이 논문은 캄보디아 전력산업의 현황과 캄보디아 정부를 대상으로 진행하고 있는 장기전원개발계획 수립 자문용역의 주요 결과를 소개한다. 현재 캄보디아는 수도인 Phnom Penh 지역에만 일부 계통망이 구축되어 있을 뿐 전국적인 계통망이 구축되어 있지 않아 매우 제한적인 전력사용이 이루어지고 있다. 하지만, 향후 2012년까지 전국 주요 지역을 연결하는 송전계통망의 구축이 완료되고, 인근국가인 태국, 베트남, 라오스와의 계통망 연계, 대용량 수력발전설비의 건설이 완료되면 규모의 경제가 확보되어 전력 사용에 대한 환경이 크게 개선될 것으로 예상된다. 이러한 전원개발계획을 위하여 WASP전산모형을 사용하여 구한 결과를 제시한다. 캄보디아 계통망에 연결된 전체 설비용량은 '05년말 220MW에서 '24년 2,090MW로 연평균 15%씩 증가할 것으로 예상된다.
Auto-synchonizer is important device to match the voltage, frequency, phase of the generating system to those factors of the transmission line, when the synchronous generator is operated. There were few or no incidents by Synchronization failure at Hapcheon hydraulic power plant, since it was built in 1989. but incidents by Synchronization failure have often happend lately. From now, let's improve the efficiency on the maintenance of generating equipment by studying about the cause and the method for this problem by comparing with the set point of each device of synchronizing system.
This paper addresses the bidding strategies of a hydro generator in an electricity market, and their effect on the electricity market in accordance with some parameters: the water volume, the demand elasticity, and the hydro unit performance. The competition of a hydro generator is formulated as a hi-level optimization problem, and the solving scheme for the equilibrium condition is proposed as a set of nonlinear simultaneous equations. The equilibrium of the oligopolistic model is evaluated by comparison with that of a perfect competition model from the viewpoint of a market power.
Our company(KOWACO) has periodically performed off-line diagnostic test for 14 hydro generators (rated 11 kV over) for 15 years. In this paper, we summarized results of dissipation factor tip-up test and partial discharge test about these generators. Among these, we chose two generators and performed insulation reinforcement (cleaning and varnish Painting). We compared change of insulation condition for the stator winding based upon off-line diagnostic test result before and after repair. Test result shows that insulation condition was improved after insulation reinforcement. This insulation reinforcement has a function to reduce cause of deterioration, so we can know that it extends lifetime of generator and it is a very important factor for stable operation of facilities.
The air-cooled waterwheel generator has a fan connected to waterwheel shaft or motor driven fan or fans. The fans are operated at constant speed, constant input, regardless of generator loss which is varied according to generator output and coolant the perature. Energy savings may he possible if the cooling air flow is controlled according to generato output and air temperature depending on season. The simulation and experience have been done on the 22.6 KVA Waterwheel generator by using AC variable speed drive. The results gave us los cut of generator.
The production costing plays a key role in power system expansion and operations planning especially for the calculation of expected energy, loss of load probability and unserved energy. Therefore, it is crucial to develope a probabilistic production costing algorithm which gives sufficiently precise results within a reasonable computational time. In this respect, a number of methods of solving production simulation have been proposed. In previous paper we proposed the method used Fast Hartley Transform in convolution process with considering only the thermal units. In this paper, the method considering the scheduling of pumped-storage plants and hydro plants with energy constraints is proposed.
The control performances of a fuzzy controller depend on its control rules, I/O membership functions, and scaling factors. Scaling factors are very important to adjust control parameters to the process which is to be controlled. For tuning the sealing factors, trial and error method is used in conventional fuzzy controller, which is very difficult and time consuming. This paper proposes a tuning method of scaling factors based on the concept of tuning rules for the conventional Pl controller parameters. The proposed automatic tuning fuzzy controller was evaluated by computer simulations. Good results have been obtained for the small hydro power plant.
The remaining life of generator stator winding has been the controversial issue amomg many experts in this area. The report from Japan claims that they can predict the remaining life of generator winding, while the North American has the negative opinion about it. This study aimed at verifying the validity of both Japanese criteria and North American argument on evaluation of generator winding insulation. Non destructive and destructive tests were performed on two hydro-generators. The test results showed that the trend analysis of stator winding insulation was the better option.
Automatic control equipment in hydro power plant, such as turbine governor or automatic voltage regulator have to act promptly against for variation of power system, so it is necessary to check and test continuously. During last five years, the performance test of automatic control equipment was performed about 20 units of hydro turbine generator. In this process, because it has complex connection and before calibration, signal conditioner was developed as an auxiliary equipment for performance test. It includes function of signal amplifier, transducer, and meters. As a result of use this equipment for electric governor test at soyang-gang hydro power plant, it was possible to find output data equal to old one.
This paper presents application of RCM(Reliability Centered Maintenance) in waterworks system. The reliability-based probability model for predicting the failure probability is established and FTA(Fault Tree Analysis) is proposed to considering RCM. To calculate failure probability, Weibull distribution is usually used due to age related reliability. FTA is an engineering analysis which is using logic symbols. The real historical data of CMMS(Computerized Maintenance Management System) make full use of case study for waterworks system. Consequently, the RCM would be likely to permit utilities to reduce overall costs in maintenance and improve the total benefit.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.