• Title/Summary/Keyword: 지상/비행시험

Search Result 225, Processing Time 0.022 seconds

Development of Integrated Ground Support System for Integrated Flight Test of Small UAVs (무인항공기의 통합비행시험을 위한 통합형 지상지원시스템 개발)

  • Jeong, Jae-Hyeon;Lim, Byoung-Do;Kim, Sung-Su;Ryoo, Chang-Kyung
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.40 no.9
    • /
    • pp.800-806
    • /
    • 2012
  • This paper proposes design and development of the Integrated Ground Support System (IGSS) for the flight test of the Unmanned Aerial Vehicle (UAV), which combines ground support and ground control. The integrated flight test of the UAV is a necessary procedure to validate the functionality of the Unmanned Aerial System (UAS). In order to execute cost-effective and systematic flight tests, the IGSS is regarded as an inevitable infrastructure of UAS for small laboratories. The proposed IGSS has functions of ground control, radio communication, power generation, transportation and the maintenance of the UAV.

Assessment of Flight Control Performance based on the Ground Test Results of Smart UAV (스마트 무인기의 지상시험을 통한 비행제어 성능분석)

  • Kang, Young-Shin;Park, Bum-Jin;Yoo, Chang-Sun;Kim, Yu-Shin;Koo, Sam-Ok
    • Aerospace Engineering and Technology
    • /
    • v.9 no.1
    • /
    • pp.1-8
    • /
    • 2010
  • The tilt-rotor Smart UAV(Unmanned Air Vehicle) has been developed by KARI(Korea Aerospace Research Institute) for civil purposes. In order to prove the reliabilities of total system of Smart UAV, the series of ground tests were performed including system interface test, aircraft HILS(Hardware In the Loop Simulation) Test, ground power test, 4-DOF (Degrees of Freedom)rig test, and tethered hover test. Many unexpected problems occurred at each ground test. With clearing these problems, the total Smart UAV systems were matured and the airworthiness was proven enough. After complete of additional ground test proposed by FRRB(Flight Readiness Review Board), the first flight test will be performed in this year. This paper presents the procedures and the analysis results of the ground tests for the tilt-rotor Smart UAV.

액체추진기관 Rocket의 발사를 위한 지상공급시스템 개발

  • 이정호;길경섭;김용욱;조상연;오승협
    • Bulletin of the Korean Space Science Society
    • /
    • 2003.10a
    • /
    • pp.90-90
    • /
    • 2003
  • 한국항공우주연구원은 액체추진기관 시스템을 이용한 3단형과학로켓(이하 KSR-III)을 국내 최초로 개발하여 비행시험을 수행하였다. 액체추진기관 로켓의 비행시험을 위해서는 이전의 고체 추진기관을 이용한 과학로켓 1, 2와는 달리 비행시험 조건에 부합하게 액체추진제 및 가압제 등을 공급하는 지상설비가 필요하다. 이에 한국항공우주연구원은 독자적으로 비행시험에 필요한 제반 설비를 갖춘 발사장을 구축하였다. KSR-III는 압축 헬륨가스(GHe)를 이용하여 연료(Jet A-1)와 산화제(LOx)를 가압하여 추력을 얻는 액체추진기관 시스템이다. 따라서 발사장에서의 지상공급설비는 유공압 설비와 발사시나리오에 따라 해당 부품을 제어하고 자료를 저장하는 제어/계측 설비 및 기타설비들로 구성되어 있다. 지상공급설비 중 유공압 설비는 LOx의 저장 및 기체 내 산화제 탱크의 충전을 위한 산화제 공급설비, Jet A-1의 저장 및 기체 내 연료 탱크의 충전을 위한 연료 공급 설비, 지상설비용 밸브구동 및 기체 내부 퍼지 등에 필요한 질소($N_2$)를 저장/공급하는 설비, 기체내부 밸브 구동 및 가압제로 사용되는 기체헬륨(He)을 저장/공급하는 설비들로 구성되어 있다. 이러한 구축된 공급설비는 기능시험, 연계시험 등의 각종 입증시험을 통해 그 성능을 검증한 후 단인증모델(SQTM)을 이용하여 발사 시나리오에 따른 추진제 공급능력을 입증한 후 KSR-III의 비행시험을 성공적으로 수행하였다. 수행된 연구결과는 향후 건설되어질 우주센터내의 발사장 기반설비 설계의 기초 자료로 활용할 수 있을 것이다.

  • PDF

Implementation and Operational Test of ADS-B System in Goheung Aeronautical Center (고흥항공센터 ADS-B 구축 및 운용시험)

  • Yoo, Chang-Sun;Song, Bok-Sub;Cho, Am;Sung, Ki-Jung;Koo, Sam-Ok
    • Aerospace Engineering and Technology
    • /
    • v.13 no.1
    • /
    • pp.1-9
    • /
    • 2014
  • Goheung aeronautical center is located in the area of Goheung of which land is reclaimed from sea and has a runway of length 700m, width 25m with test facility which has been used for flight test of UAV and small aircraft. To support the enhancement of aircraft safety, 1090ES ADS-B ground system as the ground surveillance system has been implemented. ADS-B system based on GPS and digital data link provides the function of enhancing the aircraft safety through flight information among aircrafts. This paper gives the result that the implementation of ADS-B ground system and the flight test with onboard ADS-B transmitter has been conducted.

A Way to Perform a Helicopter PFAT by KUH Case Study (KUH 사례를 통한 헬기 비행전 수락시험 수행 방안)

  • Lee, Sangmok;Hwang, Jungsun
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.41 no.12
    • /
    • pp.994-1001
    • /
    • 2013
  • Process of helicopter development is divided in design, manufacture and test & evaluation phase. Test & evaluation is performed step by step in order of component test, rig test, system ground test and flight test. After completing ground test and before first flight, US military specification requires 50hrs-PFAT in order to assure flight safety. PFAT is the test which requires tie-down and severe load imposition and it needs special ground test vehicle which is similar to helicopter prototype as well as much cost and period. In case of KUH, we have performed tailored PFAT considering KUH development environment. In this paper, we propose a proper way to perform the PFAT in accordance with development environment by giving KHU PFAT procedure and result.

Comparison Study on Take-Off and Landing Flight Test Using Ground Observation and DGPS Method (지상관측법 및 DGPS 기법을 활용한 이/착륙 성능 비행시험 비교)

  • Lee, Sang-Jong;Chang, Jae-Won;Jeon, Byoung-Ho;Seong, Kiej-Jeong;Yeom, Chan-Hong
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.37 no.9
    • /
    • pp.931-938
    • /
    • 2009
  • The flight test is last means of compliance to satisfy airworthiness standards and important to evaluate the performance and safety of the developed aircraft. The flight test technologies are obtained from great numbers of experiences and know-hows and protected. In addition, flight test should be conducted efficiently since its various test conditions and items. Therefore, it is requisite to secure efficient flight test methods. This paper discusses the flight test methods for take-off and landing performance and two kinds of techniques are proposed. By performing real flight tests, they are compared with each other and analyzed through the flight analysis.

가압공급 방식 액체로켓 엔진 연소 성능 및 수류시험

  • 조남경;이수용;한영민;고영성;정용갑;김영한;문일윤
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2000.11a
    • /
    • pp.9-9
    • /
    • 2000
  • 우주추진기관의 모든 부품은 생산 시 규정된 절차를 거쳐서 작동의 이상유무를 확인하는 시험을 거친다. 우주추진기관은 특별한 경우를 제외하고는 실 비행 상태에서 시험하기가 어렵거나 불편하기 때문에 지상에서 시험을 수행하여 성능 및 안정성 등을 확인하게 된다. 지상연소시험을 수행하기 위해서는 비행용 엔진을 대상으로 엔진 메니폴드에 비행 시와 같은 조건의 추진제가 공급될 수 있게 해줘야 한다. 기존에 시험장이 이미 구축되어 있는 경우 엔진의 운용조건에 맞추어 엔진에 맞게 엔진과 시험설비 연결부분이 수정되게 된다.(중략)

  • PDF

Development and Test of Line-Telemetry DPS for KSLV-I Upper Stage (나로호 상단부 Line-Telemetry 데이터처리시스템 개발 및 시험)

  • Kim, Kwang-Soo;Lee, Soo-Jin;Chung, Eui-Seung
    • Aerospace Engineering and Technology
    • /
    • v.10 no.1
    • /
    • pp.107-115
    • /
    • 2011
  • The line-telemetry data processing system is necessary for monitoring the status of each onboard systems of KSLV-I upper stage during the ground tests and launch preparation. The mission of line-telemetry system is to provide reference telemetry data and to monitor the status of upper stage. The line-telemetry data processing system consists of a PCM acquisition/processing server, a system management server, and 9 monitoring consoles. In this paper, we will describe the overview of onboard remote measurement system, the design of the line-telemetry data processing system, anomaly setup information for indicating alarm signal in case of abnormal occurrence, and the result of the ground test and flight test.

Trouble Shooting for Fully Automatic Flight Test of Small Scaled Tiltrotor UAV (축소형 틸트로터 무인기의 전자동 비행시험을 위한 문제해결과정)

  • Kang, Young-Shin;Park, Bum-Jin;Yoo, Chang-Sun;Koo, Sam-Ok;Lee, Jang-Ho
    • Aerospace Engineering and Technology
    • /
    • v.8 no.1
    • /
    • pp.1-9
    • /
    • 2009
  • The ground integration test of Smart UAV has been performed according to the flight test plan. The flight test of full scaled model will be performed followed by 4 DOF ground rig test and a tethered hover test. Smart UAV is the first indigenous tiltrotor aircraft which can fly with fast cruise speed and take off or land vertically. In order to prove the flight control law of Smart UAV, the 40% scaled airplane was developed and have been tested. During flight test of small scaled model, many unique and unexpected problems occurred. After clearing these problems, fully automatic flight test was performed successfully. The experiences about many trouble shooting and resolving the problems would be basic material to avoid the unexpected but similar flight test problems hidden behind of the full scaled Smart UAV. This paper presents the detailed procedures of trouble shootings to solve the unique problems which occurred during the flight test of small scaled tiltrotor UAV.

  • PDF

F-22 RAPTOR의 모든것

  • Seo, Byeong Hong
    • Aerospace Industry
    • /
    • v.53
    • /
    • pp.44-55
    • /
    • 1997
  • 묘하게도 금년은 미공군 창설 50주년에 해당한다. 이를 기념하듯 금세기 최강의 전투기라는 별명을 가진 F-22가 4월초에 출고되었고 지상 시험을 거친 뒤 지난 5월말에는 마리에타 공장에서 첫비행에 성공했다. 여기서 10회 정도의 비행시험을 거친 뒤 에드워드 공군기지로 보내 제1호기로서 공식적인 비행시험을 실시하게 되어 있다.

  • PDF