An Integrated Construction Management System Based on the Earned Value Concept

EV개념에 의한 통합건설공사관리시스템

  • Published : 2001.11.01

Abstract

Recently, in Korea, a few construction companies have been tried to develop a management system, which is able to integrate schedule and cost. In spite of these attempts, however, advanced management techniques can be hardly applied under the BoQ based management system. In order to improve these problems, many studies have been peformed, but yet could not overcome practical limitations. Besides, the application of historical data is below the level since it is so difficult to accumulate and feed-back historical data under the unique character of construction industry. Consequently, lots of time and effort have being wasted to establish control criteria. The newly generated Information is not systematically managed as well. Therefore, this study suggests Integrated Construction Management System complemented the existing practical problems.

최근 건설업계에서는 공정과 비용을 통합, 관리 할 수 있는 전산 시스템 구축에 많은 비용과 노력을 투자하고 있는 실정이다. 하지만 현행 내역위주의 실행예산 체계에서는 선진 관리기법의 적용이 매우 어려운 상태로 단순 보고형의 공정관리만을 수행하고 있는 실정이다. 이를 개선하기 위해 그 동안 공정과 원가를 통합하기 위한 많은 연구가 수행되어 부분적으로 그 성과가 있었으나 대부분 내역중심의 실무한계를 극복하지 못하였다. 이와 더불어, 프로젝트산업의 전형인 건설공사의 고유의 특성에 의해 실적 정보의 축적 및 Feed back이 매우 어려워 과거 실적 자료의 활용 수준이 매우 떨어지고 있다. 그 결과, 공사 초기 관리기준 설정에 많은 시간과 노력이 소모되고 있으며, 생성된 정보의 체계적 관리가 이루어지고 있지 못하다. 따라서, 렬 연구는 건설실무에서 시도되어 왔던 공정과 원가의 통합관리 시스템에서 발생하였던 실무상의 문제를 보완한 통합공사관리시스템을 제안한다.

Keywords