• Title/Summary/Keyword: 전 생애주기 비용

Search Result 26, Processing Time 0.03 seconds

A Linkage Method for the Life Cycle Cost Breakdown Structure through an Analysis of Boundary Conditions (경계조건 분석을 통한 LCCBS 연계방안)

  • Jeong, Jae-Hyuk;Kim, Tae-Hui
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.321-332
    • /
    • 2013
  • Costs and expenses are intertwined and incurred throughout an entire construction project, even from the pre-construction phase, and each phase has a different impact on the life cycle cost (LCC). However, the cost breakdown structure (CBS) is different in each phase of a building construction project, which makes it hard to reasonably calculate construction cost. For this reason, the boundary conditions were analyzed in this study based on the life cycle cost break structure (LCCBS). In addition, breakdown factors were analyzed based on the boundary conditions to derive a linkage method. The validity of the linkage method was verified through application to actual construction projects. Through the analysis, it was found that the problem of items being left out was reduced by more than 97.2 percent, and the work was done an average of 6 hours faster compared to the conventional method. It is expected that by applying the new LCC system, LCC will be both reduced and calculated in a more efficient manner.

An Economic Feasibility Analysis on the Movable Modular Lodging Buildings (이동 가능한 숙박용 모듈러 건축의 경제성 비교 분석에 관한 연구)

  • Lee, Jeehee;Son, JeongWook;Jeong, WoonSeong;Yi, June-Seong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.12-20
    • /
    • 2015
  • Construction industry pays attention to modular construction recently which based on factory production not on labor intensive site production. Since modular construction has high time shortening effect and easiness of demolition and recycling, it has been applied to the temporary residential building. Domestic modular construction market are not activated yet, however, due to the high initial cost to realize modular construction. This study proposes demand-sensitized movable modular building in order to reduce the financial burden. The study compares between RC method building and Modular building which moves building when the demand falls off from Life-Cycle Cost's viewpoint. As a result of the economical evaluation, RC method achieved profits faster than Modular model, but Modular model's gross earnings during the life-cycle are much bigger than RC method. In other words, the result means that the market-sensitized movement of the modular building would be an economci choice in Life-Cycle Costing aspect.

Evaluation of Handover Requirements of Construction Information for Efficient Facility Management (효율적인 자산관리를 위한 건설정보 이양요건 평가)

  • Lee, Ikhaeng;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.12-20
    • /
    • 2018
  • As facilities have become larger, more complex, and advanced, the importance of the facility management in the operation phase of the building is increasing. As a result, the scope of the facility management function is expanding, and the requirements of information are ever-increasing. However, inefficient exchange of information occurs due to duplicated tasks and lack of collaboration among the construction life cycle phases, resulting in cost loss. These low interoperability issues can be complemented by construction information management from a life cycle perspective. Efficient construction information management at each life-cycle stage is derived from the owner's will and is materialized through the construction information handover requirements by the owner. The purpose of this study is to develop an evaluation method of construction information handover requirements for facility management. In order to develop the method, facility management types and business functions are also classified and defined in this paper. Using the methodology proposed by this study, a case-study of evaluating the 'takeover items' submitted by contractors was performed for the purpose of research validation. The results of the case-study found that the most effective areas are in the order of 'legal informations', 'drawings', 'guides', etc. This study can be used as a reference data for deriving handover requirements for construction information at the early stage of the project.

Cost Analysis of VVVF Inverter Train Based on Life-cycle to Determine the Introduction Timing of New Trains (신규차량 도입시기 의사결정을 위한 인버터제어 전동차의 잔여수명에 따른 비용분석)

  • Lee, Kwang-Sub;Lee, Chan Woo;Yang, Keun-Yul;Min, Jae Hong;Shin, Jong Jin
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.1
    • /
    • pp.77-86
    • /
    • 2016
  • Before urban railway vehicles reach their design life-span, operating agencies should determine when to buy new vehicles. Previous LCC (Life Cycle Cost) studies were limited because they independently focused on existing vehicles based on costs that directly impacted only the operating agency without considering effects such as social costs and the reduction of maintenance costs. Thus, it is difficult to systematically determine when to buy new vehicles. This study investigated the operating and maintenance related costs, especially from additional expenses and social costs due to unexpected vehicle failures and safety accidents, and did an economic analysis of scenarios with different discount rates. Considering that the public is very concerned about safety after the Sewol ferry accident, additional costs, which include social costs, should be included in the analysis. This study shows that the economic priority of scenarios may change depending on whether those costs are included and on the discount rate. The results of this study can help in the decision-making process for the planning and buying of new trains.

Assessment of Facility Management Functions for Life-Cycle Information Sharing (생애주기 정보공유를 위한 자산관리 업무기능 분석)

  • Lee, Kwangjin;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.6
    • /
    • pp.40-52
    • /
    • 2016
  • In the 1960s and 1970s when Korea experienced rapid economic growth, a considerable number of buildings were constructed in the country. And since 2000, a large number of sizable and complex buildings have been being built. Specifically, as the operation and maintenance cost alone accounts for 85% of the life cycle cost of a building, efficient Facility Management (FM) is required. However, data needed in the operation and maintenance phase are not sufficiently exchangeable with data created in other phases like the planning, design and construction phases. The upper phase has higher value of data but data exchange rate is low, resulting in inefficiency. To this end, this research derived major business functions for facility management: three categories and 19 detailed functions in classification from owner's perspective. Based on the derived items, this research proposes a methodology to evaluate the 'FM Workload', 'Facility Management (FM) Data', and 'FM Data Created in Engineering and Construction Phases' thereby analyzing plans for efficient operation and maintenance. The applicability of proposed methodology was tested by examining real-world cases of public and private companies.

A Study on the Estimating Process for Life Cycle Cost based on BIM (BIM기반 Life Cycle Cost 산정을 위한 프로세스에 관한 연구)

  • Lee, Hyun-Joo;Moon, Joon-Ho;Park, Gyu-Tae;Kim, Tae-Hee;Kim, Kwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.149-151
    • /
    • 2011
  • Recently, Architectural Design based on Building Information Modeling(BIM) is popular, construction management based on BIM is necessary. such as Quantity take off, scheduling, and Life Cycle Cost Estimating etc. Therefore, in the study, LCC Estimating using BIM Data, which is extracted from architectural designing process is proposed.

  • PDF

A Study on the case study LCA Analysis for the Education and Research Building of S University (S대학교 교육연구동 LCA분석 사례 연구)

  • Bum Sung-Woo;Kim Min-Hyun;Park Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.465-468
    • /
    • 2003
  • It has taken a growing interest about environmental problems such as global warming and water pollution. Because of intensified environmental problems, it would be going on the research about environmental preservation and harmful factor reduction. Also, it makes ISO to show the quantitative data about LCA analysis. The research of LCA method in the domestic construction industry has advanced stealing from a national point of view. In this study, it would be possible to confirm the feasibility of a plan by LCA analysis. Moreover, the result of life cycle cost which deliberate the influence cost of environment in the steps of material production, construction, maintenance, and disposal has made to be 74,819,560,776 won in a plan and 78,979.469,602won in alternative. That is, it would analysis for a plan to reduce 4,159,908,826 won for alternative.

  • PDF

LCCA and LCA to Evaluate Feasibility for Introducing High-Efficiency Motors into Air Ventilation Systems of Public Facilities (고효율 전동기를 다중이용시설 환기설비에 도입하기 위한 LCCA 및 LCA 분석)

  • Quan, Junlong;Choi, Sooho;Kwon, Taehwan;Choi, Hyemi;Kim, Juhyung;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.41-49
    • /
    • 2015
  • The amount of energy consumed in air ventilation systems of public facilities accounts for 40% of their total energy consumption. To reduce their energy consumption, applying variable speed operation controlled by an inverter with a high-efficiency motor is suggested. Since these methods require higher initial investment costs compared to the existing systems, economic evaluation should be conducted from a long-term perspective. While LCCA(Life Cycle Cost Analysis) model is useful to estimate net savings of alternatives that differs with respect to initial costs and operating costs, the environmental burdens are not considered. On the contrary LCA(Life Cycle Assesment) model is suitable to assess environmental impacts associated with the stages of a product's life but it does not consider costs. In this study, the high-efficient motors are introduced into the air ventilation system of a subway station and a comprehensive analysis on the economic and environmental impacts of the proposed method is conducted by using LCCA and LCA model.

On Analysis of Undertaking Accomplishment Process for the BTL Project (BTL사업의 사업수행 절차 분석에 관한 연구)

  • Chun, Jin-Ku;Lim, Jong-Ah;Park, Young-Dae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.917-920
    • /
    • 2007
  • Private companies will get back their investment by leasing facilities to the government, Since act on private participation in infrastructure were changed in January 2005, BTL(Build Transfer Lease) project of introduced in the domestic construction market for the purpose of providing public facilities with the public. BTL projects is for with approximately project life cycle form plan to maintenance the success of the project totally depends on the capability and role of concessionaire. Accordingly, this study is aimed to improve in order to proceed with BTL project efficiently, a clear standard for the item of evaluation was presented.

  • PDF

Decision Making Process for Wind Barrier Installation Considering Car Accident Risk (차량사고 위험도를 고려한 방풍벽 설치기준)

  • Kim, Dong-Hyun;Lee, Il-Keun;Kwon, Soon-Duck;Jo, Byung-Wan
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.23 no.1
    • /
    • pp.17-26
    • /
    • 2010
  • This study presents a decision making process for installation of wind barrier which is used to reduce the wind acting on running vehicle on expressway. At the first stage of this study, the lateral deviations of running vehicles under side winds were computed from the commercial softwares, CarSim and TruckSim, and then the critical wind speeds for car accident were evaluated from predefined risk index. To determine whether it is needed to install wind barrier or not, cost and benefit from wind barrier are calculated during lifetime. In obtaining car accidental risk, probabilistic distribution of wind speed, daily traffic volume, mixture ratio in the volume, and duration time for wind speed range are considered. It is recommended to install wind barrier if benefit from the barrier installation exceed construction cost. In the numerical examples, case studies were shown for risk and benefit calculation and main risky regions on Korean highway were all evaluated to identify the number of installation sites.