• Title/Summary/Keyword: 터널안전

Search Result 914, Processing Time 0.025 seconds

A Study on Fire ventilation design of road tunnel (도로터널에서의 화재환기 설계에 관한 연구)

  • Kim, Myung-Bae;Choi, Byung-Il;Choi, Jun-Seok;Han, Yong-Shik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.6 no.2
    • /
    • pp.129-139
    • /
    • 2004
  • The several assumptions and design parameters to determine the ventilation rate in tunnel ventilation system were examined. In longitudinal ventilating tunnel, the ventilation rate has been determined by the critical velocity above which the smoke propagation to the upstream of ventilating air is prevented. Based upon the examination of assumptions and experimental results, we suggested the improved method to determine the critical velocity. In transverse ventilating tunnel, we found that the ventilation rate has been determined in accordance with the custom rather than fire-smoke dynamics such as the critical velocity in the longitudinal ventilating tunnel. It is because the ventilation rate in the transverse ventilation system has been determined by considering only the ventilation of contaminant by vehicle. To improve the ventilation design parameters based upon the fire-smoke dynamics, we conducted model tunnel fire experiments. From the experimental results, smoke propagating distance and smoke filling were suggested as the design parameter to determine the ventilation rate in transverse ventilating tunnel. And tunnels in Europe designed by the custom is found to have the dangerous nature in view of fire safety.

  • PDF

A study on the establishment of pressure limit values of management monitoring in tunnel (터널 유지관리계측의 압력 관리기준치 설정에 관한 연구)

  • Woo, Jong-Tae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.53-60
    • /
    • 2016
  • This study analyzed a monitoring data, based on the initial limit values of monitoring in subway, of earth pressure and pore water pressure. The data is obtained from 8 sections of the Seoul metropolitan subway line No 6, 7 and 9 in about 5 years. Also, a research is performed to set up the limit values of management monitoring, which will be applied to management monitoring in tunnel, through comparing the limit values of overseas management monitoring data and that of domestic management monitoring data. And the result obtained from comparison show that the safety phase is 60% of allowable pressure, the attention phase is 80% of allowable pressure and the precision analysis phase is 100% of allowable pressure. Also, we presented a method of management monitoring by the absolute value which can be easily applied easily in practical affairs.

A study on the flexural toughness characteristics of the half-circle type steel fiber reinforced shotcrete (반원형 강섬유보강 숏크리트의 휨인성 특성에 관한 연구)

  • Ji, Young-Hwan;Jeong, Ji-Su;Jeong, Chun-Kyo;Lee, Seung-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.2
    • /
    • pp.83-96
    • /
    • 2011
  • Currently, the commonly used tunneling method in Korea is NATM (New Austrian Tunneling Method). This method uses the rock bolt, shotcrete, and supporting system to maintain the strength of original soil and ensures the stability of tunnel by stabilizing the soil using the original strength of the soil in maximum after the excavation. In past years, wire-mesh reinforced shotcrete was common ones but currently steel-fiber reinforced shotcrete is being widely used for the tunnel construction site in Korea to save construction time with the advanced construction technology. The results further indicate that needs for the establishment of not only the specifications for shotcrete but the strengthening methods for the under reinforced shotcrete sections. Therefore, this study deals with the development of a new steel-fiber to ensure the stability of tunnels that are under reinforced with steel-fibers and to overcome the shortcomings of conventional method.

A study on establishment of measurement and analysis frequency of maintenance monitoring in tunnel (터널 유지관리계측의 측정 및 분석주기 설정 연구)

  • Woo, Jong-Tae;Lee, Kang-Il
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.2
    • /
    • pp.117-129
    • /
    • 2012
  • In this study, research was performed to establish the measurement and frequency of analysis for maintenance monitoring by investigation of tunnel maintenance monitoring system in the tunnel which was installed in the Seoul metro line 5, 7 and 8, using that the domestic and foreign application case, results of analyzed maintenance monitoring in the domestic tunnel and legal safety management standard of the facility. The results of the monitoring management about analysis frequency to the present are considered that the problem about measuring frequency does not occur. According to the analysis results of the maintenance monitoring which are located on the 5, 6th subway line, they are analyzed that the stress of concrete lining and reinforced bar are converged gradually after 45 months. Therefore Monitoring of measurement and analysis frequency is conduct more often within about 4 years after the measuring instrument installation. Four years later, slowing the frequency of measurement is considered reasonable.

The Characteristics of Stress and Displacement due to the Diagonal Parallel Tunnel Excavation (대각선 병설터널 굴착에 따른 응력과 변위특성)

  • Kim, Youngsu;Pack, Songja
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.11
    • /
    • pp.39-49
    • /
    • 2011
  • In this paper it was focused on the characteristics of displacement and stress due to the construction of diagonal twin tunnel. In this research, the characteristics have been analyzed with the presumption that the tunnel's diameter (D) is 13m and the ground was formed by weathered rock. In analysis, the width of pillar is 2.0D, 2.5D, 3.0D, the height of soil cover is 3D, 4D, 5D, and the installation angle of diagonal twin tunnel has been changed into $15^{\circ}$, $30^{\circ}$, $45^{\circ}$. And the program used in this analysis is FLAC which is widely used in solution problems of ground engineering in order to gain and analyze occurring shotcrete and rockbolt stress and nearby ground displacement according to pillar width, the height of soil cover and installation angle of diagonal twin tunnel. As a result, in the weathered rock grounds, when the width of pillar is more than 2.0D, the height of soil cover is over 5.0D, and the installation angle of diagonal twin tunnel is lower, they lessen effects on the ground and favorable on the stability of tunnel.

A Study on Tunnel Loads in an Unconsolidated Ground with Inclined Layers (지층이 경사진 미고결 층상지반에서의 터널 작용토압에 관한 연구)

  • Park, Si Hyun;Kim, Young Su
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4C
    • /
    • pp.275-282
    • /
    • 2006
  • Since tunnels are linear type structures that have a long extent in comparison to their excavation or inner section, tunnels must be constructed in various ground conditions. In this study, laboratory model tests and theoretical analysis on a tunnel loads are carried out in the unconsolidated ground with inclined layers for tunnel excavation. Laboratory model tests are performed with the variation in the angle of the inclined layers and tunnel depth for the model ground with inclined layers. As for the ground materials, two dimensional model ground is prepared with aluminum rods and blocks with no cohesion, which are frictional resistance free between testing apparatus walls and ground materials, by establishing the ground materials self-supporting. Moreover tunnel load equation are newly induced so that comparisons between model test results and the theoretical results are conducted as well.

The study on interval calculation of cross passage in undersea tunnel by quantitative risk assesment method (해저철도터널(목포-제주간) 화재시 정량적 위험도 평가기법에 의한 피난연결통로 적정간격산정에 관한 연구)

  • Yoo, Ji-Oh;Kim, Jin-Su;Rie, Dong-Ho;Shin, Hyun-Jun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.3
    • /
    • pp.249-256
    • /
    • 2015
  • Quantitative Mokpo-Jeju undersea tunnel is currently on the basis plan for reviewing validation. As for the cross section shape for express boat of 105 km line, sing track two tube is being reviewed as the Euro tunnel equipped with service tunnel. Also, 10 carriage trains have been planned to operate 76 times for one way a day. So, in this study, quantitative risk assessment method is settled, which is intended to review the optimal space between evacuation connection hall of tunnel by quantitative risk analysis method. In addition to this, optimal evacuation connection hall space is calculated by the types of cross section, which are Type 3 (double track single tube), Type 1 (sing track two tube), and Type 2 (separating double track on tube with partition). As a result, cross section of Type 2 is most efficient for securing evacuation safety, and the evacuation connection space is required for 350 m in Type 1, 400 m in Type 2, and 1,500 m in Type3 to satisfy current domestic social risk assessment standard.

Effect of Separation Between Main and Divergent Tunnels in Divergence Section of Double-Deck Tunnel on the Stability (복층터널 분기구에서의 터널 이격에 따른 안정성 영향)

  • La, You-Sung;Kim, Bum-Joo
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.2
    • /
    • pp.45-54
    • /
    • 2016
  • Double deck tunnels are considered to have a large demand in a near future for solving traffic congestion problems and overcoming the limitations in constructing new tunnels. This study presents a numerical investigation using finite element (FE) analysis on the behaviors of the tunnels and the stability of pillars in a divergence section where single tunnel is diverged from a main line double deck tunnel. The effects of the separation distance between the diverged and the main tunnels and the ground condition were examined through the FE analysis by varying the separation distance from 0.1D to 2.0D (D: diameter of main tunnel) and the rock class from class I to V, respectively, and the analysis results were compared with those using empirical methods, strength-stress ratio, and the volume of interference. The FE analysis results indicated that the separation distance has a larger effect on tunnel behaviors, compared with the rock strength, and a single tunnel with a large cross section is more favorable than two separated tunnels for tunnel stability when the separation distance is below 0.7D.

Current Technical Tendency of Chemical Grouting (약액주입공법의 국내ㆍ외 기술 동향)

  • 김진춘
    • Magazine of the Korea Concrete Institute
    • /
    • v.14 no.5
    • /
    • pp.47-53
    • /
    • 2002
  • 근래 지구촌의 산업화가 가속됨에 따라 대지의 활용도가 급속하게 증가하고 있으며 아울러 인구의 증가 및 개개인 삶의 공간적 범주가 점점 확대되면서 지구상에 광범위하게 분포되어 있는 연약지반으로의 관심이 집중되고 있는 실정이다. 최근 국내에서도 고속철도, 인천국제공항, 도심지 지하철 및 서ㆍ남해안 항만공사 등 대규모 국가건설공사가 진행 중에 있으며 더더욱 임해시설의 확충이라든지 인공섬 등의 건설이 활발해지면서 연약지반에 대한 관심이 고조되고 있다. 하지만 연약지반의 특성을 경시한 나머지 터널의 붕락, 주변지반 및 인접건물의 부등침하, 측방유동에 의한 구조물변위 등 대형 안전사고가 빈발하게 발생되어 왔다. 이러한 안전사고의 대책으로서 지반보강을 위한 여러 가지 신공법이 개발되었고, 새로운 터널보조공법이 국내 지하철건설현장에서 널리 쓰여지고 있으며 이러한 공법 등을 통한 성과도 적지 않게 보고되고 있다.(중략)

A Study of Ventilation Requirements for Tunnel Considering Recirculation near Tunnel Portals (인접 터널로부터의 재유입을 고려한 터널 내 소요환기량 산정 연구)

  • Rie, Dong-Ho;Choi, Baek-Yeol;Yoon, Sung-Wook
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.3
    • /
    • pp.66-70
    • /
    • 2010
  • This paper analyzes difference between current tunnel ventilation calculation method and advanced one which considers effects of polluted air recirculation near tunnel portals. For the calculation, CFD(Computational fluid dynamics) technique was utilized. From the result, it was found that 4.38% more fresh air is required when there is polluted air recirculation near tunnel portal areas. Hence, it is recommanded that the consideration of polluted air recirculation should be made when deciding the ventilation requirements for tunnel.