Regression Technique-based Productivity Estimation conducting Construction Delay Factor Analysis on Interior Works in High-rise Building Construction (공기지연요소분석을 이용한 회귀분석 기반 초고층 내부공사의 생산성 예측)

  • Kim, Hyun-mi;Kim, Tae-Hyung;Shin, Young-Keun;Kim, Young-Suk;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.191-192
    • /
    • 2011
  • The construction projects contain a lot of variables and risk affecting productivity. The duration of the project must be recognized important as for quality, unit cost and safety. There is need for improving work efficiency by investigating relationship of works to prevent delay. This study focuses on analysing the delay factors of steel staircase system to suggest regression model that enables construction productivity estimation. The position of the observers and construction delay factors were expressed by the independent variable of the regression model and productivity was expressed by a dependent variable. This paper suggests quantitative productivity and it is expected that will be helpful estimating application in construction new technologies.

  • PDF

Development of Three Dimensional Analysis Method of High-Rise Buildings Considering the Construction Sequence and the Inelastic Behavior (시공 단계 및 비탄성거동을 고려한 초고층 건축물의 3차원 해석 기법 개발)

  • Yang, Joo-Kyoung;Seol, Hyun-Cheol;Kim, Jin-Keun
    • Journal of the Korea Concrete Institute
    • /
    • v.20 no.2
    • /
    • pp.249-256
    • /
    • 2008
  • With consideration of the ongoing construction of high-rise buildings, it is becoming increasingly important to be able to accurately predict the behavior of them on the stage of design, construction and service. Even though many researchers have developed the analysis method to predict the behavior of high-rise buildings, their studies were based on the two dimensional frame structures composed of line elements such as beams and columns. Recently the high-rise buildings with flat-plate system is widely used because of its advantages. In this study a three dimensional analysis method is developed to analyze the behavior of the high-rise buildings with flat-plate system since it is difficult to model the structural systems reasonably with the existing two dimensional analysis method. The analysis method considered the construction sequence including the temporary work such as installation of form, removal of form, installation of shore, and removal of shore. Line elements were used to describe columns, beams, and shores and plate elements were used to model slabs. The creep and drying shrinkage of concrete were also considered to account for the inelastic behavior of concrete.

The Application of Post-tensioned Slab System to Tall Buildings (초고층 건축물의 포스트텐션 슬래브 시스템 적용)

  • Chung, Kwang-Ryang
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.879-882
    • /
    • 2008
  • The market of Korea of post-tension system for building is growing up since 2000 and many engineers and construction companies show interest in it. This paper introduces the structure system and construction of post-tension tall buildings including recent trend in the industry of post-tension system for buildings in Korea and the point to be considered when design post-tensioned tall building. Park Polis is composed of two towers of 39 stories with a level to the top of the roof +144m and is currently under construction at Ulsan in Korea. This building designed as the unbonded post-tension floor system and will be the tallest and first high-rise post-tensioned building in Korea. The structural system is composed of the flat slabs, perimeter columns and core walls. At first, this building had designed as regular RC flat slab with perimeter beams. However, floor structure system was reconsidered because the construction company wants to improve efficiency of construction. As a result, the floor system of PARK POLIS re-designed as PT flat slab.

  • PDF

Lifting Work Process Optimization Method in High-rise Building Construction Through Improvement of CYCLONE Modeling Method (CYCLONE 모델링 기법 개선을 통한 초고층 공사의 자재 양중 작업 프로세스 최적화 연구)

  • Hawng, Doowon;Kwon, Okyung;Choi, Yoonki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.58-70
    • /
    • 2017
  • The planning for material lifting operations is one of the key processes in high-rise building construction. Several previous studies have used rough calculations by referring to existing practices or establishing a target value for lifting cycle time or operating rate. Therefore, the purpose of this study is to propose a material lifting process optimization method for reducing the lifting cycle time and increasing the operating rate. In this study, we improve the cyclic operation network (CYCLONE) modeling method that considers the duration and zone information of each work task. This method can be used to hand over work tasks to another crew group in the work process. According to this methodology, this study optimizes the material lifting process, performs a sensitivity analysis, and evaluates the field applicability of the proposed material lifting process optimization method. Therefore, the optimized process was then applied to a high-rise building construction site. The lifting work process time and operating rate for the simulated as - is lifting process data, optimized process data, and field application result data were compared for each lifting height. From this comparison, the effectiveness of the optimization methodology was confirmed.

A Simple Formula for the Number of Lifting Times of Finishing Materials in High-rise Complex Building Construction (마감자재 양중횟수 산정 약산식 제안 - 초고층 주상복합 건물)

  • Mun Min-Sik;Choi Seock-Hyun;Hyun Chang-Taek;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.622-625
    • /
    • 2003
  • The purpose of the study is to propose a simple formula of lifting times of finishing materials on establishing the high-rise complex building, it is expected to help the efficient planning of lifting. The planning of lifting the finishing materials becomes important as the buildings get higher. The efficient level of lifting times has been calculated from 'Packaging' to improve the existing studies on the planning of lifting ; 'Packaging' means 'Making a bundle as one unit' basing on the characteristics of the individual materials. The simple formula has been produced regarding two variables of the typical floor area and the number of rooms per area.

  • PDF

Comparative Study of Strength and Weakness of System Form in High-rise Building Project (초고층빌딩 거푸집 공사의 장단점 비교에 관한 연구)

  • Park, Byung-Joo;You, Seong-Kue;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.9-10
    • /
    • 2012
  • According to the recent trends in the construction business have been actively booming both overseas plant orders and high-rise buildings orders. In addition high-rise building projects have being promoted or is actually under construction in Korea. Frame structure review which is the most consuming period on high-rise building is essential on that project. In this study looks for the currently form system and compares to those large system used in high-rise buildings.

  • PDF

A Study on the Work-Planning Method of High-rise Building (초고층 건물의 구조체 공사의 작업계획방법에 관한연구)

  • Kim Dae-Gil;Hwang Jae-Hoo;Jung Ho-Geun;Kim Ju-Hwan;Lee Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.129-132
    • /
    • 2006
  • Recently, Society increasingly need the hish-rise building because of urban population concentration. and The hish-rise building need new systematic work-planning method. but it didn't use the construction project's work plan and management. his paper investigated efficient work-planning method. and the work-planning method in using domestic High-rise building's structure work. A investigated result is TACT, DOC LOB etc. and domestic using method is 3day and 4day-Cycle among the Tact. This paper is to compare and analysis two method. a purpose of paper is to analyse application through the case of using the work-planning method. also To find efficient method.

  • PDF

A Study on the Fire Resistance in Building Construction for Performance Based Design (성능 위주 설계를 위한 화재저항에 관한 연구)

  • Jung, Soo-Young;Kim, Tae-Hyun
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2011.04a
    • /
    • pp.457-461
    • /
    • 2011
  • 최근에 초고층 빌딩의 수요 증가에 따른 성능위주설계에 대한 관심이 고조되고 있다. 이에 건축 공사에 있어서 가장 중요한 요소인 화재 저항에 대해서 외국 사례 및 적용 방법에 대한 개념을 이해함으로서 보다 효과적인 건축물 시공에 도움이 되고자 한다.

  • PDF

A Study on Analysis and Improvement of Furniture Work for Just-in-Time (적시생산방식을 이용한 가구공사 개선방안에 관한 연구)

  • Kim Hyun-Woo;Song Young-Woong;Ahn Jae-Bong;Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.71-78
    • /
    • 2004
  • In this study, the concept of Just-In-Time, Lean Construction and Supply Chain Management have been applied to furniture works of high-rise residental building. For the purpose of systematic furniture work planning, it should be established to analyse furniture-work process from design phase through contract, and procurement to construction phase. The analysis of process and data for furniture-work provides the roles of conducting subjects and presents management items at each phase. This proposal will provide the systematic furniture-work managements and reduce construction time and cost, and also raise the quality of furniture works.

A Case Study on the Cause and Reinforcement of Railroad Facilities Settlement According to the Ground Excavation (지반굴착에 따른 철도시설물의 침하 원인 및 보강 사례연구)

  • Oh, Beyung-Sam
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.10
    • /
    • pp.85-94
    • /
    • 2012
  • Recent development trend of construction projects in the urban area is the efficient use of insufficient land, however caused to difficult construction conditions because of many adjacent structures. This paper presents the case study that analyzed the ground settlement of railroad structure for the double track railway project of Gyeongui line, adjacent to the high rise building under ground excavating for substructure work, considering interaction of soft ground characteristics. Field survey and measurement works were carried out during construction of station and excavation of high rise building, and field data were analyzed to find the source of settlement of platform and railway. In addition, the soil reinforcement and foundation restoration were performed using in-situ injection method, i.e., D-ROG(Digitalized Restoring On Grout) method which filled the pore of bottom and around of foundation with micro-cement.