An Integrated Construction Management System Based on the Earned Value Concept (EV개념에 의한 통합건설공사관리시스템)

  • Chung Chul-Won;Lee Jeom-Su;Oh Kyu-Whan;Chang Jin-Sik;Lee Yu-Seop;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.155-162
    • /
    • 2001
  • Recently, in Korea, a few construction companies have been tried to develop a management system, which is able to integrate schedule and cost. In spite of these attempts, however, advanced management techniques can be hardly applied under the BoQ based management system. In order to improve these problems, many studies have been peformed, but yet could not overcome practical limitations. Besides, the application of historical data is below the level since it is so difficult to accumulate and feed-back historical data under the unique character of construction industry. Consequently, lots of time and effort have being wasted to establish control criteria. The newly generated Information is not systematically managed as well. Therefore, this study suggests Integrated Construction Management System complemented the existing practical problems.

  • PDF

A Case on the Applying QDB based Schedule·Cost Data Management for Road Construction (디지털 수량산출정보 기반 도로분야 공정·공사비 정보 관리 시범적용 사례)

  • Moon, Jin Seok;Yoon, Hoi Soo;Han, Choong Han;Kim, Seong Jin
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.04a
    • /
    • pp.1428-1429
    • /
    • 2012
  • 건설분야 수량산출정보의 연계 및 교환을 위한 디지털 수량산출정보 교환표준과 지방국토관리청의 도로관리관점에 따라 구성된 작업분류체계를 바탕으로 도로분야 수량산출정보를 지원도구를 통해 생성한다. 건설사는 지원도구에서 작성한 도로공사 수량산출정보를 건설사업관리시스템에 등록함으로써 공정 공사비 관리에 활용하고 있다. 본 연구는 공정 공사비의 통합관리를 통해 실질적인 사업관리가 가능하도록 10개 도로건설공사 시범사업을 선정하여 문제점과 개선방안을 도출하였다.

A Study on developing WBS based QDBS(Quantity Database System) for the schedule and the cost data integration for road construction project (도로공사의 공정 및 공사비 연계활용을 위한 디지털 수량산출정보시스템(QDBS) 개발 연구)

  • Yun, Seok-Heon;Kim, Seong-Sig
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.119-127
    • /
    • 2007
  • Cost and Schedule is the most important information, and how efficiently manage this information is the key issue for Construction Project Management. Domestically, systematic scheduling method such as CPM network is not only used widely but integration of time and cost information also is. In order to effectively integrate and use the time and cost information, it is suggested that WBS(Work Breakdown Structure) based QDB(Quantity Database) should be generated from the design phase and, WBS and QDB related system tool should be supported. It could be helpful to relate and integrate other construction project information.

Development of Activity and WBS for Integrated Cost and Schedule Control Process in Bridge Works (공정$\cdot$공사비 통합관리를 위한 Activity 및 WBS 구축 방안 -교량공사 예시)

  • Kim Jung-Ki;Lee Young-Dae;Kim Soo-Yong;Park Hyeo;Kim Sung-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.406-409
    • /
    • 2001
  • This study refers to development of WBS(Work Breakdown Structure) and Activity sample for integrated cost and schedule control system of sample bridge work in the field. The conclusions from this study may be summarized as following 1. It showed that the level of detail to network's activities depend upon schedule's intended purpose. 2. It is more effective 'activity to cost package model' than 'activity to resource model', for integrated cost and schedule control reflect the characteristics of domestic construction industry.

  • PDF

A Study on the Application Method of Facility Classification System for the Development of Asset Management System for Power Generation Structures (발전구조물의 자산관리 시스템 구축을 위한 시설물분류체계 활용방안에 관한 연구)

  • Jeon, Seokhyeon;Jeong, Jeongsik;Ahn, Jinhee;Kim, Changhak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.113-118
    • /
    • 2019
  • Recently, the maintenance concept of infrastructure has been changed from the stability management of the structure determined by the safety inspection of the existing facilities to the asset management related to evaluating and managing the performance of the facilities. For management of the property of the facilities, it is necessary to efficiently classify their information for the maintenance and service level of the facilities and to manage them. In the case of power plant facility, especially, it is a complex structure, which is constructed in a various component and detail. In this study, therefore, the components of power plant facility were classified into facilities, spaces, parts, and elements considering the type of integrated construction classification system in Korea. To reflect the deterioration rate of the facility in accordance with environmental conditions such as airborne salt and humidity etc., it was classified by adding direction, interior, and exterior condition of each component not to be considered in the existing classification system for its effective and systematic maintenance, since it is generally located in the coastal area due to the operation of the power generation structure. The classification system developed in this study can be used as fundamental data for development of the computer system for asset management of power plant facility.

BIM based Integration Method of Cost and Schedule Information (BIM기반 비용.일정 통합관리 방안에 관한 연구)

  • Baek, Young-In
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.695-699
    • /
    • 2009
  • 3D and BIM technology are presumed to be used more and more in the construction industry. The scope of this paper arose from a general wondering of how the constructor in general can benefit from the use of 3D models. Presented herewith is the first application of BIM in Korea to a actual bridge construction site located in Cheongpoong in Chooncheongbook-Do. This paper tries to integrate design, cost and schedule under location-based conditions with industry-specific solution for 3D modeling. 292 activities constitute the cable-stayed bridge of 442m long with a main span of 327m long. Integration of 3D model, cost and schedule is shown by comparing the measurements of works at a specific time by use of 2 different construction sequencing scenarios and cost breakdown structures.

  • PDF

Establishment of Water Environment Evaluation System Considering Water Quantity and Quality in Agricultural Reservoir (농업용 저수지 수량·수질을 고려한 수환경 평가체계 구축)

  • Hong, Eun Bi;Kim, Da Ye;Lee, Gwang Ya;Park, Ji Seong;Song, Chul Min
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.199-199
    • /
    • 2021
  • 한국농어촌공사에서는 과학적이고 체계적인 농업기반시설 및 용수관리로 재해를 예방하고 물관리의 효율성 증대를 위한 유지관리 종합정보시스템인 농업기반시설관리시스템을 구축하여 운영중에 있다. 한국농어촌공사는 2012년부터 저수지별 일공급량을 측정하여 기록 관리하고 있어, 저수지의 수위차와 공급량을 사용하여 저수지의 일유입량을 산정 할 수 있는 체계를 구축하였고 저수지 종합건전성 평가를 위해 이 자료를 사용하였다. 수량부문은 수문학적으로 하천환경 및 수생태계에 민감한 영향을 끼치는 인자들로 지표를 구성하였다. 선정된 지표는 High Flow, Low Flow, Seasonality, Zero Flow, Variability로 구성하였다. 수질부문은 자연적 요인과 사회·경제적 요인 기준에 의한 분류를 통해 저수지의 건전성 상태를 파악할 수 있는 지표를 선정하였다. 자연적 요인은 환경부의 수질환경기준에 제시된 항목 중 저수지 건전성을 대표할 수 있는 수온, DO, COD, SS, TN, TP 및 TOC를 선정하였다. 농업용 저수지 수량·수질을 고려한 수환경 평가체계 적용을 위해 적누, 이담, 송고 저수지를 선정하였다. 3개 저수지를 대상으로 수량, 수질 부문으로 나누어 부문별 건전성 및 종합건전성 평가를 수행하였다. 선정된 지표의 분석단위를 통일시키기 위하여 표준화를 수행하였으며 자료의 왜곡정도가 큰 경우에는 로그변환을 취하여 표준화를 수행하였다. 가중치 적용은 주관적인 견해가 들어갈 수 있는 전문가의 설문에 의한 방법보다는 수학적 방법을 이용한 주성분과 엔트로피 가중치 방법을 적용하였다. 최종적으로 산정된 지수에 따라 하천별 현황을 주제별, 시기별로 검토하였으며 객관적이고 이해가 쉽게 5개 등급으로 등급분류를 해 저수지별 건전성 정도를 쉽게 파악할 수 있도록 하였다.

  • PDF

Development of a Water Information Data Platform for Integrated Water Resources Management in Seoul (서울시 통합물관리를 위한 물정보 데이터 플랫폼 구축방안)

  • Yoon, Sun Kwon;Choi, Hyeonseok;Cho, Jaepil;Jang, Suk Hwan
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.76-76
    • /
    • 2020
  • 국가 물관리일원화 이후, 지방하천 관리에 대한 지자체 역할과 권한이 커지고 있으며, 중앙정부의 물관리 수준에 부합하는 데이터관리 체계구축 및 지속적인 품질관리(Quality Control, QC)와 표준화(Standardization) 기술개발이 요구되고 있다. 지자체의 경우 기존의 행정구역별로 분산 관리해오던 물관리 시스템을 유역단위로 전환할 필요가 있으며, 국가하천 구간과 연계한 종합적인 관리가 필요한 실정이다. 서울시의 물관리 시스템은 자치구별로 산재해 있으며, 관리 주체 및 해당 변수에 따라 제공되는 정보가 다르고 하천유역 단위로 분류되어 있지 않다. 따라서, 서울시와 자치구, 중앙정부 및 관련 기관과의 연계성 있는 정보제공을 위한 데이터 플랫폼 구축 기술개발이 필요한 실정이다. 본 연구에서는, 빅데이터, AI 기술을 활용한 물정보의 품질관리 자동화 기술개발과 지속적인 유지관리 및 표준화 정보제공 시스템 구축 기능을 포함하는 서울시 통합물관리 데이터 플랫폼 구축 목표 모델을 제시하였으며, 서울시 물관리 체계와 관련하여 SWAT 분석을 통한 단계별 사업추진 로드맵을 도출하였다. 분석결과, 서울시 통합물관리 플랫폼 구축을 위해서는 유역별 수량-수질 통합 모니터링 및 모델링 기술개발, 빅데이터 기반 물 정보화 플랫폼 구축 기술개발, 지방하천 유역 거버넌스 구축 및 법제도 정비 방안 마련이 요구되며, 관련하여 주요 이슈(3대 핵심전략, 10개 단위과제)를 도출하여 관련 연구과제를 제안하였다. 마지막으로, 서울시 통합물관리 정책 실현을 위해서는 법제도 마련이 시급하며, 서울시 '통합물관리 기본조례' 제정을 통한 기반을 조성할 필요가 있음을 시사하였다. 또한, 다양한 분야 이해관계자 협의체인 '서울시 통합물관리위원회(가칭)'의 거버넌스를 구성하여 운영하는 것이 현실적이며, 한강유역관리 및 지방하천 관리와 관련한 중추적인 역할 수행과 쟁점 논의 등 합리적 합의가 가능할 것으로 기대한다.

  • PDF

Construction Plan of 3D Cadastral Information System on Underground Space (지하공간 3차원 지적정보시스템 구축 방안 연구)

  • Song, Myungsoo;Lee, Sungho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.6
    • /
    • pp.57-65
    • /
    • 2014
  • Recently, Construction business is changing from on the ground to underground space because of deficit of developing space, creation of green space and of incremental of land compensation expenses. Meanwhile, 3D Topographic, Marine and Cadastral maps need to have Spatial Interrelation. Also, understanding of the information is also needed. Spatial information object registration system is impossible to contact and understanding intelligence mutually because the former one is managed as automatic ID system. Therefore, 3D Object information ID System of underground space is managed based on Object Identifier. Construction of Spatial information integration ID System is required and it will offer Division Code (Ground, Index, Underground) and depth information. We are defined and classified Under Spatial Information in this paper. Moreover, we developed the integration ID System based on UFID for cadastral information Construction. We supposed underground spatial information DB Construction and a developed the way of exploiting 3D cadastral information system through the study. The research result will be the base data of Standard ID system, DB Construction and system Development of National spatial data which is considered together with spatial interrelation.

A Study on the Necessity and Applicability of Interactive Electronic Technical Manual(IETM) for Construction Projects (건설분야 전자매뉴얼의 필요성 및 특성분석을 통한 실무적용성 연구)

  • Kang, Leen-Seok;Jung, Won-Myung;Kwak, Joong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.99-108
    • /
    • 2005
  • Interactive electronic technical manual(IETM) for construction projects means an electronic tool that regulations and specifications related to construction method or maintenance process ale described by electronic book type. It has a meaning of integrated information system that includes virtual reality(VR), 3D animation and image contents for representing real construction information so that user can easily understand the construction situation and maintenance process. The basic information and technical manuals of construction facilities are being written as paper documents in our construction industry. As the result, the information management in the maintenance phase of construction projects is inefficient, and maintenance cost is being increased. This study attempts to improve the lack of understanding about construction IETM through the analysis of necessity and unique function of construction IETM comparing with the IETMS in other industry, Finally, this study shows a scenario of construction IErM for mitigating natural disaster of construction facilities to verify applicability of IETM.