• Title/Summary/Keyword: 중수선 시설

Search Result 4, Processing Time 0.016 seconds

Simulation-based Optimal Design Method for the Train Overhaul Maintenance Facility (열차 중수선 시설의 최적 설계를 위한 시뮬레이션 분석 방법)

  • Um, In-Sup;Jeong, Soo-Dong;Oh, Jung-Hun;Lee, Hong-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.2
    • /
    • pp.291-301
    • /
    • 2009
  • This paper presents the optimal design and analysis method of the train overhaul maintenance facility based on the simulation. Because the train is composed of a coach or more, we design the simulation model after analyzing the operation of train into train, coach, coach's body parts and wheel parts and soon. In simulation analysis, we consider the critical (dependent) factors and design (independent) parameters for the selection of alternatives and optimal design. Therefore, Multi Criteria Decision Making (MCDM) is proposed for the selection of alternatives and optimal method in order to find the optimal design factors. The case study for the above approach is used for the electronic locomotive overhaul maintenance facility. This paper provides a comprehensive framework for the train overhaul maintenance facility design using the simulation, MCDM and optimal methods. Therefore, the method developed for this research can be adopted for other enhancements in different but comparable situation.

Optimization for the Design Parameters of Electric Locomotive Overhaul Maintenance Facility (전기 기관차 중수선 시설의 설계 변수 최적화)

  • Um, In-Sup;Cheon, Hyeon-Jae;Lee, Hong-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.2
    • /
    • pp.222-228
    • /
    • 2010
  • In this paper, we propose a optimization approach for the Electric Locomotive Overhaul Maintenance Facility (ELOMF), which aims at the simulation optimization so as to meet the design specification. In simulation design, we consider the critical path and sensitivity analysis of the critical (dependent) factors and the design (independent) parameters for the parameter selection and reduction of the metamodel. Therefore, we construct the multi-objective non-linear programming. The objective function is normalized for the generalization of design parameter while the constraints are composed of the simulation-based regression metamodel for the critical factors and design factor's domain. Then the effective solution procedure based on the pareto optimal solution set is proposed. This approach provides a comprehensive approach for the optimization of Train Overhaul Maintenance Facility(TOMF)'s design parameters using the simulation and metamoels.

An Evaluation of Development Plans for Rolling Stock Maintenance Shop Using Computer Simulation - Emphasizing CDC and Generator Car - (시뮬레이션 기법을 이용한 철도차량 중정비 공장 설계검증 - 디젤동차 및 발전차 중정비 공장을 중심으로 -)

  • Jeon, Byoung-Hack;Jang, Seong-Yong;Lee, Won-Young;Oh, Jeong-Heon
    • Journal of the Korea Society for Simulation
    • /
    • v.18 no.3
    • /
    • pp.23-34
    • /
    • 2009
  • In the railroad rolling stock depot, long-term maintenance tasks is done regularly every two or four year basis to maintain the functionality of equipments and rolling stock body or for the repair operation of the heavily damaged rolling stocks by fatal accidents. This paper addresses the computer simulation model building for the rolling stock maintenance shop for the CDC(Commuter Diesel Car) and Generator Car planned to be constructed at Daejon Rolling Stock Depot, which will be moved from Yongsan Rolling Stock Depot. We evaluated the processing capacity of two layout design alternatives based on the maintenance process chart through the developed simulation models. The performance measures are the number of processed cars per year, the cycle time, shop utilization, work in process and the average number waiting car for input. The simulation result shows that one design alternative outperforms another design alternative in every aspect and superior design alternative can process total 340 number of trains per year 15% more than the proposed target within the current average cycle time.