• Title/Summary/Keyword: 작업 생산성 손실

Search Result 53, Processing Time 0.026 seconds

A calculation method on the loss of labor productivity due to change orders (설계변경으로 인한 작업 생산성 손실 산정방법)

  • Jeon Yong-Deok;Lee Jae-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.295-300
    • /
    • 2001
  • Additional costs as well as schedule delay are occurred due to change orders in today's construction projects. Additional costs, overhead calculation methods are of various types. In a foreign country cases, many claims related to the loss of labor productivity quote research statistics data. In domestic cases, the study of the reason why the loss of labor productivity occurs and its effect have not been performed. Therefore, this paper analyzes factors affecting lost productivity and a methodology is presented to estimate the lost productivity.

  • PDF

A Case Study on Efficiency Analysis of Cable Logging Operation in Korea (국내 가선집재 작업의 효율성 분석에 관한 사례연구)

  • You, JoungWon;Han, Hee;Chung, JooSang
    • Journal of agriculture & life science
    • /
    • v.53 no.6
    • /
    • pp.35-44
    • /
    • 2019
  • The objectives of this study were to identify engineering problems in the design and installation of cable logging operation that affects productivity through case study of actual logging sites, and to analyze associated productivity loss and increased cost. As a result of the study, when the geographic conditions and engineering safety of the site are not sufficiently considered, deflection of the cable line can not be secured. Hourly productivity of the operation decreased to 65% and the logging cost increased by more than two times compared to the productive yarding operation, which lowered overall efficiency of the operation. Thus, it is required to spread filed technologies that minimize unnecessary production cost incurred due to the in-efficient logging operations as well as secure work safety and efficiency to expand cable logging operation throughout the country.

A Study on the Estimation of Change Orders Impact for the Public Construction (공공건설공사 설계변경에 따른 손실 추정에 관한 기초연구)

  • Lee, Min-Jae;Park, Bum-Jin;Im, Keon-Soon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.363-369
    • /
    • 2008
  • Change is inevitable and is a reality of construction projects. Change adjustment includes the cost associated with materials, labor, etc. However, the actions of a contractor can cause a loss of productivity and furthermore can result in disruption of the whole project because of a cumulative or ripple effect. Because of its complicated nature, it becomes a complex issue to determine the cumulative impact (ripple effect) caused by single or multiple change orders. Furthermore, owners and contractors do not always agree on the adjusted contract price for the cumulative impact of the changes. What is needed is a reliable method to identify and quantify the loss of productivity caused by cumulative impact of change orders. This study survey the change orders data in domestic area for public construction and analyze to quantify change order impact. This study developed concepts of "%CO", "%Delta", "%T" to capture change order effect on project and search the relationships between them. Finally, this study find strong relationship between change order and loss.

생체역학적 분석을 이용한 냉동창고 출하작업의 누적 외상성 장애 위험성에 관한 연구

  • 정경무;장성록
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 1998.05a
    • /
    • pp.313-318
    • /
    • 1998
  • 현대사회의 과학기술 발전은 반세기 전만하여도 거의 상상할 수 없을 정도로 빠른 속도로 발전하고 있으며, 이에 맞추어 생산시스템도 자동화되어가고 있는 추세이다. 그러나 아직도 생산작업의 약 1/3 정도가 사람의 인력에 의해 수행되고 있으며, 이에 따라 많은 산업재해도 발생하고 있다. 우리나라의 1993년부터 1996년까지의 산업재해 현황을 보면, 재해율은 감소추세를 보이고 있지만 산업재해 보상금과 간접 손실액을 합한 총 경제적 손실액은 오히려 증가추세를 보이고 있다. 또한 그 액수도 1956년에는 6조 7천억원에 달해 천문학적 수치를 보이고 있는 실정이다. (중략)

  • PDF

Analysis of Design Error Types in Business Process Modeling (비즈니스 프로세스 모델에서의 설계 오류 유형 분석)

  • Gun-Woo Kim;Jeong Hwa Lee;Jae Hyung Kim;Jin Hyun Son
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2008.11a
    • /
    • pp.665-668
    • /
    • 2008
  • 비즈니스 프로세스란 기업의 모든 고객에게 적절한 서비스를 제공하기 위해 순차적 또는 동시적으로 발생할 수 있는 모든 연관된 업무의 집합을 의미한다. 이러한 비즈니스 프로세스는 프로세스 설계 작업을 통하여 시스템 차원에서 관리함으로써 프로세스의 생산성 및 효율성 등을 확대하게 된다. 하지만 프로세스 설계 작업은 주로 사람에 의해 수행되기 때문에 예상하지 못한 오류들이 발생할 수 있게 된다. 이러한 설계 오류들은 기업이 원하는 과정으로 프로세스가 진행하지 않을 수 있으며, 이는 기업의 막대한 인적 손실 및 비용 손실을 초래하게 된다. 그러므로 비즈니스 프로세스 설계 단계에서 오류가 없도록 설계 하거나 또는 미리 정의된 오류 유형들을 설계 도구를 통하여 검출 할 수 있는 작업이 필요하다. 본 논문에서는 비즈니스 프로세스 설계 단계에서의 오류 검출 작업에 활용될 수 있도록 유형 별로 설계 오류들을 분석 하고 정의하였다.

A Plan for Better Productivity of Sub-Contractors through Improvements of Daily Reporting Process (작업일보 작성프로세스 개선을 통한 협력업체 생산성 향상방안에 관한 연구)

  • Kim Bong-Nyoun;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.375-378
    • /
    • 2002
  • Most construction works in a building site are progressed by many work categories and sub-contractors. Therefore there are many difficult things of management of construction-information because variable occurrences are happened to manpower and material resources. For this reason, various management systems are suggested, but the application of these systems are difficult because only construction company manages these systems and sub-contractor's participation, understanding and financial ability are insufficient. In addition to that, there are other problems such as lost information when it is carried, perversion and distrust of information by hand and lots of time and labor are necessary for collection, analysis, and management of information which are offered for daily report. so the purpose of this study is for improvement of reporting process with making an analysis of productivity effects and an analysis of function and problem of daily report. I intend to suggest the direction of improved daily report system for better productivity of construction work through input information and management of cooperation enterprises.

  • PDF

Development New Inverter System for Linkage Control of Punching M/C (Punching M/C의 연동 제어를 위한 새로운 Inverter System개발)

  • 조현섭
    • Proceedings of the KAIS Fall Conference
    • /
    • 2002.05a
    • /
    • pp.212-214
    • /
    • 2002
  • 본 논문에서는 기존 공정 Line중 TG Feed Back방식을 이용한 Control System은 매우 고가(高價)인 외산 TG임에도 불구하고 구동 Motor의 발열로 인하여 전압 검출부 Cabon Brush의 잦은 마모로 인한 오동작으로 작업의 문제점이 표출되어 생산성이 저하되고 품질 불만 및 불량품 발생으로 생산성에 큰 손실을 입고 있다. 이러한 문제점을 해결하기 위하여 본 연구에서는 새로운 Inverter Control System을 개발하였다. 여기에 따른 파급 효과는 제품의 생산성 향상과 소모성 부품의 수입 대처 및 부분적 제어시스템의 국산화 효과를 확보 할 수 있다.

근골격계 질환에 대한 접근방향과 대책

  • 이관석
    • Bulletin of the Korean Institute for Industrial Safety
    • /
    • v.3 no.1
    • /
    • pp.1-5
    • /
    • 2003
  • 작업관련 근골격계 질환은 최근 사업장의 집단적인 발병, 산업재해자수의 급증 등으로 인하여 주된 문제가 되고 있다. 특히, 자동차, 선박 등의 제조업에서 이러한 문제는 노사간의 갈등을 야기하는 주 요인으로 작용하여 사회적 이슈로 대두되었다. 이러한 산업재해 율 증가는 근골격계질환의 뇌심 혈관질환 등 작업관련성질환이 주도하고 있는 현상이다. 특히, 단순반복작업, 중량물 취급작업, 부적절한 작업자세 등에 의하여 신체에 과도한 부담을 주었을 때 나타나는 요통, 경견완장해 등 근골격계 질환은 매년 급증하고 있으며 향후에도 지속적인 증가가 예상된다. 이로 인하여 생산성 저하, 근로의욕저하, 품질저하 등으로 경영손실은 물론 직접 의료비의 부담이 커지고 있는 실정이다. 이와 동시에 근골격계 질환에 대한 직원들의 보상과 작업조건 개선에 대한 요구는 점차 증가하고 있고, 가장 중요한 노$.$사간의 쟁점사항으로 부각되고 있다. 정부에서는 근골격계 질환 예방대책으로 '근골격계 부담 작업으고 인한 건강장해예방' 편을 입법화를 하였으며 근골격계 예방팀을 구성하여 대책 마련에 고심 중에 있다.(중략)

  • PDF

The effects of MMH task conditions on muscle activity and fatigue of the trunk musculature (MMH 작업조건에 따른 몸통부위 근육군의 활동변화에 관한 연구)

  • 이욱기;김상호;정민근
    • Proceedings of the ESK Conference
    • /
    • 1993.10a
    • /
    • pp.223-235
    • /
    • 1993
  • 요통(Lowback Pain)을 유발하는 주요원인으로 알려져있는 MMH(Manual Materials Handling) 작업에 있어서 작업조건의 변화가 근육의 활동과 피로도에 미치는 영향을 평가하기 위해 4가지 서로 다른 작업조건하에서 몸통부위(Trunk)의 주요근육에 대한 EMG 파형분석을 실시 하였다. 본 연구에서의 분석대항작업은 실제 작업조건과 유사하레 설계된 120분간의 단속적인 인양(Lifting)/하역(Lowering) 작업으로서 작업중량은 작업자의 MVIS(Maximum Voluntary Isometric Strength)를 기준으로 설정되었으며, 매 10분 간격으로 EMG 측정이 이루어졌다. 작업물이 작업자의 정면에 위치한 대칭형(Symmetric) 작업의 경우 배면부(Dorsal) 근육인 천극근(Erector Spinae)과 활배근(Latissimus Dorsi)이 활동근(Active Muscle)인 것으로 나타났으며, 정중면(Medial Plane)을 중심으로 좌우측 근육이 동일한 근력을 발휘하였다. 작업물이 작업자의 한쪽 측면에 위치한 90도 비대칭형(Asymmetric) 작업의 경우 천극근과 활배근외에 작업물과 반대쪽 외사근(External Oblique)이 활동근으로 추가되었으며, 작업물과 반대쪽의 근육들이 더욱 큰 근력을 발휘하였다. 작업의 반복에 따른 근육의 피로도를 평가하기 위해 실시한 EMG 파형의 Spectral Analysis 결과, 비대칭형 작업시 작업물과 반대쪽의 천극근에서 작업시간의 경과에 따라 중위주파수(Median Power Frequency)가 저주 파수대로 천이(Lower Shift)하는 현상이 나타났으며, 일정한 작업량이라도 작업중량을 줄이고 작업 빈도를 높여서 작업할 경우에 이러한 현상이 더욱 두드러졌다. 작업시간의 경과에 따른 MVIS의 감소 현상은 작업빈도가 높고 비대칭형 작업일 때 가장 크게 나타났다. 총손실을 줄이고, 상대적 비용절감효과를 갖게할 수 있다고 하였다. 따라서 본 연구에서는 성인 여성기성복의 치수적합성을 높이기위하여 출산 후 중년에 접어 들면서 체형이 변화되는 것을 고려하여 연령을 분류하고(18세-34세, 30세-51세), 각 연령 집단에 따른 체형을 각각 3가지로 분류하였다. 이에 따라 의복 생산시의 총손실을 줄이기위한 상의, 하의생산시 필요한 부위별 최적규격치 간격을 제시하였다.적인 기능으로 보여지는 것에 좁혀서 작업능력의 연령증가 변화에 대하여다원적 평가를 하는 것이 실제적이라고 할 수 있다. 따라서 본 연구에서는 인간이 가지고 있는 다수의 기능중에서 수지교 치성과 연령증가와의 관계를 조사한다. 만약 연령증가 만으로 수지교치성을 평가 할 수 없는 경우에는 어떠한 요인이 수지기민성의 변화에 영향을 미치는가를 검토한다.t list)에서 자동적으로 사건들의 순서가 결정되도록 확장하였으며, 설비 제어방식에 있어서도 FIFO, LIFO, 우선 순위 방식등을 선택할 수 있도록 확장하였다. SIMPLE는 자료구조 및 프로그램이 공개되어 있으므로 프로그래머가 원하는 기능을 쉽게 추가할 수 있는 장점도 있다. 아울러 SMPLE에서 새로이 추가된 자료구조와 함수 및 설비제어 방식등을 활용하여 실제 중형급 시스템에 대한 시뮬레이션 구현과 시스템 분석의 예를 보인다._3$", chain segment, with the activation energy of carriers from the shallow trap with 0.4[eV], in he amorphous regions.의 증발산율은 우기의 기상자료를 이용하여 구한 결과 0.05 - 0.10 mm/hr 의 범위로서 이로 인한 강우손실량은 큰 의미가 없음을 알았다.재발이 나타난 3례의 환자를 제외한 9례 (75%)에서는 현재까지 재발소견을 보이지 않고 있다. 이러한 결과는 다른 보고자들과 유사한 결과를

  • PDF