• Title/Summary/Keyword: 지하물리탐사

Search Result 378, Processing Time 0.019 seconds

Survey and Numerical Analysis Cases of Ground Subsidence by Mine Goaf (광산 채굴적으로 인한 지반침하 조사 및 해석 사례)

  • Hyun-Bae Park;Seong-Woo Moon;Sejeong Ju;Jeungeum Lee;Yong-Seok Seo
    • The Journal of Engineering Geology
    • /
    • v.34 no.1
    • /
    • pp.1-12
    • /
    • 2024
  • South Korea's mining industry was actively developed until 1980, but subsequent declining profitability forced many mines to close. Most of the abandoned mines are susceptible to persistent subsidence because of the length of time since mining ceased. Accurate prediction of the locations and times of subsidence is difficult; therefore, this study aims to apply continuum analysis to past cases of subsidence to establish a method of predicting the location and magnitude of future subsidence. The study area is an area of ○○ mining located between the Yangsan fault zone and the Moryang fault zone, in which three subsidence events occurred between 2005 and 2009. Drilling surveys and electrical resistivity surveys were performed at subsidence sites determined the distribution of strata, and through laboratory tests obtained the physico-mechanical properties of the rock. Numerical analysis of the results found that the plastic status area includes the areas of actual subsidence and that continuum analysis can also be used to predict the location and magnitude of subsidence caused by mine goaf.

Study on the Seismic Random Noise Attenuation for the Seismic Attribute Analysis (탄성파 속성 분석을 위한 탄성파 자료 무작위 잡음 제거 연구)

  • Jongpil Won;Jungkyun Shin;Jiho Ha;Hyunggu Jun
    • Economic and Environmental Geology
    • /
    • v.57 no.1
    • /
    • pp.51-71
    • /
    • 2024
  • Seismic exploration is one of the widely used geophysical exploration methods with various applications such as resource development, geotechnical investigation, and subsurface monitoring. It is essential for interpreting the geological characteristics of subsurface by providing accurate images of stratum structures. Typically, geological features are interpreted by visually analyzing seismic sections. However, recently, quantitative analysis of seismic data has been extensively researched to accurately extract and interpret target geological features. Seismic attribute analysis can provide quantitative information for geological interpretation based on seismic data. Therefore, it is widely used in various fields, including the analysis of oil and gas reservoirs, investigation of fault and fracture, and assessment of shallow gas distributions. However, seismic attribute analysis is sensitive to noise within the seismic data, thus additional noise attenuation is required to enhance the accuracy of the seismic attribute analysis. In this study, four kinds of seismic noise attenuation methods are applied and compared to mitigate random noise of poststack seismic data and enhance the attribute analysis results. FX deconvolution, DSMF, Noise2Noise, and DnCNN are applied to the Youngil Bay high-resolution seismic data to remove seismic random noise. Energy, sweetness, and similarity attributes are calculated from noise-removed seismic data. Subsequently, the characteristics of each noise attenuation method, noise removal results, and seismic attribute analysis results are qualitatively and quantitatively analyzed. Based on the advantages and disadvantages of each noise attenuation method and the characteristics of each seismic attribute analysis, we propose a suitable noise attenuation method to improve the result of seismic attribute analysis.

Numerical Simulation of Normal Logging Measurements in the Proximity of Earth Surface (지표 부근에서의 노멀전기검층 수치 모델링)

  • Nam, Myung-Jin;Hwang, Se-Ho
    • Economic and Environmental Geology
    • /
    • v.43 no.3
    • /
    • pp.259-267
    • /
    • 2010
  • Resistivity logging instruments were designed to measure electrical resistivity of formation, which can be directly interpreted to provide water-saturation profile. Short and long normal logging measurements are made under groundwater level. In some investigation sites, groundwater level reaches to a depth of a few meters. It has come to attention that the proximity of groundwater level might distort short and long normal logging readings, when the measurements are made near groundwater level, owing to the proximity of an insulating air. This study investigates the effects of the proximity of groundwater level (and also the proximity of earth surface) on the normal by simulating normal logging measurements near groundwater level. In the simulation, we consider all the details of real logging situation, i.e., the presence of wellbore, the tool mandrel with current and potential electrodes, and currentreturn and reference-potential electrodes. We also model the air to include the earth’'s surface in the simulation rather than the customary choice of imposing a boundary condition. To obtain apparent resistivity, we compute the voltage, i.e., potential difference between monitoring and reference electrodes. For the simulation, we use a twodimensional, goal-oriented and high-order self-adaptive hp finite element refinement strategy (h denotes the element size and p the polynomial order of approximation within each element) to obtain accurate simulation results. Numerical results indicate that distortion on the normal logging is greater when the reference potential electrode is closer to the borehole and distortions on long normal logging are larger than those on short normal logging.

Stochastic numerical study on the propagation characteristics of P-Wave in heterogeneous ground (지반의 비균질성이 탄성파 전파 특성에 미치는 영향에 대한 추계론적 수치해석 연구)

  • Song, Ki-Il
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.1
    • /
    • pp.13-24
    • /
    • 2013
  • Various elastic wave-based site investigation methods have been used to characterize subsurface ground because the dynamic properties can be correlated with various geotechnical parameters. Although the inherent spatial variability of the geotechnical parameters affects the P-wave propagation characteristics, ground heterogeneity has not been considered as an influential factor. Thus, the effect of heterogeneous ground on the travel-time shift and wavefront characteristics of elastic waves through stochastic numerical analyses is investigated in this study. The effects of the relative correlation lengths and relative propagation distances on the travel-time shift of P-waves considering various intensities of ground heterogeneity were investigated. Heterogeneous ground fields of stiffness (e.g., the coefficient of variation = 10 ~ 40%) were repeatedly realized in numerical finite difference grids using the turning band method. Monte Carlo simulations were undertaken to simulate P-wave propagation in heterogeneous ground using a finite difference method-based numerical approach. The results show that the disturbance of the wavefront becomes more significant with stronger heterogeneity and induces travel-time delays. The relative correlation lengths and propagation distances are systematically related to the travel-time shift.

Predicting ground condition ahead of tunnel face utilizing electrical resistivity applicable to shield TBM (Shield TBM에 적용 가능한 전기비저항 기반 터널 굴착면 전방 예측기술)

  • Park, Jin-Ho;Lee, Kang-Hyun;Shin, Young-Jin;Kim, Jae-Young;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.6
    • /
    • pp.599-614
    • /
    • 2014
  • When tunnelling with TBM (Tunnel Boring Machine), accessibility to tunnel face is very limited because tunnel face is mostly occupied by a bunch of machines. Existing techniques that can predict ground condition ahead of TBM tunnel are extremely limited. In this study, the TBM Resistivity Prediction (TRP) system has been developed for predicting anomalous zone ahead of tunnel face utilizing electrical resistivity. The applicability and prediction accuracy of the developed system has been verified by performing field tests at subway tunnel construction site in which an EPB (Earth Pressure Balanced) shield TBM was used for tunnelling work. The TRP system is able to predicts the location, thickness and electrical properties of anomalous zone by performing inverse analysis using measured resistivity of the ground. To make field tests possible, an apparatus was devised to attach electrode to tunnel face through the chamber. The electrode can be advanced from the chamber to the tunnel face to fully touch the ground in front of the tunnel face. In the 1st field test, none of the anomalous zone was predicted, because the rock around the tunnel face has the same resistivity and permittivity with the rock ahead of tunnel face. In the 2nd field test, 5 m thick anomalous zone was predicted with lower permittivity than that of the rock around the tunnel face. The test results match well with the ground condition predicted, respectively, from geophysical exploration, or directly obtained either from drilling boreholes or from daily observed muck condition.

Identification of Subsurface Discontinuities via Analyses of Borehole Synthetic Seismograms (시추공 합성탄성파 기록을 통한 지하 불연속 경계면의 파악)

  • Kim, Ji-Soo;Lee, Jae-Young;Seo, Yong-Seok;Ju, Hyeon-Tae
    • The Journal of Engineering Geology
    • /
    • v.23 no.4
    • /
    • pp.457-465
    • /
    • 2013
  • We integrated and correlated datasets from surface and subsurface geophysics, drilling cores, and engineering geology to identify geological interfaces and characterize the joints and fracture zones within the rock mass. The regional geometry of a geologically weak zone was investigated via a fence projection of electrical resistivity data and a borehole image-processing system. Subsurface discontinuities and intensive fracture zones within the rock mass are delineated by cross-hole seismic tomography and analyses of dip directions in rose diagrams. The dynamic elastic modulus is studied in terms of the P-wave velocity and Poisson's ratio. Subsurface discontinuities, which are conventionally identified using the N value and from core samples, can now be identified from anomalous reflection coefficients (i.e., acoustic impedance contrast) calculated using a pair of well logs, comprising seismic velocity from suspension-PS logging and density from logging. Intensive fracture zones identified in the synthetic seismogram are matched to core loss zones in the drilling core data and to a high concentration of joints in the borehole imaging system. The upper boundaries of fracture zones are correlated to strongly negative amplitude in the synthetic trace, which is constructed by convolution of the optimal Ricker wavelet with a reflection coefficient. The standard deviations of dynamic elastic moduli are higher for fracture zones than for acompact rock mass, due to the wide range of velocities resulting from the large numbers of joints and fractures within the zone.

A Study on the Construction Method of the Songsanri Tombs Using Geophysical Exploration Method (송산리 고분군의 지구물리학적 조사를 통한 고분축조방법 고찰)

  • Suh, Mancheol;Lee, Changwhan;Jeong, Gyeok;Kim, Donghyun
    • Journal of Conservation Science
    • /
    • v.6 no.1 s.7
    • /
    • pp.61-70
    • /
    • 1997
  • An integrated geophysical survey was conducted to study a construction method of the Sonsanri tombs including the Muryong royal tomb. With the distribution of soil resistivity and self potential values, the boundary between original ground and the construction site was delineated clearly. The original ground has relatively high resistivity of $1,000\~1,500$ ohm-m and low self-potential values of $0{\pm}3mV/m$, while the construction site has low resistivity less than 200 ohm-m and quite high self-potential values of $-20\~30mV/m$. It is interpreted that the open site for construction of subsurface tomb has the size of about 35 m in the north-south direction. Big difference in characteristics of ground between the tomb site and the original site gives a clue for the construction method of tombs in Baekje dynasty. The site was opened about 35 meters in the north-south direction and then a mold structure was constructed with a brick frame outside. The brick frame consists of bricks cemented each other and structually combined. The mold structure was removed from inside after refill of the opened construction site with some cemented rock debris and soil.

  • PDF

A Toolbox Approach for the Environmental Site Assessment of a Chemical Plant in a Coastal Area (연안지역 화학공장부지의 부지환경평가를 위한 복합조사기법의 적응)

  • Choi, Seung-Jin;Woo, Nam-Chil
    • Economic and Environmental Geology
    • /
    • v.40 no.4
    • /
    • pp.419-443
    • /
    • 2007
  • Recently, the branch-out of foreign companies into domestic markets through M&A and the opened followed by the Free Trade Agreement(FTA) with America have made the environmental site assessments of specific site more necessary. In this study, through case study of conducting actual environmental site assessment by use of a toolbox approach at a large scale of chemical plant with various contaminants located in a coastal area, the problems of guideline of domestic environmental assessment of soil were complemented. And an efficient and economical assessment was achieved. All six steps such as basic investigation, environmental site history survey, sampling and analysis, installation of monitoring wells and hydrogeological survey, and data interpretation were conducted in this study. All results of document survey, geological lineament analysis, field geology survey of surrounding area, geophysical prospecting of the site, hydraulic conductivity, measurement of groundwater flow rate and direction, sampling and analysis at each step were associated and estimated as an integrated tool box approach. As a consequence of this study, toolbox approaches were very useful techniques for contamination level and site characterization of subsurface media. The given conditions to conduct a basic survey for domestic soil environment assessment of site by use of existing documents, as well as interviews with the owner/manager/user of all adjacent properties and thorough review of all practically reviewable records pertaining to the property and surrounding properties within "Guideline for Soil Environment Assessment" radii are very poor. As a result, the application of toolbox approach in the environment site assessment of site is not only more efficient and economical, but also could be very useful assessment to integrate the soil and groundwater contamination.

Geotechnical Consideration on the Conservation of the Muryong Royal Tomb (무령왕릉의 보존을 위한 지반공학적 고찰)

  • Suh, Mancheol
    • Journal of Conservation Science
    • /
    • v.8 no.1 s.11
    • /
    • pp.40-50
    • /
    • 1999
  • A geotechnical research including observation of the movement of wall-structure, monitoring of groundwater, non-destructive geophysical investigation was conducted to workout a countermeasure to conserve the Muryong Royal Tomb which is the most extinguishable cultural property of the Baekje dynasty. Movement of the structure of Muryong Royal Tomb generally arises to the front chamber and its amplitude in a rainy season is twice of that in the dry season. It represents serious problem concerned about structural safety of the royal tomb in the rainy season. Movement of wall-structure is caused due to the rain infiltration through cracks in the quicklime layer within the soil mound on the top of the royal tomb and the change of the temperature inside of the tomb. Cracks found around the Muryong Royal Tomb are mostly spread in NW and SE of the tomb structure and it harmonizes with the direction of movement of wall-structure of the Muryong Royal Tomb. Counter-plans for safety and prevention of water-leakage that obstruct the movement of wall structures towards the direction of south are very important for the conservation of Muryong Royal Tomb. After getting rid of the cause of structural change by the restoration of the front chamber of the Muryong Royal Tomb, it needs to reinforce the quicklime layer for prevention of waterleak.

  • PDF

A Study on the Failure Cause of Large Scale Rock Slope in Limestone Quarries (석회석 광산에서 발생한 대규모 암반사면의 붕괴원인 분석에 관한 연구)

  • Lee, Sang-Eun;Kim, Hak-Sung;Jang, Yoon-Ho
    • Tunnel and Underground Space
    • /
    • v.24 no.4
    • /
    • pp.255-274
    • /
    • 2014
  • The target of this study is large scale rock slope collapsed by around 7 pm on August, 2012, which is located at ${\bigcirc}{\bigcirc}$ limestone quarries of Gangneung city, Gangwondo. The slope prior to the collapse is formed as the height of about 200 m and the average inclination of $45^{\circ}$. The estimated amount of the collapse is about $1,500,000m^3$ with respect to the slope after the collapse. Geotechnical and field investigations such as boring, geophysical prospecting, surface geological survey, geological lineaments, borehole imaging, metric 3D imaging, experimental and field test, mining work by year, and daily rainfall were performed to find the cause of rock slope failure. Various analyzes using slope mass rating, stereonet projection, limit equilibrium method, continuum and non-continuum model were conducted to check of the stability of the slope. It is expected that the cause of slope failure from the results of various analysis and survey is due to the combined factors such as topography, rainfall, rock type and quality, discontinuities, geo-structural characteristics as the limestone cavity and fault zones, but the failure of slope in case of the analysis without the limestone cavity is not occurred. Safe factor of 0.66 was obtained from continuum analysis of the slope considering the limestone cavity, so the ultimate causes of slope failure is considered to be due to the influence of limestone cavity developed along fault zone.