Most accidents occurred in power receiving & transforming facility are ground fault. The quality of power supply is deteriorated since the ground fault is not detected promptly. This paper analyzes the problems about system-grounding type of 2 step power receiving & transforming facility, arrangement of protection relaying scheme and ground-fault protection system of ungrounded system. Then, this paper presents the arranging scheme of system-grounding type to improve power supply reliability.
Recently, the KEPCO is constructing the PQMS(Power Quality Monitoring System) each of the distribution line and will establish the voltage sag standard based on the long time measurement data of PQMS. The voltage sag prospect is difficult for the power system manager, however, the voltage sag forecasted is very important because the damage effect of the voltage sag is very broad. This paper describes the prospect formula of the voltage sag magnitude in the PCC(Point Common Coupling) by the starting current when the high capacity equipment is connected with the distribution line. To achieve this, this paper has proposed the sag prospect formula revision of KEPCO for the reliability improvement and the proposed formula has been applied the voltage sag real case to inspect the calculation procedure and reliability.
During a ground fault the maximum fault current and neutral to ground voltage will appear at the pole nearest to the fault. Distribution lines are consisted of three phase conductors, an overhead ground wire and a multi-grounded neutral line. In this paper phase to neutral faults were staged at the specified concrete pole along the distribution line and measured the ground fault current distribution in the ground fault current, three poles nearest to the fault point, overhead ground wire and neutral line. A effect by grounding resistance of poles of ground fault current in the 22.9[kV] multi-ground distribution system. by field tests.
This paper explains hybrid method that combines Time domain simulation technique with the direct method of Transient stability analysis. First, it calculate trajectory of real system by Time domain Simulation using OOP(Object Oriented Programming method) and evaluate Transient Energy Function to induce stability index to calculate Transient stability margin. Once the status of system(stable or unstable) has been identified, proper criteria are proposed to stop time-domain simulation to reduce CPU time.
현재 국외에서는 고조파 제어 및 유지를 위해 관리기준이 제정되어 적용되고 있는 실정이나 국내에서는 적당한 기준 및 적용절차가 없어 제대로 고조파를 관리하지 못하고 있는 실정이다. 따라서 국내 송전계통의 특성에 맞으면서 국제 기준의 주요 목적을 반영할 수 있는 고조파 관리기준을 제정할 필요성이 제기되고 있다. 따라서 본 논문에서는 마이크로소프트 엑셀을 이용하여 고압 수용가의 고조파 방출 한계를 평가하는 소프트웨어를 개발하였다.
배전시스템은 고 신뢰도가 요구되는 사례시스템이다. 신뢰도는 정해진 기간과 운전 조건하에서 설비나 시스템이 적절히 자기 기능을 할 수 있는 확률로 정의된다 수용가에서 배전시스템의 성능을 예측하고 검증하기 위한 기본적인 신뢰지수는 평균고장률, 평균고장기간, 평균 활용률 등이 포함된다 본 논문에서는 EDSA의 배전계통 신뢰도 평가 프로그램을 이용하여 배전 시스템의 기본적인 신뢰도 평가지수를 구하고, 수지식 사례 배전시스템을 개선시키기 위한 방법으로 환상식 시스템으로 구성을 변경시켜 수치적으로 얼마나 높은 신뢰도가 얻어졌는지를 보여준다.
The calculation of depth and duration of a sag is in both methods based on two simple assumptions. One is that due to the short circuit, the voltage drops to a low value immediately magnitude. Another is that when the fault is cleared. the voltage recovers immediately. These assumptions, however, do not hold in the case of a substantial part of the load consisting of electrical motors like in many industrial power systems. During the short circuit, the motors will slow down. Their reacceleration after the fault will increase the load current and thus prolong the voltage sag. This paper will discuss some of the aspects of the influence of induction motors on voltage sags.
Recently, power-electronics equipments or machine that microprocessor is included and computers have been installed continuously in industrial process or region of electronics customer. So concern for power quality, especially sags has been increased. Because those equipments are very sensitive to sags. The sag is phenomenon that magnitude of load voltage temporarily decreases because of power system fault. If a certain equipment in industrial process have any trouble result from sag, it can cause utility to be charged for enormous economics loss. Therefore it need to analyze the characteristic of sag and then mitigation method for sags in distribution system in oder to increase reliability. This paper gives an overview of sags characteristic due to short circuit fault in distribution system and after a general discussion of the various forms mitigation, gives a sags mitigation method with concentrating on mitigation-device interface method, especially FCL that is Fault Current Limiter.
This paper studies flicker evaluation considering power quality disturbance. A flicker problem with light device irritates human's eyes. Also, the flicker problem has an influence on adverse effect such as rolling device and rotating device. However, a study of flicker evaluation is not complete. A flicker is measured and evaluated at monitoring point. But we consider power qualify disturbances such as voltage sag and transient that cause fault and inverter/breaker switching. Power quality disturbances affects flicker evaluation. A flicker evaluation index increases. Therefore, we consider power quality disturbances. We detect voltage sag and transient using wavelet and evaluate flicker without flicker index including power quality disturbances.
This paper resents a study on the electric facilities plan and application of low-voltage grid connection for a photovoltaic electric power station. The analysis for an installation cost is carried out and a new plan to solve the problem caused by a voltage drop in a low-voltage grid connection is devised. It is expected that the results can be usefully applied to spread the photovoltaic electric power station.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.