• Title/Summary/Keyword: 진도관리 시스템

Search Result 64, Processing Time 0.026 seconds

Design and Implementation of Intelligent Integrated Information System for Research Ship (시험 연구선의 지능형 통합정보시스템 구축에 관한 연구)

  • Jang, Won-Tae;Kim, Ki-Bak
    • Journal of Advanced Navigation Technology
    • /
    • v.14 no.6
    • /
    • pp.990-995
    • /
    • 2010
  • We consider a problem of intelligent Integration Information system for research ship, and propose a design as one effective solution of the problem. The goals of the proposed design and system are as follows: management of engine, management of ship, researcher's work, education, training, manage schedule of the project, and thus to manage the whole life cycle of the research ship project. These goals are basically to facilitate and implement innovation- and enhancement-related activities which intelligent Integration Information system is fundamentally pursuing.

Introducing and Surveying 4D Models in AEC Industry (4D 공정관리시스템의 개발현황 조사연구)

  • Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.137-142
    • /
    • 2001
  • The traditional schedule management system provides project manager with analysis reports, such as progress control, earned value management and resource management, including schedule chart. However, the reports and functions in the traditional system are still limited in 2D concept. Recently, the scheduling method is using 4D concept that time of construction schedule is linked to space of drawings. This study presents the limitation of those systems and an improved method for developing 4D system through the comparative analysis of representative 4D systems that are developed up to date.

  • PDF

Fundamental Study of 4D CAD Application by Using Augmented Reality for Civil Engineering Project (증강현실(Augmented Reality)의 토목시설물 4D체계 활용을 위한 기초적 연구)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Kim, Hyun-Soo;Choi, Hyung-Lae;Kim, Chang-Hak
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.658-661
    • /
    • 2008
  • This study aims to suggest a methodology for developing the AR-4D CAD system which can improve construction progress control process by using augmented reality(AR) technology for civil engineering project. This study reviews practical application of AR process in 4D CAB system and suggests the detailed requirements, information flow system and integrated interface function for developing AR-4D CAD system. Through these methods, this research classifies main functions of AR-4D CAD system that can visualize construction progress control data, and suggests an operation scenarios of the system.

  • PDF

A General ion Method of Measurement Units for Performance Tracking (진도율 산정을 위한 측정 단위 도출 방안에 관한 연구)

  • Yoon Su-Won;Chin Sang-Yoon;Kim Yea-Sang;Jung Young-Soo;Park Sung-Soo;Park Soon-Chan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.521-524
    • /
    • 2003
  • Recently various construction management systems are applied for more efficient project management, and through them as-built construction information is collected. However, the accuracy of the collected information shows big differences among projects, since tile collection of tile as-built information is not based on objective manner or criteria and also each management personnel uses difference criteria on this based on individual experiences. This initiates the need for a development of methods and information frameworks for efficient collection and management of as-built information with assurance of data accuracy. Therefor the objective of this study is to suggest a method to determine the task performance measurement unit depending on the characteristics of work types. A prototype system was developed for generating task performance measurement units by utilizing MS ACCESS. The information framework and the system developed in this research is expected to help standardized performance measurements across projects by improving the objectivity and the accuracy of the collected information.

  • PDF

A case study and future directions of Radio Frequence Identification system in A/E/C industry (건설분야에서의 RFID 시스템 활용사례 및 발전방향)

  • Choi, Cheol-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.140-144
    • /
    • 2004
  • Barcode system has been used for many years in labors controlling & ready mixed concrete supplement in A/E/C industry However, it was not quite successful because ot its limitations in the field. The use of RFID system is getting important in the real world. RFID system substituted for barcode system in labor controling & ready mixed concrete supplement and it showed its potentialities in other major materials supply logistics and its possibilities In progress management of 4D system. This research shows RFID system's case study and its future directions in A/E/C industry.

  • PDF

기후요소를 활용한 철골공사기간 예측 시스템에 관한 연구 - 실시간 진도관리 시스템 적용을 중심으로 -

  • Park, Jung-Lo;Yoo, Seung Kyu;Kim, Kyung-Hwan;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.213-217
    • /
    • 2009
  • Weather factors affect cost increases and progress management under construction. Because progress schedule is delayed by weather factors, the construction costs are increased. It is an essential element to control the progress schedule applying weather factors to the progress management. This study applies monthly working-day percentages which is estimated by databases of past weather information to RTPM system. Through do progress management in construction projects exactly, will try to minimize risk of process control that do that is to weather factors. Also, will compare calamity in safety supervision side that do that is to weather factors beforehand. Based on the factors and the expected impact of factors together with the weather data during the last 50 years in Seoul region gathered from Korea. Through it, calculated number of month working day of RCA's structural steel work. Studied way that apply to RTPM system.

  • PDF

A Design of Intelligent Tutoring System for Piano Playing using MIDI Keyboard (미디키보드를 사용한 지능형 피아노 교습 시스템의 설계)

  • Kim, Hee-Sung;Choi, Chang-Min;Kim, Seong-Hoon
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2008.08a
    • /
    • pp.165-168
    • /
    • 2008
  • 이 논문에서는 멀티미디어 컴퓨터에 연결된 미디키보드를 사용하여 피아노 연주를 혼자서 배우고 연습할 수 있도록 하기 위한 지능형 교습 시스템을 개발하기 위하여, 시스템 구조 및 모듈별 기능과 기본적인 사용자 인터페이스를 설계하였다. 시스템의 구조는 미디 키보드의 실시간 연주 샘플링 모듈, 미디 데이타의 시퀀싱 모듈, 사운드 합성 모듈과 연결된 지능형 교습 시스템이 된다. 세분화된 모듈별 기능에서는 학습 콘텐츠, 학습자 모델, 진단 평가 모듈, 진도 관리 모듈, 등의 세부적인 기능 설계가 필요하다. 학습자 모델을 기반으로 진단 편가 및 진도 관리를 지능적으로 처리하기 위해서 CLIPS를 사용한 전문가시스템 접근을 사용한다. 컴퓨터 화면상의 악보 디스플레이, 실시간 연주 화면, 진단 평가 디스플레이를 위한 GUI 설계가 필요하다. 그리고, 향후 콘텐츠 구축 및 시스템 구현 시에 예상되는 문제점과 해결 방안을 논의한다.

  • PDF

A Design and Implementation of Bidding and Scheduling System for Ship Repair (선박수리를 위한 입찰 및 일정관리 시스템의 설계 및 구현)

  • Kang, Hyo-woon;Kim, Jindeog
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.19 no.7
    • /
    • pp.1585-1592
    • /
    • 2015
  • Currently, the existing schedule management of ship repair has depended on hand-written notes of engineering manager in the repair ship yard. Simple management based on the hand-written notes is inefficient because current states of equipments and staff are not graspable in real-time. To solve this problem, the ICT based scheduling method is required in ship repair industry. In this paper, we propose a system based on ICT which manages schedules for repairing ships. The proposed system solves the problem occurred by the management to use the hand-written notes. Because the system has a function to report the current state of ship repair, it is able to cope with various problems, such as delay, wrong repair and so on. Moreover, the system is able to maximize the efficiency of ship repair process due to efficient management to staff and equipment.

A real-time construction management of a tunnel using position tracking sensor (위치추적 센서를 이용한 터널의 실시간 시공관리)

  • Lee, Kang-Hyun;Kim, Dae-Won;Mun, Sung-Mo;Cho, Hun-Hee;Kang, Kyung-In;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.2
    • /
    • pp.133-148
    • /
    • 2011
  • Construction sites are becoming larger and complex with the growth of national economy. Accordingly, it is important to identify real-time information about materials, equipments, and manpower during construction at sites. Even though research utilizing position tracking sensors has been conducted in architectural engineering fields, this area of research is almost nil in civil engineering fields. Therefore, a feasibility study to find a way to apply position tracking sensors to an in-situ tunnel construction site adopting conventional tunnelling method is performed in this study. A methodology is proposed that the progress management of the tunnelling work can be monitored by checking construction materials needed at job site and the safety management system can be assessed by checking distance between in-situ workers and construction equipments. The most representative materials were identified so that IT technology can be applied by attaching and monitoring sensors to the selected materials. Also, time of arrival (TOA) for a position determination technology along with a wireless network technology was chosen and build wireless network system. The adopted methodology was applied to an in-situ tunnelling site, and verified the usefulness of the proposed system.