A Case Study on the Risk Impact and Loss Cost of Temporary Aircraft Runway Construction (임시 활주로 건설공사의 위험영향 및 손실비용 사례분석)

  • Kang, Hyunwook;Lee, Wonbae;Kim, Minjung;Kim, Yongsu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.32-39
    • /
    • 2020
  • The purpose of this study is to derive the risk factors that occurred during the construction of the temporary aircraft runway and to analyse the risk costs and loss costs. For this purpose, actual construction data made during the construction of the aircraft runway were investigated. And the risk factors that occurred during the construction work were derived. So the increased construction costs and loss costs due to risk factors were analyzed. The results of this study are as follows: 1)The number of risk factors that occurred during the construction of the aircraft runway was derived from eight. 2)It was calculated that the total risk cost of 5.2million won, the risk cost of the owner's should be 243 million won and the cost of the contractor should be 277million won. 3)Owner's was up 2.36% from its planned budget and the contractor lost -277million won out of its planned profit of 443million won, resulting in a residual profit of 165million won. The results of the study are used as a reference for estimating risk factors and contingency that should be considered in aircraft runway construction.

The Proposal on the Rational Reorganization of the Radio stations Management : Focusing on the Introduction of SDoC for Radio Inspection for Telco (무선국 관리의 합리적 개선방안에 관한 제안 - 무선국의 자기적합성선언 제도 도입 검토를 중심으로 -)

  • Ho-Yeong Kim;Won-Il Roh;Seong-Jhin Choi
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.18 no.5
    • /
    • pp.737-746
    • /
    • 2023
  • As the core infrastructure to lead technical innovation for the fourth industrial revolution, economic value and utilizations of radiowaves are increased rapidly. The objectives of this study are to recognize the growing trend of radio stations that transmit information using radiowaves, a limited resource of the country, and to propose developed plans for the radio stations operation system in line with the changing radio technology and use environment. To be specific, the detailed implementation procedures and methods of the system were derived in accordance with the government's plan to convert the complete inspection of radio stations into a SDoC(Self Declaration of Conformity) by the telco. SDoC is a policy that grants autonomy and responsibility for radio waves interference management to existing telecom operator recognized as having radio stations operating capabilities. It has significance in that the function of radio stations inspection, which is a representative technical regulation, is efficiently distributed to the government and the private sector. This study has significance in providing reference for expediting deregulation in the radiowaves management policy.

A Study on the Unfair Aspect of Specific Provisions in the Construction Contract : Counterplan and Institutional Reformation (건설공사 계약서상 불공정특약에 대한 대처방안 및 제도개선에 관한 연구)

  • Choi Jea-Won;Park Keun-Hyung;Kim Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.146-153
    • /
    • 2004
  • The purposes of this study are to survey unfair aspects of specific provisions in the construction contract, and to suggest counterplans and institutional reformations. The research method of this study includes judicial precedent analysis and a questionnaire survey, The results of this study are as follows: 1) the main problems of unfair specific provisions are payment condition, shifting of the responsibility and adjustment in the contract sum. 2) counterplans ate suggested according to the construction phase : bid, construction and completion phase. 3) institutional reformations include firming up regulations, supervision, invigoration of claim, development of variation guideline, and so on.

Improvement of Elevator Management System after Completion (준공 이후 승강기 관리체계 개선에 관한 연구)

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.5
    • /
    • pp.455-461
    • /
    • 2016
  • To operate a large structure or a high-rise building, elevator is essential. Nevertheless, elevator breakdowns or accidents have been consistently reported. When the accidents are not serious, the records are not reported and cumulated in the Korea Elevator Safety Agency. Additionally, in case of replacement or repair of the parts of elevator, conflicts about the person responsible for the expense of the replacement or repair are frequently occurred. However the record of accidents is not decreasing and the conflict about the fund of elevator repair is serious. So, it is needed to reduce the elevator accidents or malfunction, the operation stop of the elevator, the conflict between building owners and users. Therefore, in this study, the elevator maintenance procedures during defect liability period, the notification procedure in case of breakdown or accident elevator, the direction of elevator maintenance contracts, the direction of the elevator inspection were suggested.

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.

Apportionment of Liquidated Damages and Compensation for Delay Damages in Domestic Construction Project : Analysis and Improvement (국내 현행 공기지연 책임에 따른 지체상금 및 손실보상의 문제점 및 개선방안)

  • Kim, Kyong Ju;Kim, Kyoungmin;Kim, Jong Inn;Wei, Ameng;Kim, Eu Wang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.12-20
    • /
    • 2023
  • To calculate the amount of owner-caused and contractor-caused delays based on a simplified delay analysis, which has been customarily used in Korea, has a limitation in reflecting the impact of the concurrent delay and the acceleration work. It also resulted in the apportionment of liquidated damages by applying the ratio of the number of delays between the owner and the contractor. This study analyzes that the conventional method does not meet the international standards. In order to improve the problem of construction delay analysis and the apportionment of liquidated damages based on it, owner delays, contractor delays, concurrent delays, and the impact of acceleration should be analyzed together. This study suggests that in the apportionment of liquidated damages, the extension of time should be extended by the sum of concurrent delays and the owner-caused delays, and liquidated damages should be imposed on delays incurred after the extension of time. It can be seen that it conforms to the international standards. The results of this study are expected to contribute to improving the problems of delay analysis and liquidated damages calculation, which have been conventionally accepted.

A Study on Improvement on National Legislation for Sustainable Progress of Space Development Project (우주개발사업의 지속발전을 위한 국내입법의 개선방향에 관한 연구)

  • Lee, Kang-Bin
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.25 no.1
    • /
    • pp.97-158
    • /
    • 2010
  • The purpose of this paper is to research on the contents and improvement of national legislations relating to space development in Korea to make the sustainable progress of space development project in Korea. Korea has launched its first satellite KITST-1 in 1992. The National Space Committee has established "The Space Development Promotion Basic Plan" in 2007. The plan addressed the development of total 13 satellites by 2010 and the space launch vehicle by 2020, and the launch of moon exploration spaceship by 2021. Korea has built the space center at Oinarodo, Goheng Province in June 2009. In Korea the first small launch vehicle KSLV-1 was launched at the Naro Space Center in August 2009, and its second launch was made in June 2010. The United Nations has adopted five treaties relating to the development of outer space as follows : The Outer Space Treaty of 1967, the Rescue and Return Agreement of 1968, the Liability Convention of 1972, the Registration Convention of 1974, and the Moon Treaty of 1979. All five treaties has come into force. Korea has ratified the Outer Space Treaty, the Rescue and Return Agreement, the Liability Convention and the Registration Convention excepting the Moon Treaty. Most of development countries have enacted the national legislation relating to the development of our space as follows : The National Aeronautic and Space Act of 1958 and the Commercial Space Act of 1998 in the United States, Outer Space Act of 1986 in England, Establishment Act of National Space Center of 1961 in France, Canadian Space Agency Act of 1990 in Canada, Space Basic Act of 2008 in Japan, and Law on Space Activity of 1993 in Russia. There are currently three national legislations relating to space development in Korea as follows : Aerospace Industry Development Promotion Act of 1987, Outer Space Development Promotion Act of 2005, Outer Space Damage Compensation Act of 2008. The Ministry of Knowledge Economy of Korea has announced the Full Amendment Draft of Aerospace Industry Development Promotion Act in December 2009, and it's main contents are as follows : (1) Changing the title of Act into Aerospace Industry Promotion Act, (2) Newly regulating the definition of air flight test place, etc., (3) Establishment of aerospace industry basic plan, establishment of aerospace industry committee, (4) Project for promoting aerospace industry, (5) Exploration development, international joint development, (6) Cooperative research development, (7) Mutual benefit project, (8) Project for furthering basis of aerospace industry, (9) Activating cluster of aerospace industry, (10) Designation of air flight test place, etc., (11) Abolishing the designation and assistance of specific enterprise, (12) Abolishing the inspection of performance and quality. The Outer Space Development Promotion Act should be revised with regard to the following matters : (1) Overlapping problem in legal system between the Outer Space Development Promotion Act and the Aerospace industry Development promotion Act, (2) Distribution and adjustment problem of the national research development budget for space development between National Space Committee and National Science Technology Committee, (3) Consideration and preservation of environment in space development, (4) Taking the legal action and maintaining the legal system for policy and regulation relating to space development. The Outer Space Damage Compensation Act should be revised with regard to the following matters : (1) Definition of space damage and indirect damage, (2) Currency unit of limit of compensation liability, (3) Joint liability and compensation claim right of launching person of space object, (4) Establishment of Space Damage Compensation Council. In Korea, it will be possible to make a space tourism in 2013, and it is planned to introduce and operate a manned spaceship in 2013. Therefore, it is necessary to develop the policy relating to the promotion of commercial space transportation industry. Also it is necessary to make the proper maintenance of the current Aviation Law and space development-related laws and regulations for the promotion of space transportation industry in Korea.

  • PDF

Induction coordination of the 154KV system with direct grounding (154KV 계통직접접지전환에 따른 유도협조)

  • 손필영;원준희
    • 전기의세계
    • /
    • v.18 no.1
    • /
    • pp.33-37
    • /
    • 1969
  • 한전은 1968년 11월 3일 오전 10시 04분을 기하여 154KV 전계통의 직접접지방식 전환을 단행하였다. 종전의 P.C(소고선륜) 중성점접지방식을 직접접지방식으로 전환한것으로서 전력사상 특기 할 만한 근대화사업이며 다년간을 두고 추진해온 중요과제였다. 전력계통의 확대와 복잡화는 선진국가에서도 실시하고 있는 직접접지방식의 채택을 불가변하게 하였고 또한 1차 AID송배전차관도 이의 채택을 조건부로 승인되었던 것으로서 1968년 이후에 건설되는 송변전기기는 직접접지계에서만 운전할 수 있는 절연Level 650KV급이 도입되어 부산화력발전소 3호기가 준공되는 1968년 10월말까지는 직접접지전환이 반드시 이루어져야 하는 실정에 놓여 있었다. 그런데 직접접지방식의 단점인 인접통신선에 미치는 유도장해를 해결하는 문제가 다년간을 두고 진지하게 검토되어 왔으나 해결이 늦어지고 있었다. 사유는 154KV 계통에 인근된 통신선이라면 체신부, 내무부, 교통부, 국방부등 여러기관의 것이 있는데, 유도장해보안방법과 유도보상비문제에 대하여 전력측(상공부, 한전)과 통신측(상기의 체신부등)의 견해차가 해소되지 않기 때문이었다. 그것이 1968년 5월에 와서 전력.통신쌍방이 범국가적입장에서 제반애로를 무릅쓰고 최소한의 투자로 가능한 범위내의 보안책으로서 우선 Arrester 보안방식을 채택하기로 합의되어 경제장관회의를 거쳐 시공하기에 이른것이다. 이 란을 빌려 이 사업의 필요성과 경위및 통신선유도장해방지를 위한 보안방식내용을 간단히 소개함으로써 앞으로 이 분야의 항구적인 유도대책연구에 다소나마 참고가 된다면 다행으로 생각하겠다.면서 예측강우의 질이 저하되기 시작하였으나 QPM을 합성함으로써 생산한 BQPF는 보다 신뢰성있고 양호한 결과를 얻을 수 있었다. 이러한 결과들은 향후 정량적 분포형강우 예측을 이용한 실시간 홍수유출 예측시 댐운영자는 리드타임(홍수선행시간)을 충분히 확보함으로서 안정적이고 예측 가능한 홍수조절을 하는데 도움을 줄 수 있을 것으로 기대된다. 이와 같이 다양한 단기저수지 유입량의 예측정보 제공으로 다목적댐 저수지 운영모형의 효용성을 제고하여 향후 실제 저수지 유입량 예측에 이용함으로써 저수지 단기운영효율 개선에 기여할 수 있을 것으로 사료된다.다. 이것은 여름철 강수량이 증가하고, 호우발생빈도, 특히 8월의 강수일수가 증가하고 있다는 것과 밀접한 관련이 있다. 여름과 가을에 우리나라에 영향을 미치는 태풍의 수는 뚜렷한 추세를 보이지 않으나, 2002년 루사, 2003년 매미로 인하여 각각 6조원, 4조원 이상의 막대한 피해가 발생하였다. 태풍에 의한 피해액은 GDP 대비 약 0.9%(태풍 루사)로 최근 경제상장률과 비교해 보면, 상당한 비율을 차지한다. 우리나라에 영향을 미치는 태풍은 연근해의 해수면 온도가 높아지면 세기가 강해질 가능성이 높다. 폭설과 한파일수도 평년대비 최근 10년 감소하였고 일최저기온이 영하 $10^{\circ}C$ 이하인 날도 연간 발생일수가 감소하였다. 최근 10년간 우리나라 기후의 변화특성은 기온상승과 더불어 서리종료일이 앞당겨지고 열대야가 증가하고 폭설, 한파, 겨울철 일최저기온 영하 10도 이하인 날의 감소 등이 나타나고, 여름철 재해의 원인인 호우일수는 증가하는 추세이다.

  • PDF

Example of Legislation on the Space Relations of Every Countries in the World and Main Contents of the Space Exploration Promotion Act and Future Task in Korea (세계 각국의 우주관계 입법례와 우리나라 우주 개발진흥법의 주요내용 및 앞으로의 과제)

  • Kim, Doo-Hwan
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.20 no.1
    • /
    • pp.9-43
    • /
    • 2005
  • The Korean government established her first "National Space Program" in 1996, and revised it in 2000 and 2005. As embedded in the National Space Program, Korea aims to become one of the world's top countries in space technology by 2010. All of 13 satellites are planned to be put into orbit as schematized, which include 7 multi-purpose satellites, 4 science satellites and 2 geostationary orbit satellites. The Space Center in Korea is to be built at Woinara-Do, Bongrae-Myon, Koheung-Goon, Junlanam Province on the southern coast of the Korean peninsular. The first phase of the construction of the space center will be finished by 2007 for launch of KSLV-l. This will make Korea be the 13th advanced country in space development having a launching site in the world. The "Space Center" will serve as the infrastructure for the development of space technology and related technology, and plan to launch a low earth orbit satellite in 2007. A second science satellite made in Korea will be launched from the space center by 2007. From 2010, the center will be operated on a commercial basis operating launch facilities for low-to mid-altitude orbit satellites. Since the 'Aircraft Industry Promotion Act' was replaced by the 'Aerospace Industry Development Promotion Acf of 1987, this Act had been amended seven times from 1991 year to 2004. Most of developed countries has been enacted the space law including the public or private items such as an (1)DSA, (2)Russia, (3)the United Kingdom, (4)Germany, (5)France, (6)Canada, (7)Japan, (8)Sweden, (9)Australia, (10)Brazil, (11)Norway, (12)South Africa, (13)Argentina, (14)Chile, (15)Ukrainian etc. As the new Space Exploration Promotion Act was passed by the resolution of the Korean Congress on May 3, 2005, so the Korean government has made the public proclamation the abovementioned Act on May 31, this year. This Act takes effect on December 1, 2005 after elapsing six months from the date of promulgation. The main contents of Space Exploration Promotion Act of 2005 is as the following (1)establishing a basic plan for promoting space exploration, (2)establishment and function of national space committee, (3)procedure and management of domestic and international registration of space objects, (4)licensing of launch by space launch vehicles, (5)lability for damages caused by space accidents and liability insurance, (6) organizing and composition of the space accident investigation committee, (7)Support of non-governmental space exploration project, (8)Requesting Support and Cooperation of Space Exploration, (9)Rescue of Astronauts and Restitution of Space Objects, etc.. In oder to carry out successfully the medium and long basic plan for promoting space exploration and to develope space industry in Korea, I think that it is necessary for us to enlarge and to reorganize the function and manpower of the Space Technology Development Division of the Ministry of Science & Technology and the Korea Aerospace Research Institute. Korea has been carrying out its space program step by step according to the National Space Program. Korea also will continually strengthen the exchange and cooperation with all the countries in the world under the principle of equality, friendship relations and mutual benefits. Together with all other peoples around the globe, Korea will make due contribution towards the peaceful utilization of space resources and promotion of human progress and prosperity.

  • PDF

A study on measures for the mitigation of fire damage in Korea super high-rise building through the improvement of domestic·foreign standards (국·내외 기준개선을 통한 국내 초고층 건축물의 화재피해경감 대책에 관한 연구)

  • Ko, Jaesun
    • Journal of the Society of Disaster Information
    • /
    • v.13 no.2
    • /
    • pp.233-248
    • /
    • 2017
  • Uniform laws and regulations and reasonable design is necessary for the prevention of possible fire in super high-rise building. To this end, this study focused on super high-rise and massive building-related architectural review performance-based design (PBD) evaluation disaster impact assessment (DIA), and provided fire engineering measures for improving fire prevention on the basis of performance-based design by analyzing the buildings subject to these systems and problems in terms of contents. Above all, in the aspect of law and standard improvement, first, with regard to dual parts of two statutes though significant portion of them has the same contents in performance-based design (PBD) evaluation and disaster impact assessment (DIA), it is necessary to operate the systems after making them conform with each other and consolidating or abolishing them. Second, if it is impossible to consolidate or abolish performance-based design (PBD) evaluation and disaster impact assessment (DIA), the areas of contents of performance-based design (PBD) evaluation and disaster impact assessment (DIA) should be precisely classified and established. Next, engineering improvement measures against fire hazard in super high-rise building are as follows. First, it is necessary to revise the provisions of straight-run stairs in special escape stairs. And in case of installing a mechanical smoke exhaust system instead of smoke vent, sandwich pressurization used in the United Stated should be permitted. Second, with regard to smoke control system for special escape stairs, it was shown that there was necessity for revising the standards in order to enable air to be supplied according to section in case of fire, carrying out performance-based design, and the like from the early design stages to the completion stages. In the future, it is expected that an epoch-making contribution will be made to a decrease in casualties and property damage due to fire in case of super high-rise building where the results can be reflected after carrying out a study on maintenance and carrying out an additional study on other considerations of super high-rise building together with reflecting the improvement measures provided in the above-mentioned study.