델파이 기법을 이용한 초고층 건축시공의 공사비 상승요인 분석방법에 관한 연구 (Analysis of Cost-Increasing Factors in High-rise Building Construction Projects Using Delphi Method)

  • 이병훈;진현수;김경훈;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.105-109
    • /
    • 2010
  • Nowadays, the construction of high-rise building is rapidly increasing. There are many cost-increasing factors to the management in the high-rise building construction. For large and complex projects like the high-rise building construction, the more systematic methods and tools are needed for cost control. It is important to identify major cost control items and to manage them for effective cost management in the high-rise building construction. This study proposes a method of identifying major cost-increasing factors in the high-rise building construction based on the Delphi method.

  • PDF

초고층 거푸집 공사의 시공성 검토를 위한 3D Printing의 활용 (Application of 3D Printing Technology for Formwork Constructability Review in Tall Building Construction)

  • 이준혁;이동민;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 추계 학술논문 발표대회
    • /
    • pp.69-70
    • /
    • 2016
  • The constructability of formwork has a significantly influence on the duration and cost in tall building construction. However, current installation and dismantling process are conducted with heuristic approaches due to the absence of reasonable constructability review method. This study proposes a new method to review the constructability of formwork by utilizing 3D printing technology. It is expected that the suggested review method could reduce formwork duration and cost with subjective, but rational manner.

  • PDF

국내 초고층 주상복합 건축물의 구조시스템 유형과 콘크리트 강도 조닝 분석 (A Study on the Structure Types and Concrete Strength Zoning of Domestic Tall Apartment Buildings)

  • 김상연
    • 토지주택연구
    • /
    • 제4권3호
    • /
    • pp.295-301
    • /
    • 2013
  • 본 논문에서는 국내의 초고층 주상복합건축물들에 대하여 층수와 높이 등의 규모 및 구조형식과 횡력저항 시스템의 유형 및 사용 재료의 강도와 층별 콘크리트 강도의 조닝 등에 대하여 조사 분석하여, 이를 토대로 초고층 주상복합 건축물의 구조 계획 유형을 분석하였다. 조사한 결과, 국내 초창기 초고층 주상복합 건축물의 구조시스템은 도곡동 타워팰리스와 같이 철골철근콘크리트구조(SRC)로 건설된 사례가 많았으나, 2005년 이후에는 대부분이 철근콘크리트(RC)구조로 건설되었다. 구조체에서 코어부분을 전단벽으로 배치하여 횡력저항 시스템으로 활용하고 있고, 콘크리트의 강도는 층수에 따라 고층부, 중간부, 저층부로 나누어 강도를 조닝하여 적용하고 있었다. 사례조사를 토대로 국내에 주상복합건축물의 대표적인 유형으로 건설되고 있는 40층 및 60층 규모의 건축물에 대한 구조계획 기초자료를 제시하였다.

초고층 주상복합건물의 수장공사 공정관리 및 품질관리 방안 (The Program of progress control and quality control for the high-rise compound building)

  • 정을규;임칠순
    • 한국건축시공학회지
    • /
    • 제3권4호
    • /
    • pp.111-117
    • /
    • 2003
  • Recently SAMWOO EMC received order and built interior walls which was used the day process in several high-rise compound buildings. On the way to build, this process was brought about several matter according to the progress and qualify control. So, this study is the improving way of the dry process from experiences on those constructions

초고층 복합시설물의 4D CAD 모델링 사례연구 (Case Study of 4D CAD Modeling in Hi-Rise Complex Buildings Project)

  • 권오성;박우열;조훈희;강경인
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.187-192
    • /
    • 2001
  • 국내 건설생산체계는 설계단계에 시공성의 반영이 어려워 시공단계에서 많은 시행착오와 잦은 선계변경이 요구되고 있다 특히 불확실성이 높은 도심지 건축될, 그 중에서도 초고층 복합 건물 프로젝트의 경우, 시공과정을 반영한 설계의 중요성은 더욱 중요한 요소가 된다. 본 연구에서는 국내 정보분류체계를 근간으로 기초조사를 통하여 현장의 시공계획에 필요한 데이터를 수집 이를 시스템화 할 수 있는 방안을 모색하였다. 또한, 이를 본 시스템에 적용하여 3D CAD와 공사 계획 및 시뮬레이션 시스템으로 공정 시뮬레이션 및 타워 크레인 시뮬레이션을 구현하여 초고층 공사 수행시 발생할 수 있는 문제점을 미리 검토 및 해결하여 초고층 프로젝트 공사의 합리화와 생산성 향상을 위한 공사관리시스템을 실제 프로젝트에 구현하였다.

  • PDF

초고층 창호공사 조기착공을 위한 ACS-Lift Car 연계 시스템 기초연구 (The Study on Integrated ACS and Lift Car System for Early Beginning of Windows Work in Tall Building Construction)

  • 이동윤;임현수;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.72-73
    • /
    • 2014
  • Recently the concurrent construction method of framework and windows work has been applied for early beginning of exterior finishing works in tall building construction. However, the conventional method makes difficulties in auto-climbing of gang-form and climbing work of lift car since the removal of ACS(auto climbing system) should be preceded for operation of lift car up to the top floor. This study propose a concept model of integrated ACS and lift car system to resolve these problems and begin windows works early in tall building construction.

  • PDF

초고층 공사 리프트의 그룹제어 시스템 적용을 위한 기초 연구 (A Preliminary Study to Apply Group Control System to Lifts for High-rise Construction)

  • 김태훈;임현수;김창원;김승우;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.260-261
    • /
    • 2017
  • The objective of this study is to propose the basic design plan of system by comparing and analyzing application environment of lift and elevator group control system, as preliminary study for the application of group control system to lifts for high-rise construction. The basic design plan is suggested in terms of group control algorithm, hall call system type, operation information recording device, information communication method, and operation method. The results of this study can be used as basic data for software and hardware design for application of group control technology of lifts for super tall building construction and ultimately contribute to improve the operation efficiency of lift for high-rise construction.

  • PDF

초고층 아웃리거층 골조공사의 주요 공기지연 요인 도출 (The study on the Derivation of major delay factors in Outrigger Framework of Tall Building)

  • 김완섭;이동윤;이명도;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.190-191
    • /
    • 2015
  • Construction delays occur frequently in outrigger framework of tall buildings due to the unexpected conditions and lack of experience. However, delay factors of the outrigger framework has not been managed efficiently. Therefore, the systematic management is needed by perceiving possible delay factors before constructing management system. In this study, the major delay factors of outrigger framework are conducted to derive by using the Importance Performance Analysis(IPA). It is expected that the results of this study are utilized for planning of systematic scheduling in outrigger framework of tall building.

  • PDF

제진장치를 적용한 초고층 주거형 건축물의 횡변위 제어 성능 평가 (Performance Evaluation of the Drift Control in Residential Tall Building Using the Dampers)

  • 박지형;김태호;김욱종;이도범
    • 한국전산구조공학회논문집
    • /
    • 제21권3호
    • /
    • pp.265-273
    • /
    • 2008
  • 최근 급속하게 증가하고 있는 초고층 건축물은 바람이나 지진에 의한 횡변위를 효율적으로 제어하는 기술이 매우 중요하다. 그러나 국내의 초고층 주거형 건축물에 주로 사용되는 횡력 저항 구조시스템인 아웃리거 시스템은 별도의 공간을 요구하여 시공이 어렵고 공사 기간이 오래 걸리는 등의 불리한 점들이 있다. 반면 근래에 사용되고 있는 제진 시스템은 동적 하중에 의한 진동에너지를 부가적인 제진장치에 집중시킴으로써 건물의 횡변위를 저감시키며, 댐퍼의 설치도 비교적 용이하다. 또한, 아웃리거 설치와 같은 횡변위 제어시스템은 강성증가로 인해 풍응답이 증가되어 거주자의 불편과 같은 사용성 문제가 발생하기도 하며 이는 다른 추가적인 제어방식을 요구하게 된다. 따라서 본 연구에서는 초고층 주거형 건축물에 대한 횡변위를 효과적으로 제어하면서 아웃리거시스템을 대체 또는 보완할 수 있는 새로운 방법으로써 다양한 제진장치를 적용하여 각각의 횡변위제어 성능을 검토해보았다.

타워팰리스 III 현장의 첨단 시공 및 엔지니어링 기술 적용사례 (Applied cases of advanced construction & engineering technology at Tower Palace III Project)

  • 왕인수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.202-213
    • /
    • 2003
  • 타워팰리스 III 현장은 현존하는 국내 건축물로는 가장 높은 초고층 주상복합건물이다. 초고층 현장에는 일반현장과는 다른 시공기술 및 엔지니어링 기술의 적용이 요구되는 바, 타워팰리스 III 현장은 지금까지 축적된 기술을 바탕으로 보다 발전된 시공기술과 엔지니어링 기술, 그리고 공정관리기법을 통하여 마감공사 포함 충 당 13.4일이라는 공사 속도를 달성하였다. 이와 같은 공사를 성공적으로 수행하기 위하여 적용된 첨단 시공기술로 1) 골조공사 및 외벽공사의 3-Day Cycle을 달성하기 위한 여러 가지 공법, 2) 초고층 주거건물의 마감공사 공정관리를 위한 Tact 공정관리 시스템, 3) 현장관리 시스템으로 물류관리 및 정보공유 시스템 등이 적용되었다. 또한 엔지니어링 요소기술로 1) 고유동 무다짐 콘크리트와 국내 최초의 압축강도 $800kgf/cm^{2}$의 초고강도 콘크리트 등의 New Material, 2) 냉각수 순환형 파이프쿨링 시스템 등의 New Method, 3) Smart Fan Control 주방환기 시스템을 포함한 Mechanical System 4) False Car System을 포함한 Electrical System 등이 있다.

  • PDF