Setting Time and Strength of Slip-form Method Applied Caisson in Low-temperature Period (슬립폼공법 적용된 동절기 케이슨의 온도에 따른 응결시간 및 압축강도)

  • Kim, Bong-Joo;Kim, Jae-Hun;Kim, Chan-Soo;Jo, Ho-Kyoo
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.6 no.1 s.20
    • /
    • pp.1-7
    • /
    • 2006
  • In the harbor construction work, caisson is made by slip-form method and curing temperature of caisson concrete need heating in the low-temperature. To get the setting time and compression strength of slip-form method applied caisson at various curing temperature. The curing temperature is divided to the temperature of slip-form and the temperature of second curing curtain. In consideration of setting time, compression strength of concrete and form-removal time, the best temperature is $25^{\circ}C$ at 6 hours slip-form curing time.

라이닝콘크리트의 양생시스템 개선

  • Yu, Yeong-Seon;Kim, Yong-Ha;Mun, Byeong-Tak;Lee, Hyeon-Gu;Gwon, Gi-Hwal;Im, Ju-Yeong
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.13 no.2
    • /
    • pp.41-49
    • /
    • 2011
  • 양북터널은 굴착과 동시에 라이닝콘크리트를 타설하였다. 터널굴착과 라이닝콘크리트의 동시시공을 위한 적정시공 Cycle을 결정하고, 이에 따른 양생기간과 양생온도를 설정하는 순으로 시험하였다. 라이닝콘크리트는 품질관리를 위해 보온장치를 탑재한 Sliding form과 양생대차를 운영하고, 균열을 최소화하기 위해 양생온도와 양생시간 및 탈형강도 등을 시험에 의해 결정하였다. 시험과정은 터널내부와 라이닝콘크리트 내부온도를 계절별로 측정하고, 양생온도별로 콘크리트의 강도를 측정하였다. 거푸집 탈형시 콘크리트 온도가 터널내부의 온도로 수렴하기까지는 $15{\sim}20^{\circ}C$의 차이로 측정되었고, 거푸집 탈형을 위한 콘크리트 초기강도 4MPa을 발현하는데는 양생온도에 따라 차이가 발생하지만 시공 Cycle에 적합한 양생시간은 약 20시간이고, 이 때의 양생온도는 $23^{\circ}C$ 이상이었다. 위의 시험결과대로 현장에서 라이닝콘크리트를 양생한 결과 시공 Cycle과 압축강도 및 콘크리트면의 외관 등이 만족한 결과를 나타내었다.

  • PDF

Characteristics of Compressive Strength of Concrete due to Form Curing Condition (거푸집 양생 조건에 따른 콘크리트의 압축강도 특성)

  • Kim, Kyoungnam;Park, Sangyeol;Moon, Kyoungtae;Shim, Jaeyong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.1
    • /
    • pp.19-28
    • /
    • 2018
  • The time for form removal is an important factor for ensuring the safety and economical efficiency of concrete structures, because it affects the quality, period, and cost of construction. Although local specifications suggest the form curing time, there is a problem of low quality of concrete due to early removing of form. This is because they do not fully understand effect of curing condition, and they want to shorten construction period in the field. Therefore, this research evaluates the effect of curing condition according to the time for form removal by testing specimen. As a result, the concrete compressive strength at the age of 28 days decreased about 40% in the condition of form removal after 12 hours, while the strength in the condition of form removal after 28 days decreased about 7%. Finally, this paper suggests an estimating equation for the concrete compressive strength due to the time for form removal considering various curing temperatures as equivalent ages. The proposed equation can be used in the field for evaluating the strength after form removal.

ALC(Autoclaved Lightweight Concrete) Hardness Prediction by Multiple Regression Analysis (다중회귀분석을 이용한 ALC 경도예측에 관한 연구)

  • Kim, Kwang-Soo;Baek, Seung-Hoon;Chung, Soon-Suk
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.7 no.2
    • /
    • pp.101-111
    • /
    • 2012
  • In the ALC(Autoclaved lightweight concrete) manufacturing process, if the pre-cured semi-cake is removed after proper time is passed, it will be hard to retain the moisture and be easily cracked. Therefore, in this research, we took the research by multiple regression analysis to find relationship between variables for the prediction the hardness that is the control standard of the removal time. We study the relationship between Independent variables such as the V/T(Vibration Time), V/T movement, expansion height, curing time, placing temperature, Rising and C/S ratio and the Dependent variables, the hardness by multiple regression analysis. In this study, first, we calculated regression equation by the regression analysis, then we tried phased regression analysis, best subset regression analysis and residual analysis. At last, we could verify curing time, placing temperature, Rising and C/S ratio influence to the hardness by the estimated regression equation.

  • PDF

Strength Properties of Concrete According to Types of High Early Strength Cement and Curing Method (조강형 시멘트의 종류 및 양생방법에 따른 콘크리트의 강도특성)

  • Chang, Chun-Ho;Lee, Wang-Sup;Jung, Yong-Wook;Chung, Youn-In
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.1
    • /
    • pp.76-84
    • /
    • 2017
  • This study selected a method which uses high early strength cement as a way to reduce the curing time and curing energy source of concrete secondary products and reviewed the improvement in the initial strength of concrete secondary products setting the target strength of the concrete capable of removing the form to 15MPa and the curing time to 6 hours. As a result of the test, the only specimen which achieved the form removal strength of 15 MPa only through atmospheric curing within the target curing time of 6hours was ACC-100, and the specimens of TRC-100 and TRC-50 satisfied the values of 6 hours and 15MPa through steam curing. However, we could see that it was difficult to secure workability in the case of the specimen of ACC-100 due to its high rapid setting property and a retarder such as anhydrous citric acid was required to be used to improve the workability. When we look into the pattern following changes in the water to binder ratio, while, in the case of stream curing, OPC-100, TRC-100, and TRC-50 were all found to satisfy achievement of the form removal strength within 6hours as the water to binder ratio decreased, in the case of atmospheric curing, TRC-100, and TRC-50 achieved 15MPa within 12hours.

Field Application of High Strength Concrete by Cement Types Using Maturity (적산온도를 이용한 시멘트 종류별 고강도 콘크리트의 현장 적용성)

  • Kim, Dong Baek
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.3
    • /
    • pp.472-478
    • /
    • 2020
  • Purpose: The purpose of the study is to help economic and safe construction by accurately predicting the initial strength of high-strength concrete (70MPa) for each type of cement, securing reliability of concrete quality, and drawing accurately the timing of form deformed, tensioning time of PS concrete, and openning of traffic after road repair with maturity. Method: Calculate the maturity by measuring the hydration heat with cement type for each age, and measure the strength of concrete with age to predict the strength corresponding to the any maturity. Result: In estimating the time required for traffic opening in road repair, ASTM C1074 was theoretically estimated at 16.4 hours for high-strength concrete, but in this study, maturity was calculated at 307, 14.4 hours for OPC and maturity at 2700, 34 hours for LHPC and maturity 200, 8 hours for ESPC. Conclusion: The timing of form deformed of structures using high-strength concrete and the opening of traffic of road repair may be much faster than in the case of concrete using OPC below the design basis strength 40MPa applied by ACI Committee 347.

Determination of Removal Time of the Side Form in High Strength Concrete (고강도콘크리트 시공시 측면 거푸집 탈형시기의 결정)

  • Han Cheon-Goo;Han Min-Cheol
    • Journal of the Korea Concrete Institute
    • /
    • v.16 no.3 s.81
    • /
    • pp.327-334
    • /
    • 2004
  • In this paper, method for the determination of removal time of the side forms in high strength concrete are discussed using the estimation model of compressive strength development, the development of bond strength and rebound number of P type Schmidt hammer in order to review the validity of existing regulation as to side form removal and offer effective quality control method. According to the results, as W/B increases by $10\%$, the setting time is shortened by about 2 hours. In the scope of the paper, required time to gain 8MPa of compressive strength is determined about 17 ${\~}$20 hours of age and $21{\~}25^{\circ}D{\cdot}D$ of maturity. Bond strength between form and concrete shows the highest value around final setting time, but decreases drastically after that. Amount of concrete sticking on the form is large before setting completed, but after that, its amount shows decline tendency. The rebound value test with P type schmidt hammer can be started faster by 2${\~}$3 hours than compressive strength test. It is also confirmed that the removal of forms is possible when the rebound value of P type schmidt hammer is more than 32. It is found from the results that existing regulation regarding removal time of the side form of high strength concrete provided in KCI needs no revision because required time to gain the strength provided in KCI has no adverse effect on strength development at early age and surface condition during stripping the side form. Effective procedure to decide the removal time of side form can be performed by applying P type Schmidt hammer.

An Experimental Study on the Early Strength Prediction of Concrete by Maturity Method (적산온도법을 이용한 콘크리트 조기강도 예측에 관한 실험적 연구)

  • Kwon, Hae-Won;Bae, Yeoun-Ki;Kim, Suk-Il;Jee, Suk-Won;Lee, Jae-Sam;Song, In-Myung
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.753-756
    • /
    • 2008
  • Recently, construction work period reduction is a very important topic of construction business circles. Because that is just big cost reduction. There is an important part of construction to decide the removal time of form. For prediction strength for removal form, P type schmidt hammer method and maturity method is used that. In case early strength prediction of maturity method, that is problem. Because setting duration of concrete is not proper considering. So this experimental study is a coefficient(A) of maturity method.

  • PDF

A Study on the Effect of Accelerated Curing on 28-Days Compressive Strength of Concrete (촉진양생이 콘크리트의 28일 압축강도에 미치는 영향에 관한 연구)

  • 최세규;유승룡;김생빈
    • Magazine of the Korea Concrete Institute
    • /
    • v.8 no.4
    • /
    • pp.141-148
    • /
    • 1996
  • The pulished works on Accelerated Curing Effect were generally performed around from 1960 to 1970th century for 18 to 24 hours - total curing periods. It is not possible to define the effect of temperature rise because those results were obtaine mainly by using the manually operated steam-curing tank. Thus, it may not be available to apply those data immediately on the domestic PC wall production line. The testing specimens were made from the standard mix proportion according to those of domestic PC factories to establish a basic data for the Accelerated Curing Effect. The experimental tests were conducted according to the conditions of each sub-curing periods. By comparing the results of compression tests on de-molded and 28-day water-curing specimens, we find that the most effective curing condition to obtain more than the required design strength after 28 day of water curing may be as follows: the presteaming period does not affect seriously and less than$30^{circ}C/hr$- the rate of temperature rise andless than $82^{circ}C$ - maximum temperature are necessary. It seems that post-curing procedure is very important factor to increase the effect of accelerated curing.

A Study on the Energy Consumption Cost in the Winter and Calorific Value by Insulated Gang-form (단열갱폼 적용에 따른 동절기 보양비 사용량 및 발열량 검토에 관한 실험적 연구)

  • Nam, Kyung-Yong;Choi, Suk;Ahn, Sung-Jin;Lim, Myung-Kwan
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.1
    • /
    • pp.53-60
    • /
    • 2020
  • This paper aims to examine the insulation performance of insulated gang form by changing the energy (power) consumption and concrete calorific value to assist in concrete protection in cold weather. According to the test results, the general gang form will generate three times the energy (power) consumption for 12 hours after the concrete is poured. In contrast, insulated gang foam consumed no energy (power) for 21 hours after pouring. The final power consumption was 3.7 times higher than that of the general gang form, confirming the improved performance of insulated gang form with regard to energy (power) consumption. The calorific value examination shows that the calorific value changes significantly according to the change of outside temperature after concrete placement in the case of the general gang form. However, in the case of the insulated gang form, only a slight heat loss occurred in the part of the frame, and it showed a constant heating pattern from the concrete casting to the demolding of the mold.