A Study on Recoverability of Opportunity Profits Loss upon Time-Delay in Construction Contract (건설공사의 공기지연과 기회이익의 손실보전에 관한 연구)

  • Chun Jae-Youl;Lee Kyung-Kook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.359-364
    • /
    • 2003
  • The loss of potential opportunity profit which is consisting in the partial markups of the corporation would taking placed in related with the time-delay deeply, has customarily disregarded in contract adjustment under the principles of denial of cost accounting method, declined conjecture in the point of benefits and protection of the law in scope of compensation and the restricted conditions of constant contract. It is being resulted from that the policies of the general principles of accounting standards which is subjected to ask an objective data and evidence, and the denial system as a debt derived from imperfect legal theory applied by current law. Therefore, it is necessitated to find if any irrationality in the positive system is and further to draw an improved reasonable measures to adopt by review of constant system preparing tile reasonableness with the method of suitable quantification devices provided that any time-delay is induced by the party.

  • PDF

A Basic Study on the Improvement for Liquidated Damages at Construction Delay (지체상금 개선방안에 관한 기초연구)

  • Kook, Dong-Hoon;Son, Ki-Young;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.458-461
    • /
    • 2006
  • With the opening in construction market, more diversified and internationalized construction culture is imported, but the level of our construction culture and policy is still not met the international standards. For example, there is a difference in the liquidated damages at delay due to the reason of builder imputation during the public construction project comparing the international standards like damages. It may lead to the potential claim. In this study, via comparing and analysis on the relevant international standards and extension expense for terms of work, actual compensation is selected, and improvement of liquidated damages like damages is presented.

  • PDF

A Liquidated Damages Calculation Method Based on Owner's Substantial Loss (발주자 손실기반 지체상금 산정 개선방안)

  • Jang, Bong-Jo;Shim, Jae-Young;Koo, Jeong-San;Jung, Dae-Won;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.150-158
    • /
    • 2007
  • The delay of construction is one of the most frequent and complicated elements of the claim. And the liquidated damages cause many disputes during the judgement. The liquidated damages should be a compensation for owner's substantial loss, but actually be applied as a damage for breach of contract. These damages are different from owner's loss and give constructors a excessive burden. So we need a more reasonable system than a lump application system. In this study, we make a Improvement System, that based on owner's substantial loss, and suggest the new liquidated damages calculation method.

The Process of Identifying the Responsibility Party of Caused Delay Claim by Ambiguity of the Conditions of the Contract (계약 조항의 애매모호성에 의해서 발생되는 공기지연 클레임의 책임 당사자 확인 프로세스)

  • Lee, Chijoo;Kwan, Taewook;Koh, Hoonsuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.6
    • /
    • pp.527-535
    • /
    • 2020
  • This study analyzed main causes of claims in EPC/Turnkey projects. For this purpose, this study referred to the FIDIC silver book, which lists the international standard contract conditions for EPC/Turnkey projects. The most frequent cause of claim was delay. A process was then proposed to determine whether the owner or contractor was the responsible party when the delay claim occurred. The proposed process was for damages for delay which is the conditions of contract for indemnities against delay claim. The process was based on conditions of the contract of two previous EPC/Turnkey projects that were constructed in 2010, the FIDIC silver book, as well as the obligations of owner and contactors. The proposed process is applicable depending on the conditions of the contract and the owner's meaning. Furthermore, by identifying the responsible party, this study will contribute in identifying the possible claim types before concluding a contract and writing the specific contract.

A Convergence Study on the Differences in Medical Practices and Medical cost according to Auto Insurance Companies (자동차보험사별 진료특성과 진료비 차이에 관한 융합 연구)

  • Lee, Soo-ja;Lee, Chong Hyung;Park, Arma;Kim, Kwang-Hwan
    • Journal of the Korea Convergence Society
    • /
    • v.8 no.5
    • /
    • pp.61-68
    • /
    • 2017
  • This study investigates the differences in medical practices and medical cost according to auto insurance companies based on 8,589,602 cases that were treated by auto insurance corporation for the year of 2015, from the beginning of January to the end of December. The results of this study can be summarized following. First, in terms of the general characteristic in medical treatment, especially the age, the highest figure in both non-life insurance and mutual aid cooperative was shown in the age of 50 to 59 at 22.8 per cent(p<0.001). Second, in terms of a medical cost per a hospital care, classified by clinic, the costs in the department of internal medicine were much higher than those in the surgical department, and the thoracic surgery among parts of the surgical department showed the highest figures in both non-life insurance and mutual aid cooperative. According to the above summarized results of this study, it can be concluded that Health Insurance Review and Assessment Service has to address the problem on the increase of unnecessary costs and the occurrence of social expenses caused by the delay of patients' rehabilitation and return to their daily lives, by carrying out the evaluation for the appropriateness to organizations that ask for payments of auto insurance.

A Cost-Benefit Analysis of Neonatal Screening Tests for Maple Syrup Urine Disease, Homocystinuria, Galactosemia, and Congenital Adrenal Hyperplasia (한국에서의 단풍당뇨증, 호모시스틴뇨증, 갈락토스혈증, 선천성 부신과형성증에 대한 신생아 선별검사의 경제성 분석)

  • Park, Shin-Young;Kim, Dong-Il;Lee, Dong-Hwan
    • Journal of Genetic Medicine
    • /
    • v.5 no.2
    • /
    • pp.111-118
    • /
    • 2008
  • Purpose: Neonatal screening tests are increasingly being used forearly diagnosis of inborn errors of metabolism (IEM) in the hope of avoiding the severe developmental delay, acute illness, and death that may result from these diseases. In this study, a cost-benefit analysis was performed on the neonatal screening of maple syrup urine disease, homocystinuria, galactosemia, and congenital adrenal hyperplasia in Korea. Materials and Methods: This study included 1,259,220 Korean newborns born between January 2005 to December 2007, who were screened for maple syrup urine disease, homocystinuria, galactosemia, and congenital adrenal hyperplasia. We calculated and compared the total costs in cases where these four screening tests were implemented, and those where they were not. Results: There were no benefits to screening for maple syrup urine disease or homocystinuria due to their low prevalence for these two tests, the costs exceeded the benefits at benefit:cost ratios of 0.5:1 and 0.6:1, respectively. In contrast, benefits far exceed costs at a ratio of 4.1:1 for galactosemia and 2.9:1 for congenital adrenal hyperplasia. The average benefit:cost ratio for all four tests was 2.0:1. Conclusion: Neonatal screening tests for maple syrup urine disease, homocystinuria, galactosemia, and congenital adrenal hyperplasia are financially viable.

  • PDF

The Scope and the Meaning of 'Time of Arrival' in Carriage of Passengers by Air : Focused on the Germanwings GmbH v. Ronny Henning, Case C-452/13 (2014). (항공여객운송에서의 지연보상과 도착시각의 의미 - EU 사법재판소 2014. 9. 14. 판결(ECLI:EU:C:2014:2141)을 중심으로 -)

  • Sur, Ji-Min
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.33 no.2
    • /
    • pp.267-290
    • /
    • 2018
  • This paper reviews and criticizes the EU Case of C-452/13, Germanwings GmbH v. Ronny Henning. Under this case, Ronny Henning later sued Lufthansa's budget carrier Germanwings after it refused to pay him 250 euros compensation for a delay he said totalled more than three hours. Germanwings, however, maintained his flight had arrived only two hours and 58 minutes behind schedule. In those circumstances, the following question to the European Court of Justice (ECJ) for a preliminary ruling: What time is relevant for the term time of arrival used in Articles 2, 5 and 7 of Regulation [No 261/2004]: (a) the time that the aircraft lands on the runway (touchdown); (b) the time that the aircraft reaches its parking position and the parking brakes are engaged or the chocks have been applied (in-block time); (c) the time that the aircraft door is opened; (d) a time defined by the parties in the context of party autonomy? ECJ says that the situation of passengers on a flight does not change substantially when their aircraft touches down on the runway at the destination airport, when that aircraft reaches its parking position and the parking brakes are engaged or when the chocks are applied, as the passengers continue to be subject, in the enclosed space in which they are sitting, to various constraints. Therefore, it is only when the passengers are permitted to leave the aircraft and the order is given to that effect to open the doors of the aircraft that the passengers may in principle resume their normal activities without being subject to those constraints. ECJ rules that it is apparent that Articles 2, 5 and 7 of Regulation No 261/2004 must be interpreted as meaning that the concept of 'arrival time', which is used to determine the length of the delay to which passengers on a flight have been subject, corresponds to the time at which at least one of the doors of the aircraft is opened, the assumption being that, at that moment, the passengers are permitted to leave the aircraft.