  • 멀티 에이전트 기술은 다양한 환경변화와 복잡한 문제 능에 보다 빠르고 유연하게 대처하기 위한 새로운 패러다임으로 부각되고 있다. 따라서 많은 분야에서 동적인 문제를 해결하기 위해 멀티 에이전트 시스템 구축하고자 연구가 진행중이다. 그러나, 기존의 멀티 에이전트 시스템을 개발하기 위한 Framework에 관한 연구들은 사용자를 대신하여 자율적으로 작업을 수행하는 일반적인 에이전트간의 정보 교환과 공유, 에이전트의 재활용, 이형질의 에이전트를 통합하기 위해 서로 각기 다른 에이전트간 사업 협력 구조를 제시하는 연구, 즉 멀티 에이전트가 가지는 기본적인 기능만을 제시한 Framework가 대부분이었다. 이러한 기존 멀티 에이전트 Framework의 한계점을 해결하고자 최형림 외 5명은 기본적인 멀티 에이전트 Framework의 기능뿐만 아니라 협상이라는 문제를 해결하기 위해 필요한 기능을 가지고 있는 MAFNS(Multi-Agent Framework for Negotiation Systems)를 설계하였다. 본 연구에서는 MAFNS의 구조를 이용하여 협상 메시지에 대한 평가, 협상 메시지의 관리, 협상 에이전트간의 빠르고 안정된 메시지 교환 지원 등과 같은 협상에 필요한 필수적인 요구 기능을 에이전트로 개발하고 각 에이전트 간의 유기적인 협력을 통해 자동으로 서버 판매 협상 문제를 해결할 수 있는 에이전트 시스템을 개발하였다.

  • PDF

Development of the Construction Post-evaluation System in Public Construction Projects (공공건설사업에서의 건설공사 사후평가시스템 구축에 관한 연구)

  • Ok, Hyun;Yang, Sung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7364-7371
    • /
    • 2014
  • Construction post-evaluation (CPE) boosts the efficiency of public construction projects by assessing the performance results of public construction projects and using the results to pursue similar projects. This evaluation comprehensively analyzes and assesses the planning of construction work, the estimated and actual construction costs, the construction period, the demand for construction projects, and the effects of construction projects after the construction work to ensure efficiency. The data was used to prevent lax project execution and enhance the quality and efficiency of similar construction projects. On the other hand, CPE results information must be managed systematically to refer to and use CPE data in similar construction projects. Therefore, in this study, the CPE system was developed as a measure of the systematic and comprehensive management and use of the CPE results information of individual ordering agencies. Therefore, the groundwork was laid for the assurance of quality enhancement and efficient project execution in public construction projects. This system is expected to serve as a useful tool for comprehensively analyzing and assessing construction works.

A Study on Mission Software Reliability Test Methods of International Joint Development Project for KT-1 Military Aircraft Software (KT-1 군항공기 소프트웨어 국제공동개발 사업의 미션 소프트웨어 신뢰성 시험방안에 관한 연구)

  • Byung Duck Bae;Seonah Lee
    • Journal of Aerospace System Engineering
    • /
    • v.17 no.6
    • /
    • pp.108-117
    • /
    • 2023
  • Thus far, a mission software component of the KT-1 military fixed-wing aircraft for overseas export has been developed through international joint development with foreign companies. The reliability of the software component could be certified by complying with the development environment and procedures of foreign companies based on DO-178B. However, recently, DO-178C certification is required for overseas exports, and reliability tests to comply with the weapon system software development guidelines are required for domestic military forces. In this paper, we describe the problems in obtaining domestic airworthiness certification in the international joint development of a previously developed KT-1 export-typed aircraft system integration project. To this end, we find a solution to comply with both DO-178C and the Weapon System Software Development and Management Manual and provide the optimal software reliability test method.

Development of Risk Analysis Structure for Large-scale Underground Construction in Urban Areas (도심지 대규모 지하공사의 리스크 분석 체계 개발)

  • Seo, Jong-Won;Yoon, Ji-Hyeok;Kim, Jeong-Hwan;Jee, Sung-Hyun
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.3
    • /
    • pp.59-68
    • /
    • 2010
  • Systematic risk management is necessary in grand scaled urban construction because of the existence of complicated and various risk factors. Problems of obstructions, adjacent structures, safety, environment, traffic and geotechnical properties need to be solved because urban construction is progressed in limited space not as general earthwork. Therefore the establishment of special risk management system is necessary to manage not only geotechnical properties but also social and cultural uncertainties. This research presents the technique analysis by the current state of risk management technique. Risk factors were noticed and the importance of each factor was estimated through survey. The systemically categorized database was established. Risk extraction module, matrix and score module were developed based on the database. Expected construction budget and time distribution can be computed by Monte Carlo analysis of probabilities and influences. Construction budgets and time distributions of before and after response can be compared and analyzed 80 the risks are manageable for entire whole construction time. This system will be the foundation of standardization and integration. Procurement, efficiency improvement, effective time and resource management are available through integrated management technique development and application. Conclusively decrease in cost and time is expected by systemization of project management.

Long-Range Water Resources Prediction and Flood Risk Assessment using Climate Information (기후정보 활용 수자원 장기예측 및 중장기 홍수위험도 평가)

  • Yoon, Sunkwon;Choi, Jihyeok;Moon, Young-IL
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.17-17
    • /
    • 2018
  • 재난발생 위험은 불확실성을 내포하고 있으며, 이러한 불확실성 요인을 줄이고 사전에 소멸시키는 일은 매우 중요한 사항이 될 수 있다. 또한 재난관리 관점에서 그것이 발생했을 때 어떤 식으로 대응할지에 대한 과정이 체계적으로 갖추어져 있어야 하며, 복구 및 재발 방지를 위한 지속적인 노력이 수반될 필요성이 있다. 본 연구에서는 기후정보를 활용한 중장기 수문예측을 실시하고 통합홍수위험평가 시스템 구축을 통한 홍수위험도 분석을 실시하였다. 이를 위하여 우리나라 243개 지자체를 대상으로 홍수관련 위해성, 노출성, 취약성 자료를 수집하여 표준화하였으며, 전문가 Delphi-AHP 설문조사 분석을 통하여 가중치를 적용하고 위험도를 예측 평가하였다. 이러한 중장기 위험 예측 정보는 한 달 또는 수개월 전에 지자체 행정력을 집중 및 분산시키고, 수재해(홍수/가뭄 등) 위험관리 계획 수립이 가능하여 재난관리자에게 유용한 정보로 활용될 수 있을 것이다. 또한 재난의 생애주기(Life Cycle)별 예방, 대비, 대응, 복구 단계에 따라 사전과 사후에 가능한 주요 활동들을 구체화 할 수 있으며, 시간 스케일별 기후예측 정보를 활용한 재난관리 패러다임 전환과 골든타임 확보 등 수자원예측 분야 기술적 진보를 이룰 수 있을 것으로 기대한다. 향후 통계 역학 모형 기반 중 장기 예측 정보의 신뢰도가 향상 된다면 보다 다양한 분야 예측 정보 서비스 및 활용이 가능할 것이다.

  • PDF

An Analysis and Improvement of Progress Payment Regulations in Korea Using System Dynamics - Focusing on Public Construction Industry - (시스템다이내믹스를 이용한 국내 기성금 제도 현황 분석 및 개선방안 제시 - 공공건설분야를 중심으로 -)

  • Park, Moon-Seo;Lee, Jeoung-Hoon;Lee, Hyun-Soo;Hwang, Sung-Joo;Kim, Soo-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.148-159
    • /
    • 2012
  • Recently construction companies' capital condition has been aggravated due to low profit, fierce competition and market contraction. For this reason, the companies rely on public construction projects that protect construction fee by regulations. Despite these regulations, problems regarding progress payment are constantly happening. Also, insufficient analysis on interaction between contractors makes policy making difficult. Thus, in this study, interaction between contractors are quantitatively determined according to delay of application and payment based on current public construction regulations on construction stage. A system dynamics model is used, which analyzes the problems based on an interaction between contractors, and solutions for progress payment application and payment delay are suggested according to the research results.

Research in information & communication technology for water in the four major rivers restoration project (4대강 사업에서 수자원 정보통신기술 발전방향연구)

  • Seo, Gang-Do;Jang, Sang-Bok;Lee, Dong-Hoon;Hwang, Jae-moon;Park, Byung-Don
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2013.10a
    • /
    • pp.184-187
    • /
    • 2013
  • The Four Major Rivers Restoration Project of is the multi-purpose green growth project in South Korea. Some of the project was progressed by K-water and was declared complete on October 21, 2011. The Four Rivers Restoration Project of Korea was designed to be a packaged project that aims to resolve water-related problems such as floods and droughts and revitalize Korean public spaces near the water. K-water have applied the latest ICT(Information and Communication Technology) for the operating management of 4 Rivers Project facilities. We also have applied ICT for integrating drinking water production facilities. Applying these ICT, we have many experience for integrated water resources management, so we proposed. The first is that the big data collected should be analyzed for making decisions and taking actions while considering multiple viewpoints of how water should be managed. The second is that the new MMI(Man Machine Interface) program should be developed to use domestic needs and promote ease of maintenance for the integrated operation. The third is that the standardization of communication protocol is needed for seamless communication between equipments.

  • PDF

성인병 뉴스 제306호

  • The Korea Association of Chronic Disease
    • The Korean Chronic Disease News
    • /
    • no.306
    • /
    • pp.1-30
    • /
    • 2006
  • 안산시 단원 보건소 박영숙 소장/노인인구 급증 사회적 부담 증폭/“병원 자본조달?투자활성화 필요”/차관지원의료기관 연체금 감면 지원/의료기관평가, 관민공동참여를/“환자급식 제공실태 일제 점검”/인천시, 만성질환 관리 위해 나섰다/통합건강증진 프로그램 시범 운영/약가 포지티브 시스템 강행/Metformin은 당뇨병의 모든 키워드 함축한 약제/Metformin, 혈당개선.심혈관질환 예방“효과”/대사증후군 환자 인슐린저항성 개선...당뇨병 예방/“내당능장애 환자, 당뇨병 걸릴 위험 높다”/“Metformin, 저혈당 일으키지 않는 대단히 좋은 약제”/국내연구서 metformin 복용 인슐린 투여량 감소 입증/“Novamet GR, 폴리머 통해 약물 분비 조절한다”/새벽녘에 생기는 공복혈당 적절한 억제 기대/의료법인 단계적 수익사업 허용/고지 혈증/건강검진수가도 종별가산율 적용돼야/

  • PDF