• Title/Summary/Keyword: 토공측량

Search Result 53, Processing Time 0.021 seconds

Applicability Evaluation of Mobile Mapping System for Road Construction Surveying (도로 시공측량을 위한 모바일맵핑시스템의 적용성 평가)

  • Park, Joon Kyu;Lee, Keun Wang
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.40 no.3
    • /
    • pp.169-175
    • /
    • 2022
  • Korea's construction industry has a shortage and aging of construction manpower, low productivity compared to other industries, and a high rate of industrial accidents. The Ministry of Land, Infrastructure and Transport is preparing for the 4th industrial revolution and is expanding investment in construction automation and innovative growth engines to improve productivity in the construction industry. In order for new technologies to be utilized in the road construction field, the accuracy of the technologies and the applicability of each type of work must be evaluated. In this study, the accuracy of the mobile mapping system was tried to verify based on the relevant work regulations, and to suggest the applicability of the mobile mapping system to high-speed driving tracks through data acquisition and analysis on road construction sites. The accuracy of the equipment used in the study was verified in accordance with the relevant work regulations, and the possibility of applying the mobile mapping system used for the study to road construction surveying was presented with a maximum error of less than 10cm in the horizontal and vertical directions. In addition, the possibility of utilizing the road construction survey using the mobile mapping system was presented through comparison with the existing method for data acquisition time for construction surveying, production of construction status survey results, and calculation of heatmap and earthworks. In the future, the use of construction status surveying of the mobile mapping system will greatly improve the efficiency of construction work.

The Quantification Research of Multi-Factors for Route Determination Using AHP Technique (AHP 기법을 이용한 도로의 노선 선정시 다중인자의 정량화 연구)

  • 양인태;김동문;최승필
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.20 no.2
    • /
    • pp.199-206
    • /
    • 2002
  • The application of GSIS for most route determination is provided by selecting several basic data such as land use, land construction quantity and land price, and then establishing a database to analyze for the route determination. However, this strategy rarely considers the complicated multi-factors that are essential for route determination. To solve this problem, it is required to use the GSIS and attempt to support the decision of majority for optimum route determination and standardize the route determination procedure. Accordingly, in this study, the qualification of multi-factors was attempted using the AHP technique, and so the data for the route determination was provided effectively, which resulted in the optimum route determination. As a result of applying the AHP technique, optimum routes were selected more rationally than randomly applying the values of multi-factors as before.

Change Monitoring in Ecological Restoration Area of Open-Pit Mine Using Drone Photogrammetry (드론사진측량을 이용한 노천광산 생태복원지역의 변화 모니터링)

  • Lee, Dong Gook;Yu, Young Geol;Ru, Ji Ho;Lee, Hyun Jik
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.24 no.4
    • /
    • pp.97-104
    • /
    • 2016
  • In this study, analyze and monitor the change of the ecological restoration area inside the open-pit mine in Gangwon-do. and to analyze and monitor the change of ecological restoration area. analyzed the distribution of vegetation using high-resolution orthophoto of various periods and analyzed terrain change using DSM/DEM in study area. Therefore, orthophoto and 포인트 클라우드 were collected from 2014 aerial laser surveying and 2015 fixed-wing drone photogrammetry. In addition, orhtophoto and 포인트 클라우드 were produced by using rotary-wing drone photogrammety in 2016, and change of ecological restoration area was analyzed using this. As a result, it's possible to perform change monitoring of the open-pit mine ecological restoration area. using nEGI and VARI, about 10-30% of the area ratio of the result of extracting vegetation distribution area is distributed, and the comparison DSM and DEM cross section and restoration plan line, the cross section made by using the drone were similar, and the earth-volume analysis was possible.

Definition of the Earth-volume in Breakwater Using Real-time DGPS & Echo-Sounding data (실시간 DGPS & Echo-Sounding 데이터를 이용한 방파제사석투하 토공물량 확인)

  • 서용운;최윤수
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.18 no.4
    • /
    • pp.343-350
    • /
    • 2000
  • This study deals with the Definition of the Earth-volume quantity and direction of throwing down stones (Q.R.R) into the Breakwater using Real-time DGPS & Echo-Sounding method. Generally, the buoy in the center line of Breakwater has been set up so as to throw down stones in the correct area. After throwing stones down there, surveyors have been surveying the depth and direction of stones with rod and sounding lead. The method, however, is not effective because of long time and a lot of human power, in addition it is incorrect. This paper has studied on the solution of those problems using Real-time DGPS & Echo-Sounding data to calculate the earth-volume quantity, direction and depth of throwing down stones. This paper says the effective and economical methods using Real-time DGPS & Echo-Sounding data there.

  • PDF

A Study on the Earthwork Calculation for Reclamation (埋立을 위한 土工量 계산에 관한 硏究)

  • Mun, Du-Yeoul
    • Journal of Ocean Engineering and Technology
    • /
    • v.9 no.2
    • /
    • pp.61-70
    • /
    • 1995
  • The purpose of this paper is to calculate the excavation volume of unequal interval grid using nonlinear boundary in eathwork volume determination for reclamation of the foreshore. A congruence area formula by first and third equation is compared with trapezoidal, simpson formulas to earthwork volume. And nonlinear spot level method of unequal interval grid is compared with linear and nonlinear spot level method of equal interval grid excavation volume. As a result algorithm of derived area and volume formula should provide a better accuracy than linear and nonlinear spot level currently in use. Practical application of each method to the excavation volume is illustrated by digital elevation model of aerial photogrammetry and model test of aquarium.

  • PDF

Availability Evaluation of FKP-RTK Positioning for Construction Survey Application (FKP-RTK 측위의 시공측량 적용성 실험)

  • Kim, In Seup
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.31 no.6_1
    • /
    • pp.463-469
    • /
    • 2013
  • In addition to the VRS-RTK service, FKP-RTK service launched recently in Korea however unlike VRS, it is not yet applied to various surveying tasks. VRS system is operated in two way communication over the mobile Internet. When user send rover position data to network RTK server and the server provides correction data to users continuously. It causes to increase communications load and makes delaying or failure in data transmission depends on server capacity and number of concurrent users. In contrast, since FKP system is one way communication system, user only receives correction data and area correction parameters for the selected Continuous Reference Station from the server. Thus, there is no limitation to the number of concurrent users in FKP system and it would be more efficient than VRS system in terms of economic. To this end, we performed FKP-RTK test for Unified Control Points and Urban Control Points where are located at 5 regions in Korea to evaluate the accuracy. As a result, almost of FKP positioning data are in error range of ${\pm}6.2cm$ in horizontal and it would be enough for construction survey such as for earth work in limited except precise structure survey.

The Analysis of Road Alignement and Construction GSIS Using RTK GPS and TS (RTK-GPS와 TS를 이용한 도로선형분석 및 GSIS 구축)

  • 장상규;홍순헌;김가야
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.21 no.4
    • /
    • pp.293-299
    • /
    • 2003
  • In the future, the design of road should be convenient in using of high-technology information and it needs the design of alignment that is able to make the maximum vehicles inducement function appropriated for CNS(Car Navigation System). So it needs to analysis appropriately the alignment of road for the improvement design of road which is established and to make the design of road and the coordinate of the main points. Therefore, this research had acquired the road data by RTK-GPS to accurate the analysis of road alignment and compared with Total Station. As the result, we could acquire the design source of the road alignment using RTK-GPS. Also, it was estimated the accuracy after comparing the design with RTK-GPS coordinates. We made an analysis of the degree of slant or the ups and downs of surface. We made an analysis of three dimensional visual information which was included in GSIS concept and estimated the accuracy. Finally, we analyzed the earth volume calculation by comparing with Total Station.

A Study on Route Location Using Decision Support System (의사결정체계를 이용한 노선 선정에 관한 연구)

  • Seo Dong Ju;Lee Jong Chool;Roh Tae Ho
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.23 no.2
    • /
    • pp.117-128
    • /
    • 2005
  • This study presented the route location method by applying AHP and evaluating quantitatively. This study developed the program that can be easily applied to this kind of road design, and built the decision support system fur route location. The study results are summarized as follows : We could quantitatively evaluate the appropriateness of exiting routes by applying the AHP based on GIS. If we apply this to the roads that will be newly constructed, we can make the objective and reliable route location when making road plans and basic designs. We improved the technique of route location by applying the decision support system with third-dimensional data, which considers even the vertical alignment plan, to the existing decision support system with second-dimensional data. had, since we call set those data such as vertical slope, earth-volume, structure size, location and construction cost to independent variables, we can make road designs more scientifically and reasonably.

Experiment of Computation of Ground Cutting Volume Using Terrestrial LiDAR Data (지상 LiDAR 자료의 절토량 산정 실험)

  • Kim, Jong-Hwa;Pyeon, Mu-Wook;Kim, Sang-Kuk;Hwang, Yeon-Soo;Kang, Nam-Gi
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.17 no.2
    • /
    • pp.11-17
    • /
    • 2009
  • Terrestrial LiDAR can measure high capacity 3D-topography coordinates and try to apply to various public works such as tunnel surveying, facility deformation surveying. This experiment is about how to calculate ground cutting volume because the stage of the earth work spend lots of money and time among civil engineering works. Surveying cutting area using Terrestrial LiDAR and then calculating cutting area in planned area comparing sectional plan before construction and planned section and LiDAR data. Also, the values of the calculating ground cutting volume by three different resolution LiDAR has are compared and analyzed.

  • PDF

The Digital Orthophoto Production by the Automative Generation of DEM using Non-photogrammetric Scanner (비측정용 주사기를 사용한 수치표고모델의 자동생성에 의한 수치정사사진 제작)

  • Park, Woon-Yong;Yi, Gi-Chul;Lee, In-Soo;Kim, Jin-Su
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.3 no.2
    • /
    • pp.24-36
    • /
    • 2000
  • This study deals with the optimal method of orthophoto products using the non-photogrammetric scanners. we scanned positive film of aerial photographs at the different resolution and producted the orthophoto using the automatically generated DEM based on the Digital Photogrammetric Workstation, considering aerial image resolutions, DEM interval, resampling method and outpixel size. As a results, the acquired accuracy was worse in horizontal, but good in vertical. So It will be expected that orthophoto using non-photo grammetric scanner is good enough for the acquisition of GIS data and the calculation of soil volumes.

  • PDF