This study was objected to show the complexity of groundwater flow system in a site-scale area as a design parameter of the groundwater monitoring network for early detection of pollutant leakage from a potential source of groundwater contamination (e.g., storage tank). Around the tanks, three monitoring wells were installed at about 22~25 m deep and groundwater level and temperature had been monitored for 22 months by 2-minute interval, and then compared with precipitation and temperature data from nearby weather station. Annual variation of groundwater level and its response to precipitation event, variation of groundwater temperature and delayed response to that of atmospheric temperature indicate the complexity of groundwater flow and flow paths even in the relatively small area. Thus, groundwater monitoring network for early detection of contaminant leakage should be designed with full consideration of the complexity of groundwater flow system, identified from the detailed hydrogeological investigation of the site.
Journal of Korean Society of Disaster and Security
/
v.11
no.2
/
pp.17-28
/
2018
The purpose of this study is to investigate the effect of underground facilities around excavation zone on groundwater flow characteristics during excavation. The scenarios were constructed considering the size of the underground facility, the separation distance, and the hydraulic gradient. As a result, as the size of the underground facility increases, the difference of head and the hydraulic gradient become large. The shorter the separation distance of underground facility is, the more the difference of head and the hydraulic gradient occur. The effect of hydraulic gradient on model area was relatively small. As a result of analysis of groundwater flow rate for the scenario, groundwater flow rate tends to decrease as the size of underground facility increases or groundwater flow rate tends to decrease as the separation distance decreases. It is necessary to examine the effect of underground facilities on the groundwater flow analysis in the ground excavation.
The study area is located in Hyeonseo-myeon and Andeok-myeon of Cheongsong-gun, Korea around the Yeongcheon dam waterway tunnel, and in this paper, it is analyzed whether the groundwater level is recovered or not compared to groundwater level before waterway tunnel construction by measuring the groundwater level of 156 wells which were installed in areas near and away from the waterway tunnel. From September 2017 to August 2018, the groundwater level of the well was measured at least once a month, and as a result of groundwater level observation survey, the groundwater level of wells distributed in the directly affected zone by the waterway tunnel is relatively lower than that of the indirectly affected zone apart from the waterway tunnel. These results are estimated to be predominantly affected by the effect of waterway tunnel acting on geologic discontinuities rather than by terrain conditions, i.e. groundwater flows being leaked to the waterway tunnel through direct or indirect channels. Continuous monitoring and further investigation will be required to maintain groundwater facilities and preserve groundwater environments in the future.
Journal of Korean Tunnelling and Underground Space Association
/
v.17
no.4
/
pp.487-497
/
2015
Using existing tunnel for section enlargement and remodeling is being considered as an optimal alternative in order to solve traffic jam in tunnel. The existing method has been performed while blocking the traffic flow. Recently, New enlargement method was developed which can maintain traffic flow during the construction by using protector. It can minimize social loss due to keeping traffic flow. On the other hand, installing and operating protector can cause economic disadvantages. So, social cost estimation considering traffic flow should be considered for relevant economic evaluation of tunnel section enlargement methods. This paper presents the social cost estimation method of tunnel section enlargement methods considering traffic flow. In addition, to compare economic efficiency existing method with new method, suggested method was applied to Maebong Tunnel.
Nam, Gui Sook;Pae, Yo Sop;Kim, Hyung Joong;Lee, Sang Joon;Lee, Gwang Sik
Journal of Wetlands Research
/
v.6
no.4
/
pp.59-69
/
2004
Constructed wetlands are regarded as an important water treatment system for agricultural water quality improvement and management. The purpose of this study is to evaluate the application of subsurface flow wetland(SFW), using the Pharagmites australis as macrophytes, and to clarify the basic and essential factors to be considered in the construction and management of constructed wetlands. This study was carried out relatively short hydraulic residence time(HRT), 6hr ~ 72hr (3days), using eutrophic reservoir water with relatively low concentrations of influent and large quantity to be treated. The effluent satisfied the criteria of agricultural water quality. Removal efficiencies of Biochemical oxygen demand(BOD), Chemical oxygen demand(COD), Suspended solids(SS) and Chlorophyll a(Chl-a) were high in HRT 24hr, not any more significant increasement of removal efficiencies in HRT 48hr and 72hr. However, removal efficiencies of nitrogen and phosphorus increased as HRT increased, showing the highest efficiency at the 72hr of HRT in nitrogen, and 48hr in phosphorous. The SFW was very effective system for reservoir water quality improvement, and had the advantages of the reduction of purchasing cost to land required, lack of odors, and harmful insects, especially mosquito, the improvement of the scenic beauty and minimal risk of public exposure. Therefore, it was evaluated that the SFW was very available water treatment system for the water quality improvement of agricultural reservoir. However, it was need to consider with application of the SFW in high cost of construction and troublesome of management.
Proceedings of the Korea Water Resources Association Conference
/
2009.05a
/
pp.1903-1907
/
2009
최근 도입 필요성이 계속하여 높아지고 있는 지하방수로 유입구로는 유입구 효율과 성능으로 인하여 와류식 유입구가 많이 적용되고 있다. 그 중 나선식 유입구(spiral intake)는 가장 일반적으로 사용되는 형식으로 초기에 활용되었던 원형 유입구(circular intake)를 대신하여 사용되는 형식이다. 형태적인 복잡성에 도 불구하고 형식상의 특성으로 인하여 와류(vortex)를 안정적으로 형성시키기 때문에 많이 사용되고 있다. 나선식 지하방수로 유입구가 사용되는 가장 큰 이유는 유입구 내부에서도 수위가 안정적으로 유지되며, 유입 유량에 따른 수위의 변화가 다른 유입구 형식에 비하여 비교적 안정적으로 예측 가능하기 때문이며, 만약 지하방수로 유입구 내부에서 수위가 안정적으로 유지되지 못하고 도수 현상 등에 의한 수위 상승 현상 등이 발생하는 경우 지하방수로 내부로 안정적으로 유량을 배제하는 것이 어려워지고, 또한 도수 현상이 발생하는 동안 과도한 유량이 유입될 경우 다시 본류로 흐름이 역류할 가능성도 생각할 수 있다. 따라서 유입구 형상에 따른 수위의 변화를 정확히 예측하는 것이 매우 중요해 진다. 본 연구에서 검토될 나선식 종경사형 유입구(inclined spiral intake)는 일정한 바닥 경사를 도입하여 사류 흐름을 보다 안정적으로 가속시켜 유입구 내부에서의 도수 현상을 방지하는 형식으로 유입구 바닥의 외측 또는 중앙선을 따라서 일정한 경사를 주어 사류 유입 흐름을 안정적으로 유도함으로서 유량 배제 효율을 높인 형태라 할 수 있다. 본 연구에서는 유입구 외측을 기준으로 일정한 경사(5.0 %, 7.5 %, 10.0%, 12.5%)를 가진 나선식 종경사형 유입구 모형을 제작하여 유입 유량 변화에 따른 유입구 내부에서 수위-유량관계를 확인하였다
For the proper design and management of underground storage cavern, groundwater flow around cavern should be analyzed. Since this flow is influenced by spatial nonuniformity of hudraulic conductivity, the two-dimensional finite element flow model incorporating stochastic concepts was developed to analyze influences due to this nonuniformity. Monte Carlo technique was applied to obtain an approximate solution for two-dimensional, steady flow in a stochastically defined nonuniform medisu. For this purpose, the values of hydraulic conductivity were generated for each element with known mean and standard deviations. The uncertainty in model prediction depends on both the nonuniformity in hydraulic conductivity and the natures of the flow system such as water curtain and boundary condition. Therefore the uncertainties in predicted hydraulic head and gradient are the greatest where the mean hydraulic gradients are relatively large and far from the boundaries. Especially, we relate these uncertainties with well known gas tightness condition.
Kim, Jung-Soo;Kim, So-Young;Choi, Tea-Soon;Yoon, Sei-Eui
Proceedings of the Korea Water Resources Association Conference
/
2012.05a
/
pp.604-604
/
2012
국지성 집중호우에 따른 도심지 내수 침수 피해의 주원인으로 하수관거의 설계기준을 초과하는 강우가 침수피해의 주요 원인이며, 도심화로 인해 불투수 면적이 증가함에 따라 유출되는 시간이 짧아 저지대의 피해는 불가피하다. 2010년과 2011년에 100년 이상의 강우사상이 서울시에 연이어 나타나면서 집중호우로 인한 피해지역이 유사하게 나타났으며, 광화문 거리의 연이은 침수는 현재 서울시의 하수관거의 용량과 빗물펌프장 및 저류조 시설로 구성된 기존 수방대책의 한계점을 보이고 있다. 이에 서울시는 광화문 일대의 배수능력을 향상시키기 위하여 효자배수분구 빗물배수터널을 계획하고 있다. 일본, 미국 및 유럽 등지에서는 대심도 지하수로 시설에 대한 수리실험 및 수치 연구를 바탕으로 다양한 지하방수로가 건설되어 국지성 집중 강우에 대해 적절히 대응하고 있으나, 국내의 경우에는 대심도 지하방수로 시설에 대한 연구가 미비하여 지하방수로 설계 지침 및 기술적 자료가 부족한 실정이다. 그러므로 대심도 빗물배수터널 시설에서의 흐름특성 분석에 관한 수리실험 및 수치해석 등의 구체적인 연구가 필요하다고 판단된다. 본 연구에서는 수리모형 실험의 물질적 및 시간적 한계를 극복하기 위하여 일반적으로 3차원 유체거동의 특성분석에 많이 사용되는 Fluent 6.3 모형을 이용하여 대심도 빗물배수터널 시설의 접선식 유입구에 대한 흐름특성을 수치모의 하였다. 접선식 유입구 및 수직갱(drop shaft)에 대한 기하 모형의 격자망은 수치해석의 안정성 확보를 위하여 그림 1과 같이 6면체 격자로 구성하였다. 맨홀 내의 다상유동을 고려하기 위하여 VOF(Volume of Fluid) Scheme을 적용하였으며, 수치해석 방법으로는 비정상류, 1st order implicit method를 사용하였다. Fluent에서의 난류 흐름을 계산하는 방법에는 난류 운동에너지와 난류 에너지 소산율 $\epsilon$의 전달 방정식을 도입한 k-$\epsilon$ 난류 모형을 채택하였다.
Journal of Korean Tunnelling and Underground Space Association
/
v.10
no.1
/
pp.37-47
/
2008
Design and construction of tunnels require understanding the influence of groundwater. Particularly, it is essential to know how the drainage conditions at the tunnel boundary affect flow behavior of ground adjacent to the tunnels. In this study flow behavior of a leaking tunnel was investigated using physical model tests for tunnel depths and various hydraulic boundary conditions. Particular concerns were given to flow lines toward tunnels. Test results showed that the boundary conditions hardly influence on flow patterns and time required to reach steady state conditions. It is revealed that with an increase in water depth, flow lines concentrated to the drain holes. The physical tests were numerically simulated. Numerical results showed that the flow behavior was represented appropriately by considering filter-drain hole drainage rather than boundary drainage all over the lining.
Journal of Korean Tunnelling and Underground Space Association
/
v.6
no.4
/
pp.345-356
/
2004
Open-cut method has been widely used to construct underground structures, but it causes several problems such as traffic congestion and public resentment resulting from severe construction noise and ground settlement. In many cases, it is very difficult to build underground structures safely due to the unknown locations of buried facilities such as water pipes, drainage pipes, gas pipes and high-pressure cable conduits etc. Also in open-cut method, moving buried facilities causes additional cost and extension of construction period. Therefore, this paper is to present a case study in which Tubular Roof construction Method (T.R.c.M.), a newly developed construction method for underground structures using slab steel pipes and PC wall trench, is applied for the construction of a subway tunnel in Seoul. As a result, it is found that T.R.c.M. is a construction method by which tunnels can be constructed safely without any effect on the surrounding environment and traffic flow due to the minimized construction vibration and noise.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.